
Regulator OK's liquefied natural gas exports through Hudson Bay, pending future compliance
Canada's energy regulator has granted a company trying to develop a second port on Hudson Bay in northern Manitoba the authorization to export liquefied natural gas through subarctic waters, provided it complies with energy regulations.
In an order published May 29, the Canada Energy Regulator authorized NeeStaNan to export LNG until June 2027, allowing the company to embark on a feasibility study for an all-season port near the mouth of the Nelson River.
Originally based in Calgary, where it was directed by former oilpatch entrepreneur Robyn Lore, NeeStaNan now states it is a majority-owned subsidiary of Fox Lake Cree Nation, which is located along the Nelson River east of Gillam, Man. The company now has a Winnipeg address.
In a news release issued on July 2, NeeStaNan and Fox Lake Cree Nation announced they are studying the feasibility of building "a large, multi-functional port with year-round operations," with the capacity and infrastructure to handle ores, potash, grains, liquefied natural gas, liquefied petroleum gas and hydrogen.
The proposed port would be served by a new 150-kilometre rail spur line from Gillam to Hudson Bay, NeeStaNan said in its press release, describing the proposed tidewater port as a "new Port Nelson."
Port Nelson, a ghost town located along the north side of the Nelson River, was the original intended terminus for the Hudson Bay Railway.
From 1912 to 1918, the federal government attempted to build a deepwater port along the Nelson but abandoned the megaproject because of wartime labour shortages, the extreme climate on the coast of Hudson Bay and heavy silting along the fast-flowing river.
The Hudson Bay railway was completed a decade later to Churchill, several hundred kilometres to the northwest.
NeeStaNan has spent the past two years studying a revival of Nelson River-area port.
Proponents such as Churchill ecotourism operator Wally Daudrich have argued the Port of Churchill is too small to serve a large volume of container ships, while Manitoba Premier Wab Kinew has said Churchill cannot be expanded without impacting ecotourism operations, including beluga whale watching and polar bear viewing.
'Trying to do our homework' on port proposal: Kinew
NeeStaNan said in its press release that in addition to exploring the construction of a rail line, it is also looking at a pipeline to a future Port Nelson.
Environmental groups and some First Nations advocates have expressed concerns Hudson Bay is too ecologically sensitive to handle fossil fuel shipments, given the remote location of the bay, the length of time it would take to deploy cleanup crews, and the absence of knowledge about the impacts of oil or gas spills in this ecosystem.
Kinew, who has expressed support for the idea of a second port on Hudson Bay, suggested it is premature to conclude the NeeStaNan proposal will translate into the construction of an actual port, which would require billions in spending.
"We're trying to do our homework and background work behind the scenes, make sure folks are comfortable with the direction forward, and then we'll move ahead with that," the premier told reporters Thursday at the Manitoba Legislative Building.
"We haven't actually done an announcement of this thing yet," Kinew said.
"We're doing the legwork to try and get ready and make sure that the partners that we need to have onside have their concerns around ownership and decision-making and the environmental aspects all looked after.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


CBC
an hour ago
- CBC
Developer and housing researcher debate foreign investment in B.C. real estate
Retired UBC geographer David Ley is one of the 27 signatories of a letter sent to the prime minister taking a stance against foreign investment in housing in B.C. On the other hand, Cressey Development Group is a signatory of an open letter asking for restrictions on foreign investment to be lifted. Ley and Cressey's executive vice-president Hani Lammam join us on On The Coast to debate which approach is better.


Globe and Mail
3 hours ago
- Globe and Mail
DMG Blockchain Solutions Announces Preliminary July Operational Results, Treasury Update, Launch of Blockseer Explorer
VANCOUVER, British Columbia, Aug. 06, 2025 (GLOBE NEWSWIRE) -- DMG Blockchain Solutions Inc. (TSX-V: DMGI) (OTCQB: DMGGF) (FRANKFURT: 6AX) ("DMG" or the "Company"), a vertically integrated blockchain and data center technology company, today announces its preliminary operational results for July 2025: During July 2025, DMG's realized hashrate was 1.65 EH/s, up 6% from the 1.56 EH/s reported in June, as the Company was able to make fully operational its hydro infrastructure with 0.4 EH/s hashrate, achieved in the latter part of July. As a result of diligent efforts by its mining staff, the Company was able to overcome the infrastructure contamination issues caused by manufacturer quality control issues. DMG is now observing intraday hashrate fluctuations of less than 1% in its hydro mining segment, even during the warmest part of the summer. The hydro miners are designed to maintain hashrate under higher ambient temperatures, albeit at reduced efficiency, and are performing as expected. Notably, the initial failure rate of the hydro miners has been significantly lower than that of previous generations of air-cooled equipment. The Company has scheduled substation maintenance in August, which is expected to result in three days of downtime, with the possibility of partial shutdowns around that period. DMG does not currently utilize backup power generation for its Bitcoin mining operations, except for its server room. DMG's bitcoin balance was 307 BTC at the end of July. The Company sold bitcoin during the month to fund operating expenses and further reduce its loan balance with Sygnum Bank, in line with prior guidance. Digital Asset Treasury Update As of the date of this press release, DMG has paid down more than half of its Sygnum Bank loan balance, which was $20.0 million as of its most recently reported financial quarter ending March 31, 2025. In the near-term, DMG anticipates it will increase its bitcoin balance and limit further reductions in its debt. As a bitcoin miner, DMG's cash cost of energy to make bitcoin is well below the market price, which makes its cost of growing its bitcoin balance attractive. The Company continues to explore the development of a broader digital asset portfolio. DMG Launches Blockseer Explorer DMG announces it has relaunched Blockseer Explorer, which is part of DMG Blockchain's digital asset software suite and is a product tailored to a specific and underserved segment of the market: Bitcoin-native operators such as miners and self-custody treasuries. Explorer helps users track wallet activity, set alerts and export concise, spreadsheet-ready transaction data—with no coding, API setup or SQL required. By providing a bitcoin-only, GUI-first and export-friendly solution for wallet monitoring, Blockseer Explorer offers immediate benefit to a wide range of operators who want visibility, not complexity. Blockseer Explorer is available at no cost at About DMG Blockchain Solutions Inc. DMG is a publicly traded and vertically integrated blockchain and data center technology company that manages, operates and develops end-to-end digital solutions to monetize the digital asset and artificial intelligence compute ecosystems. Systemic Trust Company, a wholly owned subsidiary of DMG, is an integral component of DMG's carbon-neutral Bitcoin ecosystem, which enables financial institutions to move Bitcoin in a sustainable and regulatory-compliant manner. For additional information about DMG Blockchain Solutions and its initiatives, please visit Follow @dmgblockchain on X, LinkedIn and Facebook, and subscribe to the DMG YouTube channel to stay updated with the latest developments and insights. For further information, please contact: On behalf of the Board of Directors, Sheldon Bennett, CEO & Director Tel: +1 (778) 300-5406 Email: investors@ Web: For Investor Relations: investors@ For Media Inquiries: Chantelle Borrelli Head of Communications chantelle@ Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. Cautionary Note Regarding Forward-Looking Information This news release contains forward-looking information or statements based on current expectations. Forward-looking statements contained in this news release include statements regarding DMG's strategies and plans, increasing the Company's bitcoin balance and limit further reductions in its debt, explore building a broader digital asset portfolio, scheduled substation maintenance in August, the opportunity and plans to monetize bitcoin transactions and provide additional products and services to customers and users, the continued investment in Bitcoin network software infrastructure and applications, the expected allocation of capital, developing and executing on the Company's products and services, increasing self-mining, increasing hashrate, efforts to improve the operation of its mining fleet, the launch of products and services, events, courses of action, and the potential of the Company's technology and operations, among others, are all forward-looking information. Future changes in the Bitcoin network-wide mining difficulty rate or Bitcoin hashrate may materially affect the future performance of DMG's production of bitcoin, and future operating results could also be materially affected by the price of bitcoin and an increase in hashrate mining difficulty. Forward-looking statements consist of statements that are not purely historical, including any statements regarding beliefs, plans, expectations, or intentions regarding the future. Such information can generally be identified by the use of forwarding-looking wording such as "may", "expect", "estimate", "anticipate", "intend", "believe" and "continue" or the negative thereof or similar variations. The reader is cautioned that assumptions used in the preparation of any forward-looking information may prove to be incorrect. Events or circumstances may cause actual results to differ materially from those predicted, as a result of numerous known and unknown risks, uncertainties, and other factors, many of which are beyond the control of the Company, including but not limited to, market and other conditions, volatility in the trading price of the common shares of the Company, business, economic and capital market conditions; the ability to manage operating expenses, which may adversely affect the Company's financial condition; the ability to remain competitive as other better financed competitors develop and release competitive products; regulatory uncertainties; access to equipment; market conditions and the demand and pricing for products; the demand and pricing of bitcoin; the demand and pricing of AI data centers and usage; security threats, including a loss/theft of DMG's bitcoin; DMG's relationships with its customers, distributors and business partners; the inability to add more power to DMG's facilities; DMG's ability to successfully define, design and release new products in a timely manner that meet customers' needs; the ability to attract, retain and motivate qualified personnel; competition in the industry; the impact of technology changes on the products and industry; failure to develop new and innovative products; the ability to successfully maintain and enforce our intellectual property rights and defend third-party claims of infringement of their intellectual property rights; the impact of intellectual property litigation that could materially and adversely affect the business; the ability to manage working capital; and the dependence on key personnel. DMG may not actually achieve its plans, projections, or expectations. Such statements and information are based on numerous assumptions regarding present and future business strategies and the environment in which the Company will operate in the future, including the demand for its products, the ability to successfully develop software, that there will be no regulation or law that will prevent the Company from operating its business, anticipated costs, the ability to secure sufficient capital to complete its business plans, the ability to achieve goals and the price of bitcoin. Given these risks, uncertainties, and assumptions, you should not place undue reliance on these forward-looking statements. The securities of DMG are considered highly speculative due to the nature of DMG's business. For further information concerning these and other risks and uncertainties, refer to the Company's filings on In addition, DMG's past financial performance may not be a reliable indicator of future performance. Factors that could cause actual results to differ materially from those in forward-looking statements include, failure to obtain regulatory approval, the continued availability of capital and financing, equipment and/or infrastructure failures, lack of supply of equipment, power and infrastructure, failure to obtain any permits required to operate the business, the impact of technology changes on the industry, the impact of viruses and diseases on the Company's ability to operate, secure equipment, and hire personnel, competition, security threats including stolen bitcoin from DMG or its customers, consumer sentiment towards DMG's products, services and blockchain and AI technology generally, failure to develop new and innovative products, litigation, adverse weather or climate events, increase in operating costs, increase in equipment and labor costs, equipment failures, decrease in the price of Bitcoin, failure of counterparties to perform their contractual obligations, government regulations, loss of key employees and consultants, and general economic, market or business conditions. Forward-looking statements contained in this news release are expressly qualified by this cautionary statement. The reader is cautioned not to place undue reliance on any forward-looking information. The forward-looking statements contained in this news release are made as of the date of this news release. Except as required by law, the Company disclaims any intention and assumes no obligation to update or revise any forward-looking statements, whether as a result of new information, future events, or otherwise. Additionally, the Company undertakes no obligation to comment on the expectations of or statements made by third parties in respect of the matters discussed above.


CTV News
3 hours ago
- CTV News
North Bay transit gets $20M boost for hybrid buses, terminal upgrades
Northern Ontario Watch North Bay to get eight new hybrid buses and transit upgrades through more than $20 million in federal, provincial and municipal funding. The money will also improve sidewalks and stormwater systems.