
Arrival of First Modules at Woodfibre LNG Marks New Milestone for Canadian LNG
The pipe rack modules are fully completed structural steel frameworks that house and support piping carrying liquefied natural gas from the facility's liquefaction unit to the Floating Storage Tanks and loading facility. From there, LNG will be loaded onto carriers for delivery to overseas markets.
"This is a huge milestone for the Woodfibre LNG project as it's the start of our facility going vertical - where people will really start to see the facility take shape," said Luke Schauerte, CEO of Woodfibre LNG. "But it's also bigger than that. These first modules are a significant step forward in diversifying Canada's energy export market, providing global customers with responsibly produced energy and ensuring Canadians receive maximum benefit for their resources."
The modules will now be offloaded at the Woodfibre LNG facility through the project's newly completed Marine Offloading Facility, a purpose-built offload dock designed to handle the delivery of large modules throughout the construction phase. Following offloading, the modules will be moved into place and mounted on their permanent foundations.
A total of 19 modules will arrive to the Woodfibre LNG site throughout the rest of 2025 and into 2026, ranging in size from a 126 tonne pipe rack to an almost 11,000 tonne liquefaction unit that covers roughly the same amount of space as a football field.
"We are doing everything we can at Woodfibre LNG to bring our product to market as soon as possible. With modules arriving, we've hit a tremendously exciting and important phase where our site will change rapidly over the coming months. We're focused on working safely and efficiently to move this project forward and complete the province's first net zero LNG export facility," continued Schauerte.
About Woodfibre LNG
The Woodfibre LNG Project is a liquefied natural gas (LNG) facility that will produce 2.1 million tonnes of LNG for export annually, being built near the community of Squamish on the traditional territory of the Sḵwx̱wú7mesh Úxwumixw (Squamish Nation). The Woodfibre LNG Project is owned by Woodfibre LNG Limited Partnership, owned 70 per cent by Pacific Energy Corporation (Canada) Limited and 30 per cent by Enbridge Inc.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


CTV News
3 hours ago
- CTV News
‘Team Canada is still at the table': Trade council member Volpe on Canada-U.S. trade talks
APMA President and Canada-U.S. relations council member Flavio Volpe joins CTV to give an update on the on-going Canada-U.S. trade deal.


CTV News
3 hours ago
- CTV News
‘We are close to an end': Union negotiator Gallant on Canada Post contract negotiations
Watch Unionized workers at Canada Post voted to reject the corporation's latest contract offer, CUPW's Jim Gallant joins CTV to discuss how an end may be in sight.


National Post
5 hours ago
- National Post
Sportsnet tennis debacle reveals the have and have nots in Rogers sports empire
As a popular Canadian athlete and Olympic medallist, appearing at the downtown dome to toss out a ceremonial first pitch prior to a recent Blue Jays home game, the cross-promotion made sense for tennis player Felix Auger-Aliassime. Article content A Rogers-sponsored athlete at the Rogers Centre for a Rogers-owned pro team to help pump up an event in which Rogers is the presenting sponsor. Article content Article content Article content All the more reason, then, for those in the Auger-Aliassime camp and Tennis Canada to be miffed at how the Rogers-owned network broadcasting this week's National Bank Open at York University dropped the ball. Article content Sportsnet's decision not to produce its coverage of opening week action of the NBO in both Toronto (men) and Montreal (women) has not sat well with many of the principals involved with Canada's marquee event for the sport. Article content Though reluctant to criticize their broadcast partner directly and publicly, behind the scene Tennis Canada and tournament officials are miffed at Sportsnet's cost-cutting moves during the early rounds, opting for the ATP world feed for the first week of play. Article content (On Saturday through next weekend's finals, Sportsnet's regular, top-notch tennis crews were back in action in both Montreal and Toronto, as were the network's own producers.) Article content Even that development has come with some trimmed corners, however. There will be production crews on site at both venues, as well as those calling the action. Studio coverage will be from Rogers headquarters, however, eliminating the possibility of big-name players dropping by the set for interviews. Article content Article content The most egregious shortfall took place on Wednesday, however, when Auger-Aliassime's match, a tense straight-set loss to Hungary's Fabian Marozsan, was not shown at all on Sportsnet. Tennis Canada officials had purposely scheduled the popular Canadian in prime time and on the stadium court to maximize the audience — a win-win exposure wise. Article content Article content Where the communication broke down between Sportsnet and ATP's in-house folks remains to be seen. Article content 'Obviously what happened, we didn't want that to happen,' Hale said, according to the Canadian Press. 'We're going to have those discussions (on Sportsnet producing the full event in future years.) We've already started it. So I think there will be a better solution going forward as we move along.'