logo
White grub infestation in Dharmapuri sugarcane fields

White grub infestation in Dharmapuri sugarcane fields

DHARMAPURI: Sugarcane fields across Dharmapuri district have slowly started to turn a yellowish brown hue over the past few weeks. While one might assume this to be caused by lack of nutrients or due to arid, dry climatic conditions prevailing in Dharmapuri, but this is not the case.
The aforementioned sign is one of the symptoms of the damage done by white grubs, the larvae of scarab beetles.
Farmers have blamed the spread of the insect on the mills and the agriculture department's failure to identify the infestation, which is spread across the district.
White grubs afflict the root of sugarcane.
Speaking to TNIE, S Chinnasamy, a sugarcane farmer, said, "The two mills in the district, the Dharmapuri Cooperative Sugarmill (DCS) and the Subramaniya Siva Cooperative Sugarmill (SSCS), have affixed a total target of 12,000 acres for cane cultivation across the district. White grubs have been feeding off the roots of the sugarcane, leading to the wilting of our sugarcane. Farmers stand to lose their sugarcanes. The situation is dire, especially considering the investments we have put into the cultivation. Each farmer has invested somewhere between Rs 20,000 per acre for cultivation, and if the infestation is not curbed, we stand to face massive losses".
G Murali, a farmer from Morappur, said, "The white grub infestation should have been identified much earlier. Even the fields cultivated by the SSCS are affected. The lack of timely awareness is the cause of the infestation. While it is true that we have faced these insects in the past, most farmers are struggling to control the spread of insects. So it is only a matter of time till we lose our crops".
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Jal Jeevan Mission In Chhattisgarh In Deep Waters As Taps Run Dry
Jal Jeevan Mission In Chhattisgarh In Deep Waters As Taps Run Dry

NDTV

timean hour ago

  • NDTV

Jal Jeevan Mission In Chhattisgarh In Deep Waters As Taps Run Dry

In Ruda village of Chhattisgarh's Durg district, a towering iron structure meant to bring clean drinking water now stands rusting under the sun. Built as part of the Centre's ambitious Jal Jeevan Mission, the skeletal frame of a water tank is complete, but the tank itself is missing. There is no water, no supply, just a hollow structure and a community still walking miles for a basic necessity. "Sometimes we climb it to see pigeons," a child from the village told NDTV. Executive Engineer Utkarsh Pandey, Public Health Engineering (PHE) Durg, told NDTV that Rs 65.38 lakh had been sanctioned under the Jal Jeevan Mission for Ruda. Of that, Rs 10.98 lakh was earmarked for the zinc-aluminium alloy tank of 35,000-litre capacity, raised on a 12-meter staging. After nearly three years, the tank hasn't been installed. "No payments have been made yet. The contractor will be paid only after 100 per cent households get functional tap water," Mr Pandey clarified. Villagers tell a different story. Pipes were laid, roads were built over them, and now they may have to be dug again just to redo a system that was never operational. "It's not a construction site anymore, it's a permanent symbol of neglect," said Bhuvanesh Sahu, a resident. Another villager Aishwarya Deshmukh added, "We tell delivery people, come to the tankless structure, they always find us." Almost 200 kilometres away in Narayanpur, a tank has been completed and taps have been installed under a Rs 1.19 crore project. But for over a year, not a single drop has flowed. Women still walk kilometres daily to handpumps, while the taps serve as hitching posts for cattle. "Forget Jal Jeevan Mission, it's more like 'Tap-Cow Mission' now," said a villager. In Rajnandgaon, only 170 of 610 villages have certified household water supply. Many tank projects never started, tenders were cancelled, and the district administration is issuing warnings to non-performing contractors. Collector Dr Sarveshwar Narendra Bhure confirmed, "Non-compliant contractors are being blacklisted, and their security amounts are being forfeited." In Mahuapara village of Korea district, a tank stands unfinished inside a school compound without barricades. "Children climb it like it's a fair," says Anganwadi worker Sonavati Rajwade, fearful of a possible accident. Taps near the local MLA's house too have no water. Even as the government claims 31 lakh families now have access to water, questions were raised in the Assembly. "Your double engine government is pulling in opposite directions," said former Chief Minister Bhupesh Baghel, criticising the PHE department's pace. In response, Deputy Chief Minister Arun Sao blamed the previous Congress government "We found that 15 lakh tap connections were only 'entries', with no actual water. We are now correcting that." Jal Jeevan Mission aimed to provide tap water to 49.98 lakh families across 29,000 projects in Chhattisgarh by December 2023. As of January 2024, 15 lakh families had tap connections but no water. The deadline is now pushed to 2027. The scale of the Jal Jeevan Mission in Chhattisgarh is massive with a total sanctioned budget of Rs 26,465 crore aimed at transforming rural water supply. As of now, 4,986 contractors have been fined for irregularities ranging from delay in execution to poor-quality work. FIRs have been lodged against two contractor firms, indicating that some of these lapses were not just procedural but potentially criminal. In the administrative machinery too, only three officers have been suspended.

Can't deny rent for building taken over under DM Act, citing illegal construction: Kerala HC
Can't deny rent for building taken over under DM Act, citing illegal construction: Kerala HC

Time of India

time2 hours ago

  • Time of India

Can't deny rent for building taken over under DM Act, citing illegal construction: Kerala HC

Kochi: High court has ruled that the state govt cannot deny rent/compensation for a building taken over and used under the provisions of the Disaster Management Act, 2005, merely on the ground that the construction was unauthorised. The ruling was issued by a bench of Justice N Nagaresh while allowing a petition challenging the order of the Thiruvananthapuram district collector, who had denied rent for the takeover of a private medical college, along with all its existing human and material resources, during the Covid-19 pandemic for use as a treatment centre. The petitioners, SR Educational and Charitable Trust at Varkala in Thiruvananthapuram, stated that in March 2020, the collector had directed them to hand over the hospital buildings and facilities to the district medical officer under the Disaster Management Act. Although the hospital was later returned to the petitioners in Nov 2021, following another order of the collector, no rent or compensation was paid. The petitioners claimed Rs 46 crore as rent/compensation, but the collector rejected the claim, holding that the petitioner was not entitled to any compensation as the building constructed for the medical college was unauthorised. Aggrieved by this, the petitioners approached HC. In the interim, the rent committee fixed the rent for the portion of the building used for Covid-19 response activities at Rs 1.06 crore, based on a direction from the bench. Meanwhile, the local panchayat authorities reported that the women's hostel building of the college was constructed in violation of coastal regulation zone (CRZ) norms. Upon examining the facts, HC noted that Section 66 of the Disaster Management Act lays down the procedure for computing rent/compensation, and that rent cannot be denied solely on the ground of unauthorised construction. If there are statutory violations in the building's construction, the authorities are free to proceed in accordance with the law. However, once a building has been used by the govt, the authorities are legally bound to pay rent or compensation to the petitioner. Accordingly, HC directed the collector and district disaster management authority to take a fresh decision in the matter within three weeks.

CBSE Class 10th Compartment Result 2025: Re-evaluation And Verification Dates Announced, Details Here
CBSE Class 10th Compartment Result 2025: Re-evaluation And Verification Dates Announced, Details Here

News18

time6 hours ago

  • News18

CBSE Class 10th Compartment Result 2025: Re-evaluation And Verification Dates Announced, Details Here

Last Updated: CBSE Board Compartment Result 2025: CBSE has announced re-evaluation and verification dates for Class 10 and 12 supplementary exams. The Central Board of Secondary Education (CBSE) has announced the schedule for re-evaluation and verification of marks for students who appeared in the Class 10 and 12 supplementary examinations. While the CBSE Class 12 compartment results were declared on August 1, the Class 10 results are still awaited. Once released, students will be able to check their scores on the official websites at and using their roll number, school number, admit card ID, and security pin. Verification & Re-evaluation Schedule CBSE has detailed the timeline and fees for post-result processes. The applications must be submitted online, and the board will accept only one application per candidate at each step. No offline payments, including cash, demand drafts, or money orders, will be entertained. The processing fees are non-refundable. Who Can Apply For Verification? Only those students who apply for a photocopy of their evaluated answer book will be eligible to apply for verification of marks. After receiving the scanned copy, candidates must thoroughly check for any errors in totalling, unchecked answers, or incorrect marking. The verification result will be made available through the same online portal used for submitting the application. CBSE clarified that any change in marks, whether an increase or decrease will reflect in the final result. Even a reduction by a single mark will be updated and cannot be contested further. Re-evaluation is open only to students who have accessed the scanned copy of their answer sheet. Under this process, candidates can challenge the marks awarded to specific questions. Each challenge requires a payment of Rs 100 per question. Students are advised to consult the official marking scheme provided along with the question paper before filing their request with appropriate justification. The outcome of the re-evaluation will be final. Once declared, students will be informed via the official website and by their respective CBSE Regional Office. The Board has made it clear that no appeals will be entertained after the re-evaluation results are released. For students awaiting the CBSE Class 10 compartment results, it is advised to regularly check the official websites for updates. Stay updated with the latest education! Get real-time updates on board exam results 2025, entrance exams such as JEE Mains, Advanced, NEET, and more. Find out top schools, colleges, courses and more. Also Download the News18 App to stay updated! tags : CBSE CBSE Board view comments Location : New Delhi, India, India First Published: August 04, 2025, 17:27 IST News education-career CBSE Class 10th Compartment Result 2025: Re-evaluation And Verification Dates Announced, Details Here Disclaimer: Comments reflect users' views, not News18's. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store