logo
Thompson looks to diversify from mining into other industries, including tourism

Thompson looks to diversify from mining into other industries, including tourism

CBC28-02-2025

Northern Manitoba's largest urban centre is looking to diversify and rebrand, shifting the perception of Thompson as a mining town to instead encourage people to think of it as a northern hub for services like education and health care, as well as a tourism hot spot.
Business leaders, politicians and other experts gathered to discuss the future of Thompson and the north at this week's Linkages conference — a conference about the future of northern Manitoba organized by University College of the North in the city.
"Thompson's been here for 60 years, and when it was actually first built, it was built as a mining town," Mayor Colleen Smook said in an interview.
"I think more importantly is Thompson as being a hub of the north," which would require expansions for hospitals and education facilities to become a service centre to the rest of northern Manitoba, she said.
While the city itself has a population of around 13,000, it's a service hub for many other northern Manitoba communities with a combined population of around 60,000, according to the mayor.
The city is also looking to expand beyond mining into other industries, like cold-weather testing, aviation and modular home construction, while using its natural resources and culture to draw more tourists in, said Smook.
"We've talked with different people, with whether it even be building modular homes to go out to the different communities [in the north]," she said.
"Right now, you get homes that are built down south," which aren't always suited for the northern environment, said Smook.
The mayor added she isn't dismissing the impact of mining on Thompson's economy, but she wants to look at options for when that industry faces a downturn.
Vale SA, the parent company of Thompson's nickel mining operation, announced a potential sale of the operation earlier this year, raising concerns about its future.
Vale owns two mines and a mill in the city, but over the years, the number of jobs at the mine has shrunk to about 900 employees currently. Many jobs were lost when Vale shut down its smelter — which extracts base metal out of ore — in 2018. Now, the raw ore is shipped off to other provinces to be processed.
Though what would become the city of Thompson was first built up after the discovery of a major nickel deposit in the 1950s, it wasn't officially incorporated as a community until 1967.
Smook said she's proud of where Thompson has come over the past 60 years, but said she wants to see even more diversification. The community has the resources required for new industry, she said.
"We have all kinds of land mass up here. We have the hydroelectric [generating capacity] right up here. So you've got cheap power, fresh air, clean air," said Smook.
Tourism an opportunity for Thompson: speaker
Ashley Dunlop, who is the director of talent and workforce development for Economic Development Winnipeg and runs a tool that helps match job seekers with employers, attended this week's conference to learn more about labour needs in Thompson.
She said she was impressed with the resources available in the northern city, which is the sixth-largest in Manitoba.
"This is a big town — there's a hospital, there's an airport, there is [University College of the North]," she said.
"All of those things need staff. All of those staff need places to live. All of those staff need something to do on the weekend. All of those staff need someone to sell them a car or fix their snowmobile."
While mining is still a big part of Thompson, other industries are catching up, mainly education, health care and hospitality, said Dunlop.
That diversification is what attracted Eric Termuende, a leadership consultant from British Columbia, to come to Thompson to speak at the conference.
Termuende said he was inspired by the pride northern Manitobans have for the north, and thinks Thompson should try to replicate the work of communities like Churchill in embracing tourism as a major industry.
"Tourism is another opportunity" for Thompson, he said. "I think Churchill has done an incredible job from branding themselves on a global stage as a tourism opportunity and tourism destination."
Smook said tourism has been growing in Thompson.
Other attendees at the conference also said they would like the region to be a destination for adventure and eco-tourism, taking advantage of the unique northern culture and the region's pristine wilderness.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Dismantling of Sudbury's Superstack could start this summer, says Vale
Dismantling of Sudbury's Superstack could start this summer, says Vale

CBC

time16-05-2025

  • CBC

Dismantling of Sudbury's Superstack could start this summer, says Vale

If all goes to plan, mining giant Vale will start dismantling the iconic Superstack in the northern Ontario city of Sudbury this summer. Built in 1972, the 381-metre chimney located at the Copper Cliff smelter is the tallest in the Western Hemisphere. The Superstack was built to spread sulphur dioxide emissions, diluting them over a wide geographic area. But in 2018, after years in delays complying with new government environmental regulations, Vale completed its $1-billion Clean Atmospheric Emissions Reduction (AER) project which reduced those emissions by 85 per cent. The company built two smaller stacks to replace Superstack, which was no longer needed. The Superstack has been inactive since 2020, and Vale has been working on plans to safely dismantle the structure since then. "In order to eliminate the risk of deterioration or anything else, we need to take it down," said Paul Guenette, the project lead for Vale's Superstack dismantling. Because the Superstack sits atop a working processing facility, and near homes in Sudbury's Copper Cliff neighbourhood, Guenette said an implosion was out of the question. The company looked at a lot of different ideas to take down the massive concrete structure. "I had my own where we kind of dug a hole underneath to make it sink," Guenette said. They landed on a plan to dismantle it from the top down. Crews have finished building two elevators on the outside of the stack to lift people and equipment up and down. "We'll be setting up a platform at the very top, which is what they're doing today for the next couple of weeks," Guenette said. "After that, probably later on this summer, we're going to see this proprietary piece of equipment that's going to be hoisted up from the inside. It's going to sit on the concrete at the very top, and it's gonna essentially cut pieces of the concrete and make it fall on the inside." Guenette said the work will be done without interrupting work at the smelter below. As the machine dismantles one level of the Superstack, crews will lower it until it eventually reaches the bottom, which could take five years. He said the machine will be operated remotely, although six workers will be at the top to clean up and make sure all debris falls inside the Superstack, where there's no risk of harm. While some people consider the Superstack to be an eyesore, it's also a recognizable part of Sudbury's skyline. Guenette said he has mixed feelings about dismantling the landmark.

Sudbury, Ont., mayor not phased over what tariffs could mean for nickel mining
Sudbury, Ont., mayor not phased over what tariffs could mean for nickel mining

CBC

time21-03-2025

  • CBC

Sudbury, Ont., mayor not phased over what tariffs could mean for nickel mining

The U.S. only has one nickel mine and it would take years to start new ones Sudbury's mayor says he's not worried that an ongoing trade war between Canada and the United States will hurt the city's nickel exports to the south. "I believe critical minerals, which obviously we are endowed with here in Greater Sudbury, play a role to maybe bridge that divide that we are currently living with the U.S. administration," said Sudbury Mayor Paul Lefebvre. "For them to realize the importance that they can't source this in the U.S." Lefebvre noted that the U.S. only has one active nickel mine, located in Michigan's Upper Peninsula, and it would take years, if not a decade, for that country to open more mines for the critical mineral. The ore from that American mine is also processed at a facility owned by mining giant Vale, in Sudbury. While Sudbury's two nickel miners – Vale and Glencore – could be shielded from tariff threats, they have been hit by low nickel prices, which are currently hovering around $7 US per pound. At a talk hosted by the Greater Sudbury Chamber of Commerce on Wednesday, Gord Gilpin, Vale's director of Ontario operations for base metals, said the company had to recently lay off some workers to remain competitive, but did not say how many. "You know we're facing a real need to simplify our business and as a consequence of that, unfortunately we've had to make some tough, tough choices, but they are for the better of the business longer term," Gilpin told reporters after his keynote address. But Lefebvre said both Vale and Glencore continue to invest in mineral exploration in the region, with the former investing $250 million over the next three years to find new deposits. Lefebvre added that he sees potential for Sudbury to build a nickel sulfate processing plant, which is a key component of electric vehicle batteries. Vale is building such a plant in Bécancour, Que., which will be the first of its kind in Canada. The plant will use nickel pellets and rounds from its refineries in Sudbury and Long Harbour, N.L. and dissolve them in a mixture of sulfuric acid, hydrogen peroxide and water to make the nickel sulfate. Lefebvre said he's been in conversations with business leaders and the chiefs of nearby Wahnapitae First Nation and Atikameksheng Anishnawbek about moving ahead with such a facility in Sudbury. "I've been advocating for this as another level of keeping our ore, our nickel here for longer as we can do the advanced processing and create the jobs that we deserve here," he said.

Sudbury Vale boss talks about need for job cuts and the dismantling of the Superstack
Sudbury Vale boss talks about need for job cuts and the dismantling of the Superstack

CBC

time20-03-2025

  • CBC

Sudbury Vale boss talks about need for job cuts and the dismantling of the Superstack

Social Sharing The head of Vale's mines, mill and smelter in Sudbury says they recently had to layoff some workers in order to stay competitive. But director of Ontario operations Gord Gilpin did not say how many non-union jobs were cut in the past few months. And he wouldn't rule out further layoffs to the mining company's Sudbury workforce of 4,000 people. "You know we're facing a real need to simplify our business and as a consequence of that, unfortunately we've had to make some tough, tough choices, but they are for the better of the business longer term," Gilpin told reporters, after addressing a chamber of commerce luncheon on Wedndesday. He was also asked about the sluggish price of nickel, which is currently hovering around the $7 US per pound mark. While it has historically gone through boom-and-bust cycles, it has been in a prolonged gully for over a decade now. "We are concerned, but at the same time, I think we're blessed with a great endowment, a pro-mining community," Gilpin said. "But the reality is the world changing with the amount of nickel that's coming on the market and we've got to stay competitive." During his speech, Gilpin updated the crowd on several projects the mining company is working on around the Sudbury basin, including the new Stobie open pit mine, the planned expansion of the Copper Cliff mine and the long awaited "dismantling" of the Superstack. The landmark 381-metre smokestack has dominated the local skyline for over 50 years, but with the steady reduction of sulphur emissions over the decades, the stack was decommissioned in 2020. Gilpin says he understands that the Superstack is a "very meaningful, very important" symbol for Sudbury, but that it "doesn't make sense" to keep it standing in the middle of the Copper Cliff smelter complex, saying Vale spends "a lot of money maintaining that to keep it safe." He said the work to take it down is set to get underway by the end of this summer. Asked about the current trade war with the United States and how that could affect the electric vehicle battery market for nickel, especially considering a 2022 supply agreement Vale made with Elon Musk's Tesla, Gilpin told reporters its tough to make plans amid the current uncertainty. "It's something we're concerned about. It's something that we're looking at, thinking about. But until we get through this period of volatility, it's kind of impossible to predict, where that's going to go," he said.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store