
Waterloo's Elizabeth Ziegler Public School closed for the rest of the year
The school originally shut down on March 4 after safety concerns were raised about the building's facade. The closure was extended twice, with students expected to go back on April 1.
On Friday, Waterloo Region District School Board (WRDSB) sent out a release announcing the full closure.
"Based on the current assessment by the structural engineering firm retained by the board, we are not able to occupy any part of the Elizabeth Ziegler PS building," the release said.
"Addressing these concerns will take time and the engineers estimate this work could take months to complete. This is a result of the mechanical and electrical connections that run throughout the building, as well as the large pieces of precast concrete and monuments that need to be carefully removed during the repair process," the release continued.
In the meantime, students and families are being asked to pick up a Chromebook or iPad at the school on Monday to help to continue learning remotely.
The board said it is adding additional portables that have "already started arriving at the school, with more portables scheduled to arrive over the next few days."
However, only 12 portables are allowed on the property, which will not accommodate the more than 500 Junior Kindergarten to Grade 6 students and the staff who attend the school.
"Alternative spaces that support the needs of students in surrounding public schools are limited and a thorough planning process is on-going to accommodate all students in-person," the release said.
The plan remains to have students return to in-person learning on April 1, but it's unclear where exactly they'll be.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles

CBC
6 days ago
- CBC
Parents 'hopeful but skeptical' after news Waterloo's Elizabeth Ziegler will be shuttered for 2 years
Parents are concerned after news Elizabeth Ziegler Public School (EZPS) in Waterloo will remain closed for at least two years. The updated reopening date of the school is now set for September 2027, according to an update posted the school's website on July 22. Previously, messaging from the Waterloo Region District School Board (WRDSB) was that the expected reopening would be in September 2026. EZPS parent Ian McDonald said the extension wasn't much of a surprise. "I am hopeful but skeptical it will be ready by September '27," he said in an email to CBC News. "My daughter is entering Grade 4 at Sandowne, and is unlikely to see Ziegler again before she graduates to MacGregor Senior Public School," he added. The nearly 100-year-old school building was originally shut on March 4 when a large piece of concrete fell from the facade. The closure was, at first, for just two days, then two weeks, and then it was announced it would be closed for the rest of the school year and into the next. Of the over 500 students at EZPS, some will be relocated to portables but most will attend other schools in September, like Sandowne Public School. Sandowne's enrolment in the 2023-2024 school year was about 240 students. The influx will bring that school's student population up into the high 600s, according to the Waterloo Region District School Board (WRDSB). "I also have concerns about two full school years of not just overcrowded, but I mean like more than double capacity," said Dave Earle, whose two children attended Elizabeth Ziegler before the closure. "We're going to have to deal with two big moves," Earle said. "One to Sandowne and if they're there for two years then they'll have made friends … and they'll have to break all those to come back." Earle is concerned the increased student population at Sandowne will result in less time for things his kids find important. "Last year when we finished the school just in portables, they had no library time, they had no assemblies," he said, "It was just whatever they could do outdoors." But Bill Lemon, WRDSB's director of business services, says they've built portable infrastructure for Sandowne to accommodate the number of students who will be attending next school year. Sandowne's website also says, "the building and property have the capacity to support more than 700 students. This includes the outdoor space for nutrition breaks and athletics, the building's washrooms, plumbing and electrical capacity." Lemon said the decision to extend the closure another year comes after the board received its detailed engineering and architectural report back in June. "We got some clarity with the engineer's report and with the schematic drawings," Lemon told CBC News. "Based on the work that was needed for the restoration, we now had some concrete tasks that needed to be completed. With the work, alongside our architect and our own facility services people, we were able to build a construction timeline," he said. The revised timeline means construction is now expected to begin in early 2026 and finish in the summer of 2027, Lemon said. That would leave a short window for the board to prepare the school for students before the start of the fall term. Lemon said the size of this project classifies it as a capital project and that the board approached the ministry of education for next steps and funding opportunities. Lemon said the conversation was "productive" but the ministry did not commit any additional funding for the restoration. Instead, the board plans to cover the costs from its own capital budget over the next two years, a move Lemon says could mean adjusting other school board projects across the region. The building's heritage designation is also adding to the complexity. Lemon said some features, like the masonry work, need to be restored to look original, which requires special contractors. Pre-qualification for those contractors is already underway, said Lemon, and the board hopes to begin tendering those early this fall. The board says it will provide regular updates as the project moves through design, tendering and construction.


Global News
6 days ago
- Global News
Pirate Pak Day: Okanagan camper prepares for Zajac Ranch Camp for Children
Being on a stroll outdoors is one of Gillian Rezanson's favourite things. The Vernon, B.C., woman is taking a midday wlk with her service dog, Shamrock, and her personal support worker, Aleisha MacLeod, before a much-deserved coffee break. There, they can discuss their annual trip to Zajac Ranch for Children in Mission, B.C. 'You get to be with people who understand and get it. Our community is great that way, too, but you get to interact with other people and campers. That is really exciting,' said MacLeod. Rezanson is on the spectrum and uses a program on an iPad that communicates for her, with a British accent. She also speaks some sign language. The camp gives children and young adults with disabilities and medical conditions the ultimate camp experience. Get daily National news Get the day's top news, political, economic, and current affairs headlines, delivered to your inbox once a day. Sign up for daily National newsletter Sign Up By providing your email address, you have read and agree to Global News' Terms and Conditions and Privacy Policy 'Having people recognize Gillian and checking that all of your needs are met, that was pretty cool,' said MacLeod. Story continues below advertisement 2:19 Woman paddling 365 kilometres for Autism awareness The ranch sits on a 44-acre property at Stave Lake with a 24-hour medical centre and is fully accessible for the 400 campers that come every year. 'It's a really special place,' said Zajac Ranch for Children president, Carmen Zajac. 'It's very different from most camps, and often campers will be coming to camp for the first time and perhaps even leaving home for the first time.' Zajac Ranch is the beneficiary of White Spot's Pirate Pak Day, where adults get to be kids again, and $2 of every meal is donated to a nonprofit to help offset the $800,000 annual operating fees. The fees are high because of the need for a high number of support care workers in relation to the campers to make sure everyone has a safe camp experience. Story continues below advertisement 'People really look forward to the Pirate Pak Day,' said Zajac. 'They can raise over $100,000 in that one day, so it's truly impactful.' As adults prepare to set sail on a nostalgic meal adventure on Wednesday, Rezanson and MacLeod are getting ready to pack their bags for Zajac Ranch for Children.


CTV News
11-08-2025
- CTV News
WRDSB says Elizabeth Ziegler Public School will reopen in 2027
The exterior of Elizabeth Ziegler Public School in Waterloo, Ont. The Waterloo Region District School Board has finally set a date for the reopening of Elizabeth Ziegler Public School. The Moore Avenue building closed in March due to structural concerns and, once it was announced the school would not reopen before the summer break, students were moved into portables on the property or transferred to other schools. The Waterloo Region District School Board released the results of its structural engineering assessment of Elizabeth Ziegler Public School on June 11. Elizabeth Ziegler Public School A section of the outside of Elizabeth Ziegler Public School seen on March 12, 2025. (CTV News/Colton Wiens) It detailed the extensive repairs needed within the building to address cracks, corrosion and deterioration of building materials. The school board said the proposed work would extend the life of Elizabeth Ziegler Public School, improve future maintenance and ensure the safety of students, staff and visitors. Elizabeth Ziegler Public School Waterloo Damage to the facade at Elizabeth Ziegler Public School in Waterloo on June 9, 2025. (Spencer Turcotte/CTV News) No details have been shared about the cost of the project. In a July 22 post on the school's website, the Waterloo Region District School Board said Elizabeth Ziegler Public School was expected to reopen in September 2027.