Prime Mining Reports Q1 2025 Financial and Operating Results
VANCOUVER, British Columbia, May 12, 2025 (GLOBE NEWSWIRE) -- Prime Mining Corp. ('Prime' or the 'Company') (TSV: PRYM) (OTCQX: PRMNF) (Frankfurt: O4V3) is pleased to report its operating and financial results for the quarter ended March 31, 2025. Prime is focused on the exploration and development of its wholly owned high-grade Los Reyes Gold-Silver Project in Sinaloa State, Mexico ('Los Reyes' or the 'Project').
Prime Chief Executive Officer Scott Hicks commented, 'The Prime team continued to progress our technical understanding of the Los Reyes Project through the first quarter of 2025, in preparation for a high quality, high value Preliminary Economic Assessment. Our geologists have been re-analysing lithological data, enhancing geostatistical data from early drilling and evaluating new potential discovery areas ahead of an eventual return to the field. In reflection of the quality of the Los Reyes Project, we were very well received at the prestigious Core Shack at PDAC in March. And, in April, our local team had an equally strong reception at the leading technical mining event in Latin America: the Discoveries 2025 Mining Conference in Mazatlán. We continue with our program of fiscal prudence and closed the quarter with $18 million in cash, providing a well-funded 2025 drilling campaign, which we anticipate would be further supported by the $1.10 warrants that are coming due on June 12, 2025.'
Corporate Highlights During the Quarter (Unless otherwise stated, all amounts are presented in Canadian dollars.)
On February 19th, the Company announced its 2025 Outlook for the Los Reyes Project including a planned 40,000m drill program and drilling status update.
Exploration Highlights During the QuarterExpansion Drilling Highlights at Z-TThe Company is reporting 25 core holes at the Z-T Trend, 14 of which are from Tahonitas, located in the south-east end of the Z-T Trend, with the following highlights:
5.67 gpt AuEq (2.23 gpt Au and 266.1 gpt Ag) over 4.2 m ETW in hole 24TA-149, including:
9.49 gpt AuEq (3.94 gpt Au and 428.7 gpt Ag) over 2.1 m ETW;
1.62 gpt AuEq (1.36 gpt Au and 19.9 gpt Ag) over 15.2 m ETW in hole 24TA-144, including:
4.94 gpt AuEq (4.22 gpt Au and 55.3 gpt Ag) over 3.7 m ETW;
4.93 gpt AuEq (2.55 gpt Au and 184.0 gpt Ag) over 3.3 m ETW in hole 24TA-153, including:
14.09 gpt AuEq (7.09 gpt Au and 541.0 gpt Ag) over 1.1 m ETW;
And also, 0.92 gpt AuEq (0.72 gpt Au and 15.2 gpt Ag) over 19.2 m ETW in hole 24TA-153.Expansion Drilling Highlights in the Central Trend The Company is reporting 14 core holes at the Central Trend, 9 of which are from Noche Buena, at the southernmost part of the trend, with the following highlights:
3.48 gpt AuEq (3.12 gpt Au and 27.7 gpt Ag) over 7.6 m ETW in hole 24NB-78, including:
8.64 gpt AuEq (7.8 gpt Au and 64.8 gpt Ag) over 2.8 m ETW, including:
16.22 gpt AuEq (15.00 gpt Au and 94.0 gpt Ag) over 1.4 m ETW;
2.16 gpt AuEq (1.75 gpt Au and 31.9 gpt Ag) over 11.3 m ETW in hole 24NB-67, including:
8.65 gpt AuEq (7.42 gpt Au and 95.3 gpt Ag) over 2.3 m ETW;
1.65 gpt AuEq (1.03 gpt Au and 47.6 gpt Ag) over 11.2 m ETW in hole 24NB-77, including:
4.24 gpt AuEq (2.40 gpt Au and 142.0 gpt Ag) over 1.8 m ETW.Generative Drilling Highlights: Fresnillo – A Prime Original DiscoveryThe Company is reporting 14 core holes, two that intersected only Fresnillo structures, four that intersected both Noche Buena and Fresnillo structures, and eight that intersected Mariposa structures. Fresnillo is located between the Z-T and Central Trends with the following highlights in today's results:
1.99 g/t gold-equivalent ('AuEq') (1.82 g/t Au and 13.1 g/t Ag) over 9.6 m estimated true width ('ETW') in hole 24NB-75, including:
20.02 g/t AuEq (18.4 g/t Au and 125.0 g/t Ag) over 0.8 m ETW;
2.83 g/t AuEq (2.52 g/t Au and 23.6 g/t Ag) over 6.2 m ETW in hole 24NB-71, including:
5.99 g/t AuEq (5.38 g/t Au and 47.0 g/t Ag) over 2.8 m ETW;
1.46 g/t AuEq (1.08 g/t Au and 29.7 g/t Ag) over 9.8 m ETW in hole 24NB-69, including:
6.76 g/t AuEq (5.35 g/t Au and 109.0 g/t Ag) over 1.4 m ETW;
1.45 g/t AuEq (1.17 g/t Au and 21.6 g/t Ag) over 6.8 m ETW in hole 24FRE-29.
Maintaining Health and Safety Protocols
Prime remains engaged with local stakeholders and is proactive in monitoring employees and contractors concerning general health conditions. The Company continues to closely adhere to the directives of all levels of government and relevant health authorities in Mexico and Canada.
Community Engagement and Environmental Stewardship Strategy
We continued to gather environmental and community data in the quarter in support of our ESG programs, including completion of a materiality assessment, strategic plan, and disclosure matrix. We strive to minimize the environmental footprint of our activities and ensure that Los Reyes has a positive impact on our host communities.
The Company released its initial sustainability report during April 2023 which establishes a baseline and a new yardstick to measure our progress in meeting our commitments regarding sustainability and stewardship of the environment, relevant social issues, and corporate governance. The Company expects to release its 2025 Sustainability Report in the coming weeks.
Selected Financial Data
The following selected financial data is summarized from the Company's consolidated financial statements and related notes thereto (the 'Financial Statements') for the three months ended March 31, 2025 and 2024. A copy of the Financial Statements and MD&A is available at www.primeminingcorp.ca or on SEDAR at www.sedar.com.
Three Months ended March 31, 2025
Three Months ended March 31, 2024
Loss and comprehensive loss
$(3,615,113)
$(6,450,142)
Loss per share – basic and diluted
$(0.02)
$(0.04)
March 31, 2025
December 31, 2024
Cash
$18,199,852
$19,056,585
Total assets
$33,054,051
$33,177,148
Total current liabilities
$561,298
$2,203,583
Total liabilities
$1,393,967
$3,049,145
Total shareholders' equity
$31,660,084
$30,128,003
2025 Outlook
The Company plans to continue its success-based approach to drilling to further identify new prospective targets, expand the existing resource, and infill drilling. Additional work will include geological mapping and geochemical sampling to identify further discovery areas.
Six drill rigs remain on site at Los Reyes, with planned fiscal 2025 exploration focused on:
Extending the high-grade Z-T Area shoots that remain open at depth, as well as along strike, both north and south.
Expanding the known high-grade mineralization at Guadalupe East.
Increasing the Central Area resource through additions southeast at Noche Buena and its connection to San Miguel East.
Generative target drilling of high-grade intercepts at Las Primas, Fresnillo and Mariposa to further grow these emerging resources, as well as other target discovery areas to demonstrate the significant resource expansion potential at Los Reyes.
Project activities are also planned to include:
Technical: Further refine metallurgical, geotechnical, mine planning and development parameters for project development, including process and underground mining optimization, infrastructure assessment and permitting requirements. We continue to sponsor and benefit from a strong geologist intern program, supporting geology students from local colleges and universities.
Community Engagement: Continue to engage with and support local ejidos (communities) through educational, community and environmental programming, access (road) improvements and infrastructure development.
On January 28, 2025, drilling was paused in response to a deterioration in the security situation in parts of Sinaloa, including the Los Reyes area. This pause is not currently expected to impact the Company's ability to drill a minimum 40,000m program over 12-months from the recommencement of drilling. Drill rigs remain on site and drill contractors are on standby to resume drilling as soon as security improves. The Company will continue to work with local authorities to monitor the current situation.
The Company continues to engage with several engineering firms to advance its understanding of the Los Reyes Project. Activities will continue to include review of metallurgical and geotechnical information, and engineering work contributing towards a Preliminary Economic Assessment as announced on February 19, 2025.
About the Los Reyes Gold and Silver Project
Los Reyes is a high-grade, low-sulphidation epithermal gold-silver project located in Sinaloa State, Mexico. On October 15, 2024, Prime announced an updated multi-million-ounce high-grade open pit and underground resource based on exploration drilling up to July 17, 2024. Since acquiring Los Reyes in 2019, Prime has spent more than $64 million on direct exploration activities and has completed over 221,000 metres of drilling.
October 15, 2024 Resource Statement1(based on a $1950/oz gold price, $25.24/oz silver price, economic-constrained estimate)
Mining Methodand Process
Class
Tonnage(kt)
Gold Grade (g/t)
Gold Contained(koz)
Silver Grade(g/t)
Silver Contained(koz)
Gold Equiv.(g/t)
Gold Equiv.(koz)
Silver Equiv.(g/t)
Silver Equiv.(koz)
Open Pit - Mill
Indicated
24,657
1.13
899
35.7
28,261
1.60
1,265
123.3
97,723
Inferred
7,211
0.89
207
42.8
9,916
1.45
335
111.8
25,911
Underground
Indicated
4,132
3.02
402
152.4
20,243
5.00
664
386.1
51,290
Inferred
4,055
2.10
273
78.6
10,247
3.12
406
240.7
31,380
Total Mill
Indicated
28,789
1.41
1,301
52.4
48,504
2.08
1,928
161.0
149,012
Inferred
11,266
1.33
480
55.7
20,163
2.05
741
158.2
57,291
Open Pit - Heap Leach
Indicated
20,254
0.29
190
8.4
5,492
0.40
261
31.0
20,201
Inferred
5,944
0.30
58
7.3
1,398
0.40
76
30.6
5,856
Total
Indicated
49,042
0.95
1,491
34.2
53,995
1.39
2,190
107.3
169,213
Inferred
17,210
0.97
538
39.0
21,561
1.48
817
114.1
63,147
1. Refer to the Additional Notes section for the gold equivalent grade ('AuEq') calculation method and further information.
Drilling is ongoing and suggests that the three known main deposit areas (Guadalupe, Central and Z-T) are larger than previously reported. Potential also exists for new discoveries where mineralized trends have been identified outside of the currently defined resource areas. Historic operating results indicate that an estimated 1 million ounces of gold and 60 million ounces of silver were recovered from five separate operations at Los Reyes between 1770 and 1990. Prior to Prime's acquisition, recent operators of Los Reyes had spent approximately US$20 million on exploration, engineering, and prefeasibility studies.
QA/QC Protocols and Sampling Procedures
Drill core at the Los Reyes project is drilled in predominately HQ size (63.5 millimetres 'mm'), reducing to NQ (47.6 mm) when required. Drill core samples are generally 1.50 m long along the core axis with allowance for shorter or longer intervals if required to suit geological constraints. After logging intervals are identified to be sampled, the core is cut and one half is submitted for assay. RC drilling returns rock chips and fines from a 133.35 mm diameter tricone bit. The returns are homogenized and split into 2 halves, with one half submitted for analysis and the other half stored.
Sample QA/QC measures include unmarked certified reference materials, blanks, and field duplicates as well as preparation duplicates are inserted into the sample sequence and make up approximately 8% of the samples submitted to the laboratory for each drill hole.
Samples are picked up from the Project by the laboratory personnel and transported to their facilities in Durango or Hermosillo Mexico, for sample preparation. Sample analysis is carried out by Bureau Veritas and ALS Labs, with fire assay, including over limits fire assay re-analysis, completed at their respective Hermosillo, Mexico laboratories and multi-element analysis completed in North Vancouver, Canada. Drill core sample preparation includes fine crushing of the sample to at least 70% passing less than 2 mm, sample splitting using a riffle splitter, and pulverizing a 250-gram split to at least 85% passing 75 microns.
Gold in diamond drill core is analyzed by fire assay and atomic absorption spectroscopy of a 30 g sample (code FA430 or Au-AA23). Multi-element chemistry is analyzed by 4-Acid digestion of a 0.25-gram sample split (code MA300 or ME-ICP61) with detection by inductively coupled plasma emission spectrometer for a full suite of elements.
Gold assay techniques FA430 and Au-AA23 have an upper detection limit of 10 ppm. Any sample that produces an over-limit gold value via the initial assay technique is sent for gravimetric finish via method FA-530 or Au-GRA21. Silver analyses by MA300 and ME-ICP61 have an upper limit of 200 ppm and 100 ppm, respectively. Samples with over-limit silver values are re-analyzed by fire assay with gravimetric finish FA530 or Au-GRA21.
Both Bureau Veritas and ALS Labs are ISO/IEC accredited assay laboratories.
Additional Notes
Prime's MRE as of October 15, 2024 is classified in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum ('CIM') 'CIM Definition Standards - For Mineral Resources and Mineral Reserves' adopted by the CIM Council (as amended, the 'CIM Definition Standards') and in accordance with the requirements of NI 43-101. Mineral resources are not mineral reserves and do not have demonstrated economic viability.
Metres is represented by 'm'; 'etw' is Estimated True Width and is based on drill hole geometry or comparisons with other on-section drill holes; 'Au' refers to gold, and 'Ag' refers to silver; 'g/t' is grams per metric tonne; some figures may not sum due to rounding; Composite assay grades presented in summary tables are calculated using a Au grade minimum average of 0.20 g/t or 1.0 g/t as indicated in 'Au Cut-off' column of Summary Tables. Maximum internal waste included in any reported composite interval is 3.00 m. The 1.00 g/t Au cut-off is used to define higher-grade 'cores' within the lower-grade halo.
Gold equivalent grades are calculated based on an assumed gold price of US$1,950 per ounce and silver price of $25.24 per ounce, based on the formula AuEq grade (g/t) = Au grade + (Ag grade x $25.24 / $1,950). Metallurgical recoveries are not considered in the in-situ grade estimate but are estimated to be 95.6% and 81% for gold and silver, respectively, when processed in a mill, and 73% and 25% respectively when heap-leached. Additional details are available in the associated Technical Report, filed on November 27, 2024.
Qualified Person
Scott Smith, P.Geo., Executive Vice President of Exploration, is a Qualified Person for the purposes of NI 43-101 and has reviewed and approved the technical content in this news release.
About Prime Mining
Prime is managed by an ideal mix of successful mining executives, strong capital markets personnel and experienced local operators all focused on unlocking the full potential of the Project. The Company has a well-planned capital structure with a strong management team and insider ownership. Prime is targeting a material resource expansion at Los Reyes through a combination of new generative area discoveries and growth, while also building on technical de-risking activities to support eventual project development.
For further information, please visit https://www.primeminingcorp.ca/ or direct enquiries to:
Scott HicksCEO & Director
Indi GopinathanVP Capital Markets & Business Development
Prime Mining Corp.710 – 1030 West Georgia St.Vancouver, BC V6E 2Y3 Canada+1(604) 238-1659info@primeminingcorp.ca
Cautionary Notes to U.S. Investors Concerning Resource EstimatesThis news release has been prepared in accordance with the requirements of the securities laws in effect in Canada, which differ from the requirements of the U.S. securities laws. In particular, and without limiting the generality of the foregoing, the terms 'mineral reserve', 'proven mineral reserve', 'probable mineral reserve', 'inferred mineral resources,' 'indicated mineral resources,' 'measured mineral resources' and 'mineral resources' used or referenced in this presentation are Canadian mineral disclosure terms as defined in accordance with NI 43-101 under the guidelines set out in the CIM Standards. The CIM Standards differ from the mineral property disclosure requirements of the U.S. Securities and Exchange Commission (the 'SEC') in Regulation S-K Subpart 1300 (the 'SEC Modernization Rules') under the U.S. Securities Act of 1933, as amended (the 'Securities Act'). As a foreign private issuer that is eligible to file reports with the SEC pursuant to the multijurisdictional disclosure system, the Company is not required to provide disclosure on its mineral properties under the SEC Modernization Rules and will continue to provide disclosure under NI 43-101 and the CIM Standards. Accordingly, the Company's disclosure of mineralization and other technical information may differ significantly from the information that would be disclosed had the Company prepared the information under the standards adopted under the SEC Modernization Rules.
Forward Looking Information
This news release contains certain 'forward-looking information' and 'forward-looking statements' within the meaning of Canadian securities legislation as may be amended from time to time, including, without limitation, statements regarding the perceived merit of the Company's properties, including additional exploration potential of Los Reyes, potential quantity and/or grade of minerals, the potential size of the mineralized zone, metallurgical recoveries, and the Company's exploration and development plans in Mexico. Forward-looking statements are statements that are not historical facts which address events, results, outcomes, or developments that the Company expects to occur. Forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made, and they involve several risks and uncertainties. Certain material assumptions regarding such forward-looking statements were made, including without limitation, assumptions regarding the price of gold, silver and copper; the accuracy of mineral resource estimations; that there will be no material adverse change affecting the Company or its properties; that all required approvals will be obtained, including concession renewals and permitting; that political and legal developments will be consistent with current expectations; that currency and exchange rates will be consistent with current levels; and that there will be no significant disruptions affecting the Company or its properties. Consequently, there can be no assurances that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements involve significant known and unknown risks and uncertainties, which could cause actual results to differ materially from those anticipated. These risks include, but are not limited to: risks related to uncertainties inherent in the preparation of mineral resource estimates, including but not limited to changes to the cost assumptions, variations in quantity of mineralized material, grade or recovery rates, changes to geotechnical or hydrogeological considerations, failure of plant, equipment or processes, changes to availability of power or the power rates, ability to maintain social license, changes to interest or tax rates, changes in project parameters, delays and costs inherent to consulting and accommodating rights of local communities, environmental risks, title risks, including concession renewal, commodity price and exchange rate fluctuations, risks relating to COVID-19 and other future pandemics, delays in or failure to receive access agreements, on-going receipt of amended and/or operating permits, risks inherent in the estimation of mineral resources; and risks associated with executing the Company's objectives and strategies, including costs and expenses, physical access to the property, security risks, availability of contractors and skilled labour, as well as those risk factors discussed in the Company's most recently filed management's discussion and analysis, as well as its annual information form dated March 25, 2024, available on www.sedarplus.ca. Except as required by the securities disclosure laws and regulations applicable to the Company, the Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


New York Post
an hour ago
- New York Post
Amazon Prime! Jeff Bezos shuts down NYC street to get furniture delivered to penthouse via crane: video
Must be a perk of Prime. A stretch of Fifth Avenue was closed for a massive delivery to Jeff Bezos' sprawling NoMad penthouse, according to a mind-blowing video shared on TikTok. A huge piece of wrapped furniture dangled from a rope as a crane last week slowly hoisted it above the intersection of Fifth Avenue and 26th Street, which was lined with caution tape, barricades, machinery and moving company trucks. 4 Jeff Bezos shut down part of 5th Avenue so a crane could deliver furniture to his NYC penthouse. William C Lopez/New York Post Dozens of workers milled about, directing traffic and joining passersby in watching as the item neared the top of 24-story 212 Fifth Ave., where Bezos reportedly owns five apartments spanning the top four floors worth $119 million. Raffi Arslanian, the owner of luxury candle company Thompson Ferrier, caught the commotion on camera Saturday. 'You want to see how Jeff Bezos delivers his furniture? Let me show you,' said Arslanian, whose office is a block away. 4 Bezos owns five apartments in a NoMad building that overlooks Madison Square Park. Dave Benett/amfAR/Getty Images for amfAR 'I think we all can relate to this,' he joked. 'Now back to reality, where, when we move, we get a U-Haul and we do it ourselves, or at best, we get a company to do it — but we don't close the street,' Arslanian quipped. 4 Bezos owns the top four floors of the building. William C Lopez/New York Post His video has garnered more than 970,000 views and thousands of comments, some speculating about what giant object the crane was transporting. 'It's a hot tub,' said one commenter. A grand piano, suggested another. 4 A TikTok video of the scene went viral. thompsonferrier_nyc/ TikTok Others were more interested in how much the operation cost. Large-scale moves using cranes can cost upwards of $20,000 a day, according to reports, and require permits to shut down the streets. 'Amazon prime delivery, billionaire subscription,' one TikToker joked. 'We would all do the same if we had 100 billion dollars,' another remarked. Bezos, worth an estimated $223 billion, according to Forbes, between 2019 and 2021 plucked up one unit after another in the former office tower overlooking Madison Square Park.


Business Upturn
5 hours ago
- Business Upturn
ProZenith Launches Natural Supplement Formulated for Weight Management Support
By GlobeNewswire Published on June 7, 2025, 06:50 IST Aurora, June 06, 2025 (GLOBE NEWSWIRE) — ProZenith recently announced the launch of its new wellness supplement developed to assist individuals in maintaining energy, focus, and mindful appetite awareness as part of a balanced and active lifestyle. Manufactured in the United States in a facility that is FDA-registered and GMP-certified, the product is now available through official online channels. ProZenith is intended for individuals pursuing support for general weight management and overall well-being. Its formulation includes select ingredients chosen to align with healthy routines and support individuals seeking help managing non-hunger-related snacking behaviors. Each purchase of ProZenith is covered by a 60-day refund policy, reflecting the company's customer-first return assurance framework. All ProZenith supplements are manufactured without genetically modified ingredients and adhere to U.S. quality standards. Production takes place in an FDA-registered facility that complies with current Good Manufacturing Practices (cGMP). ProZenith is currently available through the company's official online platform at with multiple purchase options provided for convenience. About ProZenith ProZenith develops nutritional supplements designed to support individuals on their wellness journeys. The company emphasizes high-quality manufacturing, transparency, and customer satisfaction as it continues to expand its product offerings for health-conscious consumers. For customer support inquiries, contact: [email protected] Disclaimer: This product has not been evaluated by the Food and Drug Administration. This product is not intended to diagnose, treat, cure, or prevent any disease. Media Contact: Company: ProZenith ProZenith Address: 19655 E 35th Dr #100, Aurora, CO 80011 19655 E 35th Dr #100, Aurora, CO 80011 Email: [email protected] [email protected] Order Phone Support: (925) 217-7353 Disclaimer: The above press release comes to you under an arrangement with GlobeNewswire. Business Upturn takes no editorial responsibility for the same. GlobeNewswire provides press release distribution services globally, with substantial operations in North America and Europe.


Business Upturn
5 hours ago
- Business Upturn
Grupo Aeroportuario Del Pacifico Announces Approval Of Maximum Tariffs And Capital Development Program For 2026-2030 For Montego Bay Airport In Jamaica
By GlobeNewswire Published on June 7, 2025, 08:25 IST GUADALAJARA, Mexico, June 06, 2025 (GLOBE NEWSWIRE) — Grupo Aeroportuario del Pacífico, S.A.B. de C.V. (NYSE: PAC; BMV: GAP) ('the Company' or 'GAP') announces the conclusion of the ordinary review process for the maximum tariffs per passenger and committed investments included in the Capital Development Program of Montego Bay for the 2026–2030 period. The maximum passenger charges are expressed in U.S. dollars and will apply to each year as specified in the following table: Airport 2026 2027 2028 2029 2030 Montego Bay 17.38 17.79 18.22 18.65 19.07 The investments approved by the Authority and committed under the Capital Development Program are expressed in millions of U.S. dollars and must be deployed according to the following schedule: Airport 2026 2027 2028 2029 2030 Total Montego Bay 38.4 39.4 18.4 11.6 10.3 118.1 Company Description Grupo Aeroportuario del Pacífico, S.A.B. de C.V. (GAP) operates 12 airports throughout Mexico's Pacific region, including the major cities of Guadalajara and Tijuana, the four tourist destinations of Puerto Vallarta, Los Cabos, La Paz and Manzanillo, and six other mid-sized cities: Hermosillo, Guanajuato, Morelia, Aguascalientes, Mexicali, and Los Mochis. In February 2006, GAP's shares were listed on the New York Stock Exchange under the ticker symbol 'PAC' and on the Mexican Stock Exchange under the ticker symbol 'GAP'. In April 2015, GAP acquired 100% of Desarrollo de Concessioner Aeroportuarias, S.L., which owns a majority stake in MBJ Airports Limited, a company operating Sangster International Airport in Montego Bay, Jamaica. In October 2018, GAP entered into a concession agreement for the Norman Manley International Airport operation in Kingston, Jamaica, and took control of the operation in October 2019. This press release may contain forward-looking statements. These statements are statements that are not historical facts and are based on management's current view and estimates of future economic circumstances, industry conditions, company performance, and financial results. The words 'anticipates', 'believes', 'estimates', 'expects', 'plans' and similar expressions, as they relate to the company, are intended to identify forward-looking statements. Statements regarding the declaration or payment of dividends, the implementation of principal operating and financing strategies and capital expenditure plans, the direction of future operations, and the factors or trends affecting financial condition, liquidity, or results of operations are examples of forward-looking statements. Such statements reflect the current views of management and are subject to a number of risks and uncertainties. There is no guarantee that the expected events, trends, or results will occur. The statements are based on many assumptions and factors, including general economic and market conditions, industry conditions, and operating factors. Any changes in such assumptions or factors could cause actual results to differ materially from current expectations. In accordance with Section 806 of the Sarbanes-Oxley Act of 2002 and Article 42 of the 'Ley del Mercado de Valores', GAP has implemented a 'whistleblower' program, which allows complainants to anonymously and confidentially report suspected activities that involve criminal conduct or violations. The telephone number in Mexico, facilitated by a third party responsible for collecting these complaints, is 800 04 ETICA (38422) or WhatsApp +52 55 6538 5504. The website is or by email at [email protected]. GAP's Audit Committee will be notified of all complaints for immediate investigation. Disclaimer: The above press release comes to you under an arrangement with GlobeNewswire. Business Upturn takes no editorial responsibility for the same. GlobeNewswire provides press release distribution services globally, with substantial operations in North America and Europe.