logo
New home, new hope for Pitas fire victim

New home, new hope for Pitas fire victim

Borneo Post2 days ago

Afnah (second from right) receiving the keys to her new house from Harun (right), alongside the team of caring individuals.
KOTA KINABALU (June 1): The burdens of a woman who lost her husband, daughter, uncle, and home in a fire in Pitas last year were eased with the construction of a new house.
Mother of three, Afnah Tundan, 51, beamed with joy after receiving the keys to her new home from Parti Gagasan Rakyat Sabah (Gagasan Rakyat) Pitas deputy chief Datuk Harun Ismail.
The house, built next to the site of her original home, was made possible through assistance from the Sabah State Welfare Foundation (YKNS) and several compassionate individuals.
Afnah described the support as a great blessing from Allah SWT.
'I am unemployed and rely on my two working daughters to support me and my youngest child who is still in school, so I couldn't afford to build a new house,' she said.
'After the tragedy, I had to stay at a family member's house, but now Allah SWT has answered my prayers through the kindness of noble people who made this new home a reality. I'd like to thank everyone involved, especially Datuk Harun Ismail, for initiating this assistance,' she added during the handover ceremony in Kampung Taka on May 31.
Harun, who is also the chief executive officer of the Sabah Oil and Gas Development Corporation (SOGDC), said approximately RM61,000 was spent on constructing the 500-square-foot house, which began in March.
He said YKNS allocated RM30,000 for the project, with the remaining cost covered by concerned individuals as part of their corporate social responsibility (CSR) efforts.
The new home includes two bedrooms, a kitchen, a bathroom and basic amenities such as water, electricity, lighting and ceiling fans.
'Afnah's house is now fully ready for her and her children. We hope it brings a new ray of hope to their family,' Harun said.
In early August last year, a tragic fire in Kampung Taka claimed the lives of the SK Senaja headmaster, his 12-year-old daughter, and another family member, leaving Afnah without her loved ones and home.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

UPM Freshwater Lobster Project A Model For Sustainable Aquaculture
UPM Freshwater Lobster Project A Model For Sustainable Aquaculture

Barnama

time8 hours ago

  • Barnama

UPM Freshwater Lobster Project A Model For Sustainable Aquaculture

I t all started with a simple freshwater lobster farming project to allow Universiti Putra Malaysia (UPM) students to apply classroom theories in a real-world setting and expose them to entrepreneurial knowledge as well as learn the importance of sustainable aquaculture practices. The small-scale project, operated by about 20 students, kicked off last month on the grounds of the Tan Sri Aishah Ghani residential college at UPM here. It currently has six tanks, each housing 30 to 35 lobsters, both male and female. Barely a month has passed since the start of the project but it is already displaying signs of becoming an inspirational model that can open students' eyes to the importance of environmental sustainability, as well as a holistic learning platform to hone entrepreneurial skills. The idea for the project came about after a group of UPM students were sent to Kota Kinabalu, Sabah, in January to attend a three-day course on freshwater lobster farming. The freshwater aquaculture industry in Malaysia is growing rapidly with great economic potential. Muhammad Alif Haikal Mahadi, 22, a human development science student from the Faculty of Human Ecology, UPM – who was among those who attended the course – said it became the starting point for their project which is now thriving, proving that real learning begins outside the classroom. He said the broodstock (mature crustaceans used in aquaculture for breeding purposes) at their project site will start producing eggs within three to four weeks. Once the eggs hatch, it takes about three to five months for the lobsters to reach maturity and be ready for harvesting. He added it cost about RM7,000 to buy the necessary equipment such as tanks and oxygen blower, and lobster stock and other essentials to get the project going. HANDS-ON LEARNING Muhammad Alif Haikal told Bernama the insights and technical knowledge gained from the course they attended in Sabah gave him and his university mates the confidence and motivation to start their own freshwater lobster farm. 'The hands-on course provided a solid foundation in both theory and essential practical skills,' he said. 'We were given crucial exposure to managing pH and ammonia levels in the water, as well as how to care for lobsters.' Prices in end markets such as seafood restaurants can reach RM15 to RM25 for every 100 grams of cooked lobster, making it a high-value product when it reaches consumers. They were also taught how to maintain water quality and identify signs of disease in lobsters so that immediate action can be taken. In aquaculture, one of the biggest challenges is sustainable water management. 'The most difficult part is balancing water quality to ensure the prawns stay healthy and disease-free while keeping water usage to a minimum,' explained Muhammad Alif Haikal. Ammonia, which builds up from prawn or lobster waste and uneaten feed, is also a common issue. To address this, pH and ammonia test kits need to be used daily to monitor and record data, and an ammonia remover needs to be applied if necessary. He said only if there is no drop in the ammonia level will half the water in the tank concerned be replaced. This approach not only maintains lobster health but also upholds sustainability principles by reducing water wastage. Muhammad Alif Haikal said they also practice biofloc techniques to help conserve water and feed by recycling nutrients in the tank. Prawn waste is converted into microorganisms, which then serve as a natural food source, thus reducing reliance on antibiotics and chemicals. He added the Sabah course also taught them how to select quality broodstock, prepare optimal environments, manage feeding and disease prevention, and record daily data. HIGH-VALUE PRODUCT Muhammad Alif Haikal, meanwhile, admitted that their perception of aquaculture shifted entirely after attending the course and implementing their own project. 'We used to think that aquaculture was only viable on a large scale, but now we realise it can also be done on a small scale with a systematic and effective approach. 'In fact, if done properly, such projects have the potential to become knowledge transfer hubs for local communities and can even evolve into national agrotourism centres in the future,' he said. The Malaysian aquaculture industry is now increasingly dynamic with increasing domestic and export demand, especially in shrimp and freshwater fish products. He said he and his peers also see the entrepreneurial potential of their aquaculture project by turning it into a platform for knowledge sharing with the outside community. 'We can also aspire to become a freshwater lobster producer in the long term, given the wide market potential,' he added. Pointing to its current market prices, he said wholesale prices of freshwater lobster from farms range from RM60 to RM80 per kilogramme, depending on size and grade. He added that in end-user markets such as seafood restaurants, cooked freshwater lobster can fetch RM15 to RM25 per 100 grammes, making it a high-value product. Meanwhile, Deputy Vice Chancellor of Student Affairs and Alumni (HEPA), UPM, Prof Dr Arifin Abdu said the UPM freshwater lobster farming project is more than just an academic activity – it is also a strategic initiative to holistically empower students with entrepreneurial skills. He said all residential colleges and units under HEPA are encouraged to carry out at least one agricultural project to support national policies on food security and sustainable agriculture, as outlined by the Ministry of Higher Education and Ministry of Agriculture. 'Through this (freshwater lobster) project, students are directly exposed to the process of cultivating, caring for and managing lobster farming systems, which involve various technical and operational challenges,' he said. Students not only learn aquaculture techniques such as water quality management and disease prevention but are also given opportunities to design business models, manage operational costs and develop marketing strategies. 'This makes the project a comprehensive entrepreneurial education platform, where students develop leadership, teamwork and critical thinking skills, which are key elements in the real business world,' he added. CRUCIAL LEARNING PLATFORM Arifin also noted that Malaysia's freshwater aquaculture industry is growing rapidly, with significant economic potential. But despite its promising potential, the industry faces challenges such as water quality issues, disease management and sustainable use of resources. He, however, sees UPM's lobster project as a crucial learning platform to build students' capacity to tackle these challenges directly and innovatively. 'Our project is not only focused on lobster production but also opens up opportunities in shrimp seed production, alternative feeds and downstream products like frozen prawns and prawn-based ready-to-eat meals. These opportunities are highly relevant to both domestic and export markets, especially as Malaysia works to strengthen aquaculture as a major contributor to the agricultural economy,' he said. UPM Vice Chancellor Prof Dr Ahmad Farhan Ahmad Sadullah said Malaysia's aquaculture industry is becoming increasingly dynamic, with rising demand in both local and export markets, particularly for freshwater prawn and fish products. 'Projects like this not only help prepare skilled workers (for the aquaculture industry) but also support the transformation of the aquaculture sector toward smart and sustainable agriculture,' he said. Looking ahead, UPM plans to expand the aquaculture project to more residential colleges and strengthen partnerships with both local and international aquaculture industries. 'With more student and industry involvement, we hope to develop this initiative into a training hub and a model for sustainable agricultural entrepreneurial innovation. 'Our long-term plan also includes using recycled materials and cost-effective methods to encourage creativity and innovation among students,' he added.

Putra Heights fire victims seek extension of temporary aid
Putra Heights fire victims seek extension of temporary aid

New Straits Times

time19 hours ago

  • New Straits Times

Putra Heights fire victims seek extension of temporary aid

PETALING JAYA: Victims of the gas pipeline fire in Putra Heights, Subang Jaya, are hoping that temporary aid, such as rental homes, cars and motorcycles previously provided by various parties, can be extended, as some of the assistance has recently expired. Two months after the incident on April 1, some victims are now in a quandary as they are required to return the aid. Mohamad Nasir Ab Hamid, 69, a resident of Kampung Kuala Sungai Baru who was affected by the incident, said his family is currently staying in a small house near their original home with rental support for three months while waiting for their house to be repaired. "My house was deemed a total loss, with an estimated repair cost of RM150,000, but to this day, the appointed contractor has yet to begin work," he told Bernama when met in the housing estate today. Mohamad Nasir said the temporary vehicle he received after the incident was also returned last month when the loan period ended. "For daily errands, if I need a car, I use a Kancil that I've slowly repaired bit by bit. We're not looking for luxury — just a car that can serve our everyday needs," said the father of nine. Regarding the repair works on his home, Mohamad Nasir said that for now, his family is trying to carry on with life as usual and understands that it will take time, as many other homes were also destroyed in the incident. "When the contractor starts the repairs, I want to see how they will go about it and what the situation will be like, because we've yet to be informed how the process will be carried out," he said. Meanwhile, his wife, Aliyah Ismail, 55, said she was grateful for the assistance received but hoped that cash compensation would also be provided to help victims, especially those left homeless, sustain their livelihoods. Previously a catering business operator, she now sells traditional cakes and snacks, earning between RM20 and RM30 a day to help cover daily expenses, in addition to financial support from her children. Aliyah said that so far, apart from receiving vouchers for electronic goods and other aid, her family has only been informed of assistance for home repairs. "As of now, we haven't heard anything about compensation — only about home repairs. Compensation should be given. We have no money, no income. Rental is expensive. "Goods are expensive too, and to restart my catering business, I need to buy a lot of supplies and equipment because everything was destroyed in the fire," she said. The gas pipeline fire saw flames shoot more than 30 metres high, with temperatures reaching 1,000 degrees Celsius. Firemen took nearly eight hours to fully extinguish the blaze. Eighty-one homes were destroyed, suffering structural damage exceeding 40 per cent, another 81 were partially destroyed, 57 were affected but not burnt, while 218 homes were unaffected in the fire.– BERNAMA

Putra Heights fire victims seek extension of temporary aid
Putra Heights fire victims seek extension of temporary aid

The Sun

time21 hours ago

  • The Sun

Putra Heights fire victims seek extension of temporary aid

PETALING JAYA: Victims of the gas pipeline fire in Putra Heights, Subang Jaya, are hoping that temporary aid, such as rental homes, cars and motorcycles previously provided by various parties, can be extended, as some of the assistance has recently expired. Two months after the incident on April 1, some victims are now in a quandary as they are required to return the aid. Mohamad Nasir Ab Hamid, 69, a resident of Kampung Kuala Sungai Baru who was affected by the incident, said his family is currently staying in a small house near their original home with rental support for three months while waiting for their house to be repaired. 'My house was deemed a total loss, with an estimated repair cost of RM150,000, but to this day, the appointed contractor has yet to begin work,' he told Bernama when met in the housing estate today. Mohamad Nasir said the temporary vehicle he received after the incident was also returned last month when the loan period ended. 'For daily errands, if I need a car, I use a Kancil that I've slowly repaired bit by bit. We're not looking for luxury — just a car that can serve our everyday needs,' said the father of nine. Regarding the repair works on his home, Mohamad Nasir said that for now, his family is trying to carry on with life as usual and understands that it will take time, as many other homes were also destroyed in the incident. 'When the contractor starts the repairs, I want to see how they will go about it and what the situation will be like, because we've yet to be informed how the process will be carried out,' he said. Meanwhile, his wife, Aliyah Ismail, 55, said she was grateful for the assistance received but hoped that cash compensation would also be provided to help victims, especially those left homeless, sustain their livelihoods. Previously a catering business operator, she now sells traditional cakes and snacks, earning between RM20 and RM30 a day to help cover daily expenses, in addition to financial support from her children. Aliyah said that so far, apart from receiving vouchers for electronic goods and other aid, her family has only been informed of assistance for home repairs. 'As of now, we haven't heard anything about compensation — only about home repairs. Compensation should be given. We have no money, no income. Rental is expensive. 'Goods are expensive too, and to restart my catering business, I need to buy a lot of supplies and equipment because everything was destroyed in the fire,' she said. The gas pipeline fire saw flames shoot more than 30 metres high, with temperatures reaching 1,000 degrees Celsius. Firemen took nearly eight hours to fully extinguish the blaze. Eighty-one homes were destroyed, suffering structural damage exceeding 40 per cent, another 81 were partially destroyed, 57 were affected but not burnt, while 218 homes were unaffected in the fire.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store