logo
Filed wrong ITR form? Consequences & how to fix it

Filed wrong ITR form? Consequences & how to fix it

With the ITR filing season in full swing, one mistake that many taxpayers make is selecting a wrong Income Tax Return (ITR) form. Experts warn this error can lead to delays, notices from the tax department, and even penalties in some cases. But there are remedies available, if you act in time.
Why the right ITR form matters
'Filing an incorrect ITR form can render the return defective under Section 139(9) of the Income Tax Act,' says Sandeep Bhalla, partner at Dhruva Advisors.
For example, using ITR-2 instead of ITR-3 for business income could result in income remaining unreported, triggering underreporting penalties. In some cases, the return may simply be treated as invalid unless corrected within the timeline.
The Centralised Processing Centre (CPC) flags such returns and issues a notice.
'The taxpayer then gets 15 days to file a corrected return. Failing to do so means the original return is treated as not filed at all,' warns Vivek Jalan, partner at Tax Connect Advisory Services LLP.
Financial and legal risks
The fallout of filing the wrong form isn't limited to administrative inconvenience.
'It can delay refunds, disallow deductions like 80C or HRA, and even attract late filing fees of up to Rs 5,000,' explains Shefali Mundra, chartered accountant and tax expert at ClearTax.
If the error leads to underreporting income, penalties under Section 270A may apply 50 per cent of underreported income or 200 per cent in cases of misreporting.
'Incorrect reporting also increases the chances of scrutiny, especially if details don't match AIS, TIS, or Form 26AS,' adds Niyati Shah, chartered accountant, Vertical Head – Personal Tax at 1 Finance.
How to fix it?
Taxpayers can file a revised return under Section 139(5) by December 31 of the relevant assessment year, as long as the original return was filed on time. 'If this window has lapsed, the Updated Return (ITR-U) under Section 139(8A) allows corrections within 48 months,' Bhalla points out.
Tips to avoid mistakes
Experts recommend understanding income sources thoroughly before selecting a form.
'A common mistake is assuming ITR-1 applies to all salaried individuals, even those with multiple properties or capital gains,' warns Shah. Taxpayers should verify pre-filled data and use tools that recommend the correct form or consult professionals when in doubt.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Bengaluru Metro's Yellow Line to be inaugurated today: Check route, fare, timings
Bengaluru Metro's Yellow Line to be inaugurated today: Check route, fare, timings

Hindustan Times

time20 minutes ago

  • Hindustan Times

Bengaluru Metro's Yellow Line to be inaugurated today: Check route, fare, timings

Prime Minister Narendra Modi will inaugurate the Yellow line of the Bengaluru Metro Phase-2 project from RV Road in South Bengaluru to Bommasandra in the east on Sunday. Currently, the Bengaluru metro is operated and maintained by Bangalore Metro Rail Corporation Limited (BMRCL).(PTI) The phase-2 project has a route length of over 19 km with 16 stations and took around ₹7,160 crore to build. Along with this, he will also lay the foundation stone for the Bangalore Metro Phase-3 project. As per a statement from the PM's office, PM Modi will also flag off three Vande Bharat Express trains at KSR Railway Station in Bengaluru at around 11 am. Services and fare Services on this line will begin from Monday, with the first three trains to be driverless, operating at an interval of every 25 minutes, Mint reported. However, the frequency is likely to improve. The trains will run daily from 5:00 am to 11:00 pm, serving thousands of commuters during that time. As per the report, the fare prices will be in line with usual Bengaluru Metro pricing, ranging from ₹10 to ₹90 for a one-way ticket. Currently, the Bengaluru metro is operated and maintained by Bangalore Metro Rail Corporation Limited (BMRCL), a joint venture of the Government of India and the Government of Karnataka. Also read: Traffic curbs announced ahead of PM Modi's visit to Bengaluru for Namma Metro Yellow Line launch: Report The yellow line will improve metro connectivity in Bengaluru with an increase to over 96 km, serving a large population in the region. It will also help in easing the traffic congestion on key corridors, including Hosur Road, Silk Board Junction, and Electronics City Junction. Key metro stations RV Road (Interchange) Jayadeva (Interchange) Central Silk Board (Interchange) Electronics City Infosys Foundation Huskuru Road Delta Electronics Bommasandra Also read: PM Modi in Bengaluru tomorrow: Full agenda unveiled, traffic restrictions announced PM Modi will travel by helicopter and road to the KSR Bengaluru railway station, where he will flag off the Vande Bharat Express train. Following this, he will then travel by road to the RV Road (Ragigudda) metro station on the Yellow Line. Between 11:45 am to 12:50 pm, he will be flagging off the Yellow Line and take a metro ride to the Electronic City station, several reports said.

PM Modi To Launch Bengaluru Metro's Yellow Line, New Vande Bharat Express Today
PM Modi To Launch Bengaluru Metro's Yellow Line, New Vande Bharat Express Today

NDTV

timean hour ago

  • NDTV

PM Modi To Launch Bengaluru Metro's Yellow Line, New Vande Bharat Express Today

Bengaluru: Prime Minister Narendra Modi will inaugurate the much-awaited Yellow Line of Bangalore Metro and the Vande Bharat Express train between Bengaluru and Belagavi here on Sunday. He will also lay the foundation stone for the Bangalore Metro Phase-3 project. As per the itinerary shared by the Chief Minister's Office, PM Modi will participate in three events during his nearly four-hour visit to the city. PM Modi will be landing at the HAL Airport here at 10.30 am. He will then travel by helicopter and road to the KSR Bengaluru (city) railway station, where he will flag off Vande Bharat Express train between KSR Bengaluru-Belagavi. He will also virtually flag off two more Vande Bharat Express trains between Amritsar-Sri Mata Vaishno Devi Katri, and Ajni (Nagpur)-Pune. PM Modi will then travel by road to the RV Road (Ragigudda) metro station on the Yellow Line. Between 11:45 am to 12:50 pm he will be flagging off Yellow Line (reach 5) and take a metro ride to the Electronic City station. From there, PM Modi will travel to the International Institute of Information Technology (IIIT) Bengaluru, where he will be laying the foundation stone for Bangalore metro phase-3 and officially inaugurating the yellow line from RV Road (Ragigudda) to Bommasandra station, and address the gathering. He will then travel by helicopter to the HAL Airport and fly back to Delhi at 2.45 pm. According to PM Modi's office, the yellow line metro from RV Road (Ragigudda) to Bommasandra of Bangalore Metro Phase-2 project, having a route length of over 19 km and 16 stations, is worth around Rs 7,160 crore. With the opening of this yellow line, the operational metro network in Bengaluru will increase to over 96 km, serving a large population in the region. As per officials, the yellow line is expected to ease traffic congestion in several heavily congested corridors like Hosur Road, Silk Board Junction, and Electronics City Junction. The Metro Phase 3, also known as the Orange Line, for which PM Modi will be laying the foundation, will be built at an estimated cost of Rs 15,611 crore. The total route length of the project will be more than 44 km with 31 elevated stations. This infrastructure project will address the growing transportation needs of the city, catering to residential, industrial, commercial, and educational areas. Phase 3 will have two corridors or lines: JP Nagar 4th Phase to Kempapura (32.15 km) and Hosahalli to Kadabagere (12.5 km).

PM Modi to launch yellow line metro, Vande Bharat Express in Bengaluru
PM Modi to launch yellow line metro, Vande Bharat Express in Bengaluru

Time of India

time3 hours ago

  • Time of India

PM Modi to launch yellow line metro, Vande Bharat Express in Bengaluru

Narendra Modi will inaugurate Bangalore Metro's Yellow Line and the Bengaluru-Belagavi Vande Bharat Express. He will also lay the foundation for Bangalore Metro Phase-3. The Yellow Line spans over 19 km with 16 stations. Metro Phase 3, also known as the Orange Line, will cover over 44 km with 31 stations. Tired of too many ads? Remove Ads Tired of too many ads? Remove Ads Prime Minister Narendra Modi will inaugurate the much-awaited Yellow Line of Bangalore Metro and the Vande Bharat Express train between Bengaluru and Belagavi here on will also lay the foundation stone for the Bangalore Metro Phase-3 project. As per the itinerary shared by the Chief Minister's Office, Modi will participate in three events during his nearly four-hour visit to the will be landing at the HAL Airport here at 10.30 am. He will then travel by helicopter and road to the KSR Bengaluru (city) railway station, where he will flag off Vande Bharat Express train between KSR will also virtually flag off two more Vande Bharat Express trains between Amritsar-Sri Mata Vaishno Devi Katri, and Ajni (Nagpur)- will then travel by road to the RV Road (Ragigudda) metro station on the Yellow Line. Between 11:45 am to 12:50 pm he will be flagging off Yellow Line (reach 5) and take a metro ride to the Electronic City there, Modi will travel to the International Institute of Information Technology (IIIT) Bengaluru, where he will be laying the foundation stone for Bangalore metro phase-3 and officially inaugurating the yellow line from RV Road (Ragigudda) to Bommasandra station, and address the will then travel by helicopter to the HAL Airport and fly back to Delhi at 2.45 to PM's office, the yellow line metro from RV Road (Ragigudda) to Bommasandra of Bangalore Metro Phase-2 project, having a route length of over 19 km and 16 stations, is worth around Rs 7,160 the opening of this yellow line, the operational metro network in Bengaluru will increase to over 96 km, serving a large population in the per officials, the yellow line is expected to ease traffic congestion in several heavily congested corridors like Hosur Road, Silk Board Junction, and Electronics City Metro Phase 3, also known as the Orange Line, for which the PM will be laying the foundation, will be built at an estimated cost of Rs 15,611 total route length of the project will be more than 44 km with 31 elevated stations. This infrastructure project will address the growing transportation needs of the city, catering to residential, industrial, commercial, and educational 3 will have two corridors or lines: JP Nagar 4th Phase to Kempapura (32.15 km) and Hosahalli to Kadabagere (12.5 km).

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store