
RM250 million water treatment plant to be built at Mengkuang dam for consumers in SPT
He said the proposed project, which will be about 550 metres from the Expanded Mengkuang Dam (EMD), when completed in November next year, is capable of supplying a maximum of 114 million litres per day (MLD) of treated water to consumers, particularly in the Seberang Perai Tengah (SPT) district.
The Taman Mengkuang WTP project, expected to take 18 months to complete, will draw daily water supply from the EMD, which is the largest dam in the state, he said.
'So far, the EMD has served as a strategic water storage dam, releasing water only during emergencies when the Sungai Dua Water Treatment Plant (WTP) is unable to abstract sufficient water from Sungai Muda.
'However, starting November 2026, EMD will transition into a dual-purpose dam. Once fully operational, it will release raw water daily to support the Taman Mengkuang WTP, while continuing to serve as an emergency backup source for the Sungai Dua WTP under abnormal conditions,' he added.
Chow, who is PBAPP chairman, told reporters this after opening the groundbreaking ceremony for the Taman Mengkuang WTP Project here today.
He said the construction of the new WTP was among the proactive measures taken by the state government to address the growing water demand, as Penang's water consumption has risen from 813 million litres per day (JLH) in 2014 to 870 JLH in 2024, with projections indicating it will further increase to 1,103 JLH by 2030.
Meanwhile, PBAPP chief executive officer Datuk K. Pathmanathan said the project includes the construction of a 114-JLH water treatment module, a backwash pump house, a chemical dosing building and a treated water tank.
In addition, he said, it also involves the construction of a sludge treatment building, a cleaning pump and a chemical waste storage pond, a storage pond and an administration building equipped with a supervisory control and data acquisition (SCADA) system.
'This contract also includes the installation of a 1,200-millimetre (mm) diameter raw water discharge pipe from the dam and a 900mm-diametre treated water production pipe for connection to the existing treated water supply line.
'It also involves all civil, structural, mechanical and electrical works,' he said.
According to Pathmanathan, currently, most of the treated water supply at SPT is drawn from the Sungai Dua WWTP in Seberang Perai Utara (SPU), but this dependence is expected to decrease when the Taman Mengkuang WWTP begins operating.
He said the new LRA would not only strengthen the water supply in SPT but also provide indirect benefits to consumers in SPU and South Seberang Perai (SPS).
He said the Taman Mengkuang LRA is the third project under the Water Contingency Plan 2030 (WCP 2030), and there are five more projects under the plan that need to be completed before 2030.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


New Straits Times
a day ago
- New Straits Times
AMD expands R&D footprint with state-of-the-art Malaysian facility
GEORGE TOWN: AMD today inaugurated its new state-of-the-art office and engineering lab facility in Bayan Lepas here. This marks a significant milestone in AMD's commitment to expanding its global business services and engineering presence in Malaysia. The new office at GBS by the Sea, which spans 209,000 square feet, is designed to support over 1,200 employees. It features open workspaces and state-of-the-art engineering labs to drive advances in semiconductor design. The launch was inaugurated by chief minister Chow Kon Yeow. Also present were Malaysian Investment Development Authority (MIDA) chief executive officer Datuk Sikh Shamsul Ibrahim Sikh Abdul Majid, AMD global operations senior vice president Keivan Keshvari and AMD Penang site lead Chuang-Li Khoo. Chow said as AMD celebrates its over five decades presence in Penang, the milestone stood as a strong testament to Penang's position as a sustainable and thriving investment destination. "As global trends shift rapidly toward frontier technologies such as Al, the Penang government, via InvestPenang, remains committed to supporting forward-looking investors like AMD in these transformative fields," he said. Sikh Shamsul Ibrahim said AMD's new facility in Penang was a testament to the enduring and evolving partnership between Malaysia and a global technology leader. "From our initial collaboration in manufacturing five decades ago to this significant investment in integrated circuit design and high-value services, AMD's journey mirrors Malaysia's own progression up the semiconductor value chain. "By anchoring R&D and advanced capabilities here, AMD is not only creating high-quality jobs but also fostering a dynamic ecosystem where local talent and firms can thrive alongside global innovators," he said. He added that aligned with the New Industrial Master Plan 2030, the National Semiconductor Strategy and the 13th Malaysia Plan, MIDA was proud to have supported AMD's strategic growth in Malaysia. Meanwhile, Keivan said the opening of the advanced facility underlined AMD's long-term commitment to Malaysia's thriving semiconductor ecosystem. The new office will enable AMD to develop, build and deliver the next generation of high-performance, adaptive and Al computing solutions across the AMD portfolio while supporting Malaysia's continued growth as a hub for technological innovation. With expanded capabilities and a focus on innovation, the Penang facility will play a key role in supporting AMD growth while contributing meaningfully to Malaysia's semiconductor ecosystem, Keivan added.


The Sun
a day ago
- The Sun
AMD opens new R&D facility in Penang to boost semiconductor innovation
GEORGE TOWN: Nasdaq-listed Advanced Micro Devices Inc (AMD) has strengthened its presence in Malaysia with a new office and engineering lab in Bayan Lepas. The 19,416.74 square metre facility at GBS by the Sea will support over 1,200 employees and drive semiconductor design innovation. Chief Minister Chow Kon Yeow highlighted Penang's role as a thriving investment hub during the official launch of AMD @GBS By The Sea. He emphasised the state's commitment to supporting cutting-edge technologies like AI and fostering homegrown semiconductor advancements. 'Our goal is to see the first generation of 'Made by Malaysia' chips designed, developed, and driven from Penang,' Chow said. Malaysian Investment Development Authority (MIDA) CEO Datuk Sikh Shamsul Ibrahim Sikh Abdul Majid praised AMD's expansion as a milestone in Malaysia's tech partnership. He noted that the facility will create high-value jobs and strengthen the local innovation ecosystem. 'MIDA is proud to support AMD's growth, aligning with Malaysia's New Industrial Master Plan 2030 and semiconductor strategy,' he added. AMD stated that the new facility reflects its confidence in Malaysia's talent and semiconductor potential. The company said the Penang site will play a crucial role in its global growth and Malaysia's tech ecosystem. - Bernama

The Star
a day ago
- The Star
AMD expands R&D footprint with new facility in Penang
FILE PHOTO: The logo of semiconductor company Advanced Micro Devices Inc (AMD) is seen on a graphics processing unit (GPU) chip in this illustration picture. REUTERS/Florence Lo/Illustration/File Photo GEORGE TOWN: Nasdaq-listed Advanced Micro Devices Inc's (AMD) new state-of-the-art office and engineering lab facility in Bayan Lepas underscores the company's commitment to expanding its global business services and engineering presence in Malaysia. The new office at GBS by the Sea spans 19,416.74 square metres and is designed to support over 1,200 employees as well as hi-tech engineering labs to drive advances in semiconductor design. Chief Minister Chow Kon Yeow said that as AMD celebrates its over five-decade presence here, this milestone stood as a strong testament to Penang's position as a sustainable and thriving investment destination where companies can grow and flourish. "As global trends shift rapidly toward frontier technologies such as Al, the Penang state government, via InvestPenang, remains committed to supporting forward-looking investors like AMD in these transformative fields. "Our goal is to see the first generation of 'Made by Malaysia' chips designed, developed and driven from Penang proudly taking their place in the global semiconductor market," he said at the official launch of AMD @GBS By The Sea here today. Malaysian Investment Development Authority (MIDA) chief executive officer Datuk Sikh Shamsul Ibrahim Sikh Abdul Majid, who is also present at the event, said AMD's new facility in Penang is a testament to the enduring and evolving partnership between Malaysia and a global technology leader. He said that by anchoring research and development (R&D) and advanced capabilities here, AMD is creating high-quality jobs and fostering a dynamic ecosystem where local talent and firms can thrive alongside global innovators. "Aligned with our New Industrial Master Plan 2030, the National Semiconductor Strategy and the 13th Malaysia Plan, MIDA is proud to have supported AMD's strategic growth in Malaysia and looks forward to continuing this shared journey of innovation with AMD for many years to come," he added. In a statement issued after the event, AMD said the new office reinforces the company's long-standing presence in Malaysia and reflects its confidence in the region's talent and potential. "With expanded capabilities and a focus on innovation, the Penang facility would play a key role in supporting AMD's growth, while contributing meaningfully to Malaysia's semiconductor ecosystem," it added. - Bernama