logo
Oswego may relocate dog park

Oswego may relocate dog park

Chicago Tribune21-06-2025
Oswego trustees as a committee of the whole Tuesday evening will discuss the feasibility of relocating the dog park in the village due to declining use and revenue.
Trustees in 2021 expressed support for the creation of a dog park in the village as a way for families to have a 'spot for recreation' with their pets. Concept plans were prepared for construction of a dog park at the northeast corner of Plank Drive and Theodore Drive on 1.5 acres near the Public Works facility on the village's southeast side.
It cost the village $110,000 to build the Happy Tails Dog Park, which included fencing, a fountain, shade sail and sidewalks, village officials said.
The dog park opened in 2023 and was initially well-received, officials said. However, an analysis shows there is declining use of the facility, according to officials.
'Since that time, participation has gradually declined,' Oswego Management Analyst Alejandro Hardaway said in a report to trustees.
The village eliminated the annual dog park fee at the start of the current fiscal year due to its anticipated closure because of the eventual expansion of the village's nearby Public Works facility, he said.
'There are currently 133 active card holders, a decline in the peak total number of unique users since the dog park's inception of 451,' he said.
Revenues from the park dropped from $11,238 in 2023 to $7,194 in 2024, officials said.
Operational expenses are minimal, totaling about $3,200 per year in Public Works staff time and materials, according to officials. Additional facility maintenance costs are between $500 to $700 annually.
The 2025 Oswego Community Survey shows only 5% of respondents report visiting the dog park, with 95% of respondents saying they do not use the site, Hardaway said in a report to trustees.
'These findings reflect that while the dog park is recognized by a majority of the community, actual utilization remains low,' Hardaway said.
Village staff has suggested relocating the dog park if trustees are interested in keeping it open. Possible sites include an area near Venue 1012, a 2-acre park east of the Oswego Police Department and a 4-acre area at the Hunt Club water tower property.
The Oswegoland Park District was approached about taking ownership of the village's roughly $18,225 in equipment to open its own dog park, but the offer was declined, village officials said.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Aurora City Council approves new leadership of Finance, Public Works departments
Aurora City Council approves new leadership of Finance, Public Works departments

Chicago Tribune

time2 days ago

  • Chicago Tribune

Aurora City Council approves new leadership of Finance, Public Works departments

The Aurora City Council on Tuesday approved the appointments of new leadership for the city's Finance and Public Works departments. The two appointees — Stacy Peterson, the new Chief Financial Officer and City Treasurer, and Jason Bauer, the new Director of Public Works and City Engineer — are the latest to be picked by Mayor John Laesch for top city leadership positions since he took office in May. Unlike other department heads Laesch has appointed, both Peterson and Bauer already worked for Aurora. Since first being hired by the city in 1999, Peterson has served as an accountant, accounting supervisor, assistant director of finance for budgeting and most recently as director of financial operations, her resume shows. She also briefly served as the interim Chief Financial Officer and City Treasurer from March 2017 to January 2018. Peterson is filling the vacancy left by former Chief Financial Officer and City Treasurer Chris Minick, who departed earlier this month after serving in the role since 2021. In her new role, Peterson will lead the Finance Department and its nearly 50 employees across various divisions, including accounting and payroll, budget, purchasing, revenue and collections, the city's motor vehicle parking administration and water billing, according to a recent city news release announcing her appointment. Laesch previously told The Beacon-News that Peterson has earned the job and that she will help keep budget and accounting procedures consistent across the department's change in leadership, especially since she helped create some of those procedures. Also because of her efforts, the city now has a streamlined budgeting process, efficient budget forecasting and a yearly public budget document, the city news release said. Plus, the news release noted that Aurora has received the Government Finance Officers Association Distinguished Budget Presentation Award for 26 consecutive years, which includes years under her leadership. Peterson said in the news release that she is honored to be selected for the role and looks forward to working with Laesch, along with his administration and City Council, to 'continue to secure fiscal responsibility and ethical governance.' In addition to her role with the city, Peterson is also an active member of both the Government Finance Officers Association and the Illinois Government Finance Officers Association, plus serves on the board of the Aurora Policemen Credit Union, the news release said. As for Bauer, he was appointed to be the director of Public Works and city engineer after serving in the role as an interim for months. The former director of Public Works and city engineer, Ken Schroth, left the city in March. Schroth's LinkedIn profile and the Panama City Beach, Florida, municipal website list him as that city's assistant utilities director. Bauer has worked at the city for over 10 years and started as a professional engineer in 2014, according to his resume. He became the assistant director of Public Works and assistant city engineer in June 2018, which he held until he became the interim director earlier this year. As assistant director and assistant city engineer, Bauer helped in daily operations and led efforts to put in place the city's annual capital improvement plan, according to the city's news release about his appointment. Plus, he both developed and worked to put in place the city's lead service line replacement program, and he serves on the state Lead Service Line Replacement Advisory Board, officials said in the news release. In his new role, Bauer will oversee the Public Works Department and its nearly 200 employees across various divisions, including engineering, street maintenance, water production, water and sewer maintenance, downtown services and electrical maintenance, the news release said. Bauer said in the news release that he is honored to have been chosen by Laesch and City Council for the job. Their confidence and support reflects not only on him but also on the entire department he now officially leads, he said. 'I am proud to be part of such a hardworking and committed team, and I look forward to doing everything I can to support their efforts as they continue delivering exceptional service to our residents and advancing the vision set forth by the mayor and City Council,' Bauer said, according to the release. The appointments of both Bauer and Peterson come soon after the Aurora City Council made exceptions to a rule requiring all department heads to live within the city or move there within one year of being appointed by the mayor and approved by the City Council. Now, that rule does not apply to department heads that are required to have a professional license or are required to have specialized training or knowledge. The roles filled by Bauer and Peterson are covered by this exception, and a city spokesperson previously confirmed that neither live within city limits. City officials have said that the change allows the city to be more competitive and have more flexibility to hire candidates based on qualifications, character and commitment, rather than being limited by where they live.

Major Baltimore County water main break transpired with replacement project in the works
Major Baltimore County water main break transpired with replacement project in the works

CBS News

time5 days ago

  • CBS News

Major Baltimore County water main break transpired with replacement project in the works

A water line replacement project was in the works along York Road before a major water main break blocked roads and forced some businesses to close over the weekend in Baltimore County. Lauren Buckler, the director of Public Works and Transportation, said the project consists of adding a new water line and later cutting off the old 30-inch line. On Friday, an aging 30-inch water main ruptured on York Road between Schilling Road and Ashland Avenue, which remains closed. Baltimore County officials had hoped to open the road fully by Monday, but now it appears it won't be until Tuesday, as contractors continue to patch up the road. "I want to thank the citizens who have worked with this logistics," Buckler said. "I know that it's difficult. I know it's annoying not to have water. It's annoying to have road detours." Buckler said the next phase of the water line replacement project was going to be on York Road, from Wight Avenue to Shawan Road, which would cover the area where Friday's broken water main sent water flowing onto the streets. "That section is designed," Buckler said. "We're moving forward toward bidding construction. We hope to be awarding construction by the end of this calendar year." Buckler said the county has worked on this project for more than two decades, and it could take two more years to complete. "This is still a busy section of road," Buckler said. "There will be a lot of traffic maintenance while we're doing that. So, it's not that we just shut down and move full steam ahead like this was because this was an emergency." Several businesses along York Road are fortunate to be back open and see repair work moving quickly. "The workers here did a great job," said Trey English, from Brooks-Huff Tire & Auto Centers. "We're very thankful for the around-the-clock fixings," said Samantha Giancola, the owner of Bagel Works Hunt Valley. Over the weekend, businesses like Bagel Works Hunt Valley took a big hit. "We lost money on our wholesale accounts. We lost money on our catering," Giancola said. "So, we will rebuild that. Hopefully, we'll have a great sales week." English said business at Brooks-Huff Tire & Auto Centers is slowly picking up after a slowdown due to the water main break. "We have some business filtering in," English said. English said it hurts to see businesses closing, even for a few days, while crews close and repair the roads. "These are small businesses, and missing a day can ruin your entire budget for the month," English said. Frustrations still remain on York Road as the business owners question whether they have to prepare for another water main break in the future. "I do think that we all need to take a look at what it's going to look like to fix, maintain, rebuild to a consistent place where this won't happen again," Giancola said. "This all could have been avoided if it had been addressed immediately or sooner rather instead of kicking the can down the road," English said.

Village of Harrison breaks ground on public works garage expansion
Village of Harrison breaks ground on public works garage expansion

Yahoo

time18-07-2025

  • Yahoo

Village of Harrison breaks ground on public works garage expansion

HARRISON, Wis. (WFRV) – The Village of Harrison officially broke ground Wednesday morning on a major expansion and remodel of its public works garage. The project includes an 11,400-square-foot addition to the existing garage and features a new pass-through wash bay, as well as three additional full pass-through parking bays. Festival Foods unveils record-breaking cherry display in De Pere Crews will convert the current wash bay into new office space for the Department of Public Works, complete with ADA-compliant restrooms and added storage. The existing garage will also receive a full resurfacing of its concrete floor with a resinous flooring system, along with an upgraded vehicle exhaust removal system. 'At McMahon, we help communities thrive, and this expansion is a perfect example of that commitment,' said Paul Benedict, president of McMahon. 'Our partnership with the Village of Harrison has always been about finding solutions that grow with their needs, and we're excited to see this project come to life.' NFL Draft in Green Bay exceeds economic impact projects with over $100 million statewide 'This project will be a great addition for the village and will allow it to better serve the community as it continues to grow,' added Mitch Beilfuss, project executive at Bayland Buildings, which is assisting in the remodel. Construction is expected to be completed by March 2026. Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed. Solve the daily Crossword

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store