logo
Gaya industrial smart city gets Centre's green signal

Gaya industrial smart city gets Centre's green signal

Time of India11-05-2025
PATNA:
Integrated Manufacturing Cluster
(IMC) in
Gaya
, one of India's premier greenfield smart industrial cities under the Amritsar-Kolkata Industrial Corridor (AKIC), has received environmental clearance from the ministry of environment, forest and climate change for a 1,670-acre development area.
An official from the
Bihar
Industrial Area Development Authority (BIADA) confirmed the milestone. "Spearheaded by Bihar Integrated Manufacturing City Gaya Limited (BIMCGL), a special purpose vehicle (SPV) formed by the central and state govts, this statutory approval marks a major milestone in transforming Bihar into a hub of industrial growth. The initiative merges economic opportunity with environmental responsibility, aiming to build a dynamic centre of innovation and inclusive development. IMC Gaya will reshape Bihar's industrial sector with Bodh Gaya evolving into the state's first integrated industrial township," the official said.
Connected to the Eastern Dedicated Freight Corridor (EDFC), the project is designed to enhance regional industrial capacity and develop world-class infrastructure. The IMC will cover over 1,000 acres of planned industrial plots, featuring zoned development, multimodal transport access, utilities, and logistics facilities. The initiative is being implemented by BIMCGL, a joint venture between the National Industrial Corridor Development Corporation (NICDC) and BIADA, with full support from central and state agencies.
A recent collaborative site inspection was carried out to assess the proposed water storage facilities and pipeline layout, ensuring sustainable water infrastructure for the township. This review followed an earlier evaluation of road connectivity, reinforcing the project's commitment to creating an efficient, fully integrated industrial ecosystem.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Govt pulls up Air India over rising safety issues
Govt pulls up Air India over rising safety issues

Hindustan Times

time5 hours ago

  • Hindustan Times

Govt pulls up Air India over rising safety issues

The government has begun holding direct meetings with Air India management amid mounting safety incidents, ordering the carrier to maintain the highest safety standards while setting a month-long timeline for reassessing its operations. Govt pulls up Air India over rising safety issues The first such meeting was held on Wednesday, in the midst of week in which an Air India aircraft caught fire at Delhi airport after landing from Hong Kong, a Kolkata-bound flight aborted takeoff due to technical issues, and a Kochi-Mumbai flight veered off the runway during landing in heavy rain. According to one of these people, the 'first meeting was held this evening where the airline gave a detailed explanation of their efforts towards maintaining safety'. The discussions, this person added, 'were held based on the incidents being reported by Air India and Air India Express. The ministry has ordered Air India to maintain highest level of safety standards. It will review the airline's operations after a month.' A second official said additional meetings are expected to focus on reviewing recent incidents and discussing fleet maintenance protocols. The direct government intervention comes amid heightened concerns over passenger safety following the June 12 crash of Air India Flight 171 that killed 260 people and a subsequent surge in technical incidents affecting the Tata-owned carrier. 'The outcome of these discussions will be crucial in restoring passenger confidence and ensuring that the airlines under the Air India group meet the highest safety benchmarks,' an official said. The Boeing 787 crash marked one of aviation's deadliest tragedies in recent years and prompted comprehensive safety reviews. A preliminary report by the Aircraft Accident Investigation Board (AAIB) has identified fuel control switches set to cutoff during takeoff as the main cause of the crash. Why the switches were flipped, or by whom, is now at the heart of the probe. Since that incident, at least 15 other operational issues and serious incidents have been reported involving Air India and its low-cost service arm Air India Express. Both carriers have faced mounting scrutiny over their operational standards. The incidents range from aborted take-offs and emergency returns to runway excursions and auxiliary power unit fires, raising questions about maintenance practices at India's privatised flag carrier. 'The government is expected to emphasise preventive measures and enforce strict adherence to safety and maintenance standards,' another official said. The meetings involve airline executives and senior officials from the Directorate General of Civil Aviation and civil aviation ministry. The regulator may seek detailed reports on maintenance practices, officials said. Following the AAIB's preliminary report that found fuel switches moved from 'run' to 'cutoff' position during the fatal flight's takeoff, the DGCA mandated Air India to inspect fuel control switch locking mechanisms on all Boeing 787 and 737 aircraft by July 22. Air India completed the inspections within the deadline, reporting no issues with the locking mechanisms. 'Air India had started voluntary inspections on July 12 and completed them within the prescribed time limit set by the DGCA. The same has been communicated to the regulator,' the airline said Tuesday. The safety concerns extend beyond Air India, with other carriers also reporting incidents. An IndiGo flight from Delhi to Goa experienced engine failure last week, though the airline termed it a technical snag. 'The real question is, how can they help mitigate these issues and what steps can they take? No airline management creates technical problems deliberately. Nevertheless, management must exercise greater vigilance,' said Jitender Bhargava, former Air India executive director. Aviation safety expert Amit Singh said the DGCA bears ultimate responsibility. 'They have a state safety plan with performance targets. If they feel that the number of incidents are found beyond the target, they must step in and take corrective action.' On Wednesday, an Air India Express flight from Kozhikode to Doha returned after being airborne for around one hour and 40 minutes due to an engine issue reported by the pilot. An airline spokesperson termed it a technical issue.

City-based real estate company falls victim to cyber fraud
City-based real estate company falls victim to cyber fraud

Time of India

time2 days ago

  • Time of India

City-based real estate company falls victim to cyber fraud

Kanpur: A prominent city-based real estate and trading company fell victim to a sophisticated cyber fraud. The fraudsters orchestrated the scam by establishing a counterfeit WhatsApp account using the managing director's photograph to communicate with the company's director regarding fund transfers. The deception came to light when the director and the managing director coincidentally met in Delhi. A swift action enabled the bank to withhold Rs 1.28 crore, while the incident was reported to the commissioner's Cyber Crime police station. On Sunday, the perpetrator, posing as managing director on WhatsApp, claimed to be engaged in a crucial meeting and discussed with the director a contract signing that required advance payment. The fraudster provided details of a Kolkata-based pharmaceutical firm, Maa Tara, including bank particulars and IFSC code, requesting a transfer of Rs 1.97 crore with UTR number confirmation. The director, who was in Delhi, processed the transfer but subsequently encountered the managing director, who confirmed no such instructions were issued. Immediate action was taken by contacting ICICI's Delhi headquarters and the Kanpur branch to halt the transaction. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Nazlat Alsman: Unsold Sofas May Be at Bargain Prices (Prices May Surprise You) Sofas | Search Ads Search Now Undo However, Rs 69 lakh were already disbursed across 15 to 16 transactions to various entities. Initially approaching Gurugram Cyber Crime police station, the company was directed to file the case in Kanpur, where the incident occurred. ACP Cyber Crime Shweta Kumari confirmed ongoing investigations into the transactions and WhatsApp account details.

EverEnviro's Indore CBG plant achieves 20 TPD output, highest PLF in India's bioenergy sector
EverEnviro's Indore CBG plant achieves 20 TPD output, highest PLF in India's bioenergy sector

Time of India

time2 days ago

  • Time of India

EverEnviro's Indore CBG plant achieves 20 TPD output, highest PLF in India's bioenergy sector

New Delhi: India's first large-scale compressed biogas (CBG) plant built on municipal solid waste (MSW) has reached a daily production of 20 tonnes, making it the most productive CBG facility in the country. Operated by EverEnviro Resource Management Pvt Ltd in partnership with the Indore Municipal Corporation (IMC), the facility has achieved the highest Plant Load Factor (PLF) in the sector. Commissioned in 2022 and inaugurated by Prime Minister Narendra Modi, the plant processes 550 metric tonnes of segregated organic waste every day. Built on a site that earlier contained more than 2,00,000 metric tonnes of legacy waste, the facility contributes to an estimated reduction of 70,000 tonnes of CO₂ equivalent emissions annually. Mahesh Girdhar, MD & CEO of EverEnviro, said, 'This achievement underscores the viability of industrial-scale bioenergy solutions in addressing urban waste challenges. It reflects effective collaboration across stakeholders and alignment with national climate and sustainability targets. Indore demonstrates what integrated, outcome-driven infrastructure can deliver.' In addition to 20 tonnes per day of CBG, the plant also generates 40 metric tonnes of organic fertilizer daily. The gas is distributed to over 15,000 households through Avantika Gas, Gujarat Gas, and Naveria Gas and is also used to power Indore's city bus fleet. Recognised as a national benchmark, the Indore plant has attracted interest from urban local bodies across India and international delegations from the UK, Nepal and Southeast Asia. The site has also become a hub for students, researchers and policymakers exploring scalable models for waste-to-energy and urban sustainability. The project aligns with India's clean energy and circular economy objectives and supports national initiatives like the Swachh Bharat Mission Urban 2.0 and SATAT (Sustainable Alternative Towards Affordable Transportation), contributing to India's broader net zero goals.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store