logo
Scranton buying land next to Novembrino splash pad/playground for parking

Scranton buying land next to Novembrino splash pad/playground for parking

Yahoo18-03-2025
SCRANTON – The city plans to buy part of a vacant lot next to the Novembrino splash pad and playground for off-street parking for visitors to the recreation site in West Side.
The land being purchased from owner Mary Regina LLC includes 9,628 square feet, or about one-quarter of the lot in the 200 block of South 10th Avenue between Novembrino Park and the offices of endodontist Dr. Frank A. DiNoia, DDS, the city said in a statement Friday.
The city of Scranton plans to buy for $34,000 part of a vacant lot next to Novembrino Park in West Scranton, shown here on Monday, Nov. 10, 2025, to use for off-street parking for visitors to the recreation site that includes a playground and a splash pad. The land being purchased from owner Mary Regina LLC includes 9,628 square feet, or about one-quarter of the lot in the 200 block of South 10th Avenue between Novembrino Park and the offices of endodontist Dr. Frank A. DiNoia, DDS. (JIM LOCKWOOD / STAFF PHOTO)
Last Tuesday, Scranton City Council introduced a resolution from the administration of Mayor Paige Gebhardt Cognetti authorizing the city to buy for $34,000 the 9,628 square feet of the part of the vacant lot closest to Washburn Street.
'Because of our many improvements at Novembrino Park, it is one of the most popular parks in the city,' Cognetti said in the statement. 'The addition of dedicated off-street parking at Novembrino can help us keep children and families safe as they enjoy this West Scranton attraction.'
Council voted 5-0 — with council President Gerald Smurl, Jessica Rothchild, Mark McAndrew, Tom Schuster and Bill King all in favor — to introduce the resolution, the city said. Council's agenda for its meeting this coming Tuesday at 6:30 p.m. at City Hall has the resolution listed for a vote on adoption.
Novembrino Park is home to the city's first splash pad that opened in July 2021 and a playground that opened in November 2023.
The city funded the playground improvements with federal American Rescue Plan Act dollars and support from the Monsignor Anthony C. Marra Memorial Fund of Friends of the Poor.
New playground equipment was installed at Novembrino Park in West Scranton in 2023, and show here in this photo on July 20, 2023. (TIME-TRIBUNE / FILE PHOTO)
The city's 2021 Parks Needs Assessment and Master Plan called for off-street parking at Novembrino and the city planned for the expense in the 2025 capital budget.
Meanwhile, as of last summer, the spongy surface of the splash pad at Novembrino Park had already deteriorated badly and officials had said it would be removed and replaced with a concrete surface.
Scranton Mayor Paige Gebhardt Cognetti at the city's first splash pad, at Novembrino Park in West Side, on July 22, 2021, and which opened that day. (JIM LOCKWOOD / STAFF PHOTO)
'The surface of the splash pad will be addressed this spring and we anticipate opening (the splash pad) for Memorial Day weekend,' city Business Administrator Eileen Cipriani said Monday via email.
*
The city of Scranton plans to buy for $34,000 part of a vacant lot next to Novembrino Park in West Scranton, shown here on Monday, Nov. 10, 2025, to use for off-street parking for visitors to the recreation site that includes a playground and a splash pad. The land being purchased from owner Mary Regina LLC includes 9,628 square feet, or about one-quarter of the lot in the 200 block of South 10th Avenue between Novembrino Park and the offices of endodontist Dr. Frank A. DiNoia, DDS. (JIM LOCKWOOD / STAFF PHOTO)
*
New playground equipment was installed at Novembrino Park in West Scranton in 2023, and show here in this photo on July 20, 2023. (TIME-TRIBUNE / FILE PHOTO)
*
The city of Scranton plans to buy for $34,000 part of a vacant lot next to Novembrino Park in West Scranton, shown here on Monday, Nov. 10, 2025, to use for off-street parking for visitors to the recreation site that includes a playground and a splash pad. The land being purchased from owner Mary Regina LLC includes 9,628 square feet, or about one-quarter of the lot in the 200 block of South 10th Avenue between Novembrino Park and the offices of endodontist Dr. Frank A. DiNoia, DDS. (JIM LOCKWOOD / STAFF PHOTO)
*
Scranton Mayor Paige Gebhardt Cognetti at the city's first splash pad, at Novembrino Park in West Side, on July 22, 2021, and which opened that day. (JIM LOCKWOOD / STAFF PHOTO)
*
The city of Scranton plans to buy for $34,000 part of a vacant lot next to Novembrino Park in West Scranton, shown here on Monday, Nov. 10, 2025, to use for off-street parking for visitors to the recreation site that includes a playground and a splash pad. The land being purchased from owner Mary Regina LLC includes 9,628 square feet, or about one-quarter of the lot in the 200 block of South 10th Avenue between Novembrino Park and the offices of endodontist Dr. Frank A. DiNoia, DDS. (JIM LOCKWOOD / STAFF PHOTO)
Show Caption
1 of 5
The city of Scranton plans to buy for $34,000 part of a vacant lot next to Novembrino Park in West Scranton, shown here on Monday, Nov. 10, 2025, to use for off-street parking for visitors to the recreation site that includes a playground and a splash pad. The land being purchased from owner Mary Regina LLC includes 9,628 square feet, or about one-quarter of the lot in the 200 block of South 10th Avenue between Novembrino Park and the offices of endodontist Dr. Frank A. DiNoia, DDS. (JIM LOCKWOOD / STAFF PHOTO)
Expand
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Retrospective plan for Conservation Area banner is refused
Retrospective plan for Conservation Area banner is refused

Yahoo

time5 hours ago

  • Yahoo

Retrospective plan for Conservation Area banner is refused

A LARGE banner on a Conservation Area building has been described as 'stark and discordant' by planning officers. Bradford Council has this week refused a retrospective application from a Mr Peter to attach an advertising banner on Arden House, on Wellington Street in Bingley. The banner, advertising the Flacks Fit gym, had been fitted on the building without permission. Conservation officers described the building, which dates back to the 1910s and is part of the Bingley Conservation Area, as having 'classically influenced architectural style.' Refusing the application, planners said: 'This banner is prominently located and poorly related to the architectural features of the building. 'It overlaps some of the window openings. As a result it appears stark and discordant. 'It is apparent that there is pressure for commercial advertising in the area, with a number of sporadic banners and other temporary signs have been fixed to various buildings. It is important that, in granting express consent, the Council does not set a precedent, and that signs do not add cumulatively to advertisement clutter in the locality. 'The sign is close to the grade II listed Bingley Railway Station and is within Bingley Conservation Area so special regard has been given to the proposal in light of the duty under the Planning (Listed Buildings and Conservation Areas) Act 1990.'

Homes on 'noisy road' must be sound proofed before first residents can move in
Homes on 'noisy road' must be sound proofed before first residents can move in

Yahoo

time16 hours ago

  • Yahoo

Homes on 'noisy road' must be sound proofed before first residents can move in

A DEVELOPER will have to show five new homes to be built beside a 'noisy' road have been sound proofed before anyone can move in. Wayne Gregory has been granted planning permission for the five homes on the site of a derelict former workshop which as well as being on what has been officially designated as a 'noisy road' is next door to a tyre fitters. As a result council planners have made it a condition of the permission that none of the homes can be occupied until post construction noise readings have been submitted to and approved in writing by the council. The readings will have to meet the recommendations of a noise impact report that was submitted as part of the application and demonstrated how 'desirable' noise levels could be achieved including a requirement for the building fabric to be upgraded. The report was required by the council as Snatchwood Road in Abersychan, Pontypool is defined as a 'noisy' road within a Welsh Government Noise Action Plan Priority Area and the former Artisan Precision Engineering site is next door to the Sam's Tyres fitting garage. Planning officer Justin Jones said residential homes shouldn't be approved if they are likely to lead to complaints, such as noise nuisance, that would force an existing commercial use to stop. However the planned homes will be oriented away from the garage. He said the assessment had shown road noise from the properties would be 'high' which has required action to achieve 'acceptable internal noise levels' including a mechanical ventilation system as upper floor windows will have to be shut. Read more: Plea to allow giant shed to be used for holiday lets rejected on appeal New flats development can support town centre, say planners It was also found there wouldn't be an unacceptable level of noise from the tyre fitters impacting the back gardens. There would be two parking spaces, as well as two garages provided for plots one and five, for each home which is below the council's guidelines but Mr Jones said as the site is in a sustainable location close to shops and with bus links the parking is considered acceptable. Other conditions relate to potential land contamination and details related to access and road markings.

New £8m council depot 'taking shape' for opening
New £8m council depot 'taking shape' for opening

Yahoo

timea day ago

  • Yahoo

New £8m council depot 'taking shape' for opening

A new £8.8m council depot is "taking shape" ahead of opening, an authority said. South Kesteven District Council (SKDC) plans to take control of the depot in Turnpike Close, Grantham from contractor Lindum Group on 30 October, with a go-live date scheduled for 1 December. The authority said it would accommodate a range of services including waste, park maintenance and street cleaning, along with more than 250 staff. SKDC's cabinet member for property and public engagement, Councillor Richard Cleaver, described the new depot as "future-proofed and sustainable". Clearance works have begun at the current depot in Alexandra Road, which was built in the 1970s and is at the end of its operational life, a spokesperson said. The old depot will remain in operation until the handover has taken place and SKDC said it was continuing to assess options for the site's future use. Work completed so far includes the steel structures for the main depot building and external brickwork. The roof and external cladding are being added, and joinery work is scheduled in the next few weeks. The authority said Lindum Group was working on the lorry parking area and work would start on the main car park next. SKDC said it had allocated £500,000 in addition to the build cost for mobilisation to relocate its services and staff from the existing depot. Cleaver said the new depot would "improve welfare and working conditions for our brilliant staff". Listen to highlights from Lincolnshire on BBC Sounds, watch the latest episode of Look North or tell us about a story you think we should be covering here. Download the BBC News app from the App Store for iPhone and iPad or Google Play for Android devices More on this story Work starts on new £8m council depot Related internet links South Kesteven District Council

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store