Latest news with #43-101TechnicalReport


Business Upturn
31-07-2025
- Business
- Business Upturn
Increases Total Mineral Inventory: Provides Results of Updated Mineral Resource and Reserves
By GlobeNewswire Published on July 31, 2025, 10:30 IST Increases Total Mineral Inventory: Provides Results of Updated Mineral Resource and Reserves Serabi Gold plc ('Serabi' or the 'Company') (AIM:SRB, TSX:SBI, OTCQX:SRBIF), the Brazilian focused gold mining and development company, is pleased to announce updated Mineral Reserve estimates and Mineral Resource estimates for its Palito Mine, prepared in accordance with the standard of CIM and Canadian National Instrument 43-101, with an effective date of 1 April, 2025 as outlined below (all financial amounts are expressed in U.S. dollars unless otherwise indicated) . HIGHLIGHTS Proven and Probable ('2P') Reserves totalling 162,600 ounces (706,000 tonnes at 7.2 g/t Au) compared to 206,400 ounces (824,800 tonnes @ 7.8 g/t Au) in July 2023. Reserve life is equivalent to over six years of operations at current production levels, without considering conversion of additional mineral resources. Measured and Indicated ('M&I') Resources of 388,400 ounces of contained gold (1,252,900 tonnes @ 9.6 g/t Au), a 3% increase compared to 377,800 (1,166,300 tonnes @ 10.1 g/t) in December 2023. Inferred Resources of 163,900 ounces (690,200 tonnes @ 7.4 g/t Au), a 7% increase compared to 153,900 ounces (682,400 tonnes @ 7.0 g/t Au in July 2023). NCL Ingeniería y Construcción SpA of Santiago de Chile ('NCL') is preparing this Mineral Resource and Mineral Reserve estimation together with a new 43-101 Technical Report which is expected to be issued within 45 days of the date of this release. Mike Hodgson CEO commented: 'This updated Mineral Resource demonstrates Serabi's ability to replenish resources on a consistent basis. We have regularly maintained our ability to replace production with new resources and in this instance, the combined Measured, Indicated and the Inferred resource categories have increased by 4% since 2023. The Company has a strong track record of maintaining a ~500koz ounces total mineral inventory at the Palito Complex and this latest estimate is no different as we increase to 552koz. Within this mineral resource inventory, we have reported a 2P Mineral Reserve of ~163koz, equating to over six years of reserve life at current extraction rates, excluding any future resource to reserve conversion. For a narrow vein mine, this is a great position to be in. With São Chico on care and maintenance since 2022, the 2023 estimated resources and reserves have simply been restated here, albeit these resources and reserves were calculated at a more conservative gold price and exchange rate. In early 2025 we embarked on a $9m brownfield surface exploration drill programme spread across the Palito Complex and Coringa, approximately 50% of this budget will be used at Palito to test extensions of known orebodies. As this drill programme did not commence until March, this updated resource estimate does not include results from the exploration programme. We therefore look forward to an update in early 2026, when we do expect to incorporate results from our 'aggressive' brownfield programme. In the meantime, this increase, which excludes the surface drill programme, is especially pleasing.' The Mineral Reserve estimate was prepared by Mr Carlos Guzman of NCL Ingeniería y Construcción SpA, who is a Qualified Person under the Canadian National Instrument 43-101. The Mineral Resource estimate was prepared by Mr Nicolas Fuster of NCL Ingeniería y Construcción SpA, who is a Qualified Person under the Canadian National Instrument 43-101. Mineral Reserve Estimates The updated Mineral Reserve estimates for the Palito Mine and the São Chico Mine are based on data as at 1st April 2025. Table 1: Palito Complex Mineral Reserve Statement as of April 1, 2025 Mineral Reserve Statement for the Palito Complex (Palito and São Chico Mines) Palito São Chico Combined Tonnes Grade Contained Tonnes Grade Contained Tonnes Grade Contained (000's) (g/t Au) (000's oz) (000's) (g/t Au) (000's oz) (000's) (g/t Au) (000's oz) Proven 422.4 7.7 103.8 46.1 8.2 12.2 468.5 7.7 116.0 Probable 223.6 6.0 43.1 14.1 7.7 3.5 237.7 6.1 46.6 Total Reserves 645.9 7.1 147.0 60.2 8.1 15.6 706.1 7.2 162.6 Notes to Palito Complex Mineral Reserve Estimates Mineral Reserves have been rounded to reflect the relative accuracy of the estimates. Proven Mineral Reserves are reported within the Measured classification domain, and Probable Mineral Reserves are reported within the Indicated classification domain. Palito Mine Proven and Probable Mineral Reserves are inclusive of external mining dilution and mining loss and are reported at a cut-off grade of 3.98 g/t gold for Palito Mine and assuming an underground shrinkage mining scenario, a gold price of US$2,000/oz, a 5.5:1 Brazilian Real to U.S. Dollar exchange rate, and metallurgical recoveries of 93.2%. São Chico Mine Proven and Probable Mineral Reserves are inclusive of external mining dilution and mining loss and are reported at a cut-off grade of 4.0 g/t gold and assuming an underground shrinkage mining scenario, a gold price of US$1,800/oz, a 5.0:1 Brazilian Real to U.S. Dollar exchange rate, and metallurgical recoveries of 93.8%, as estimated in 2023 and re-stated in this release . Serabi is the operator and owns 100% of the Palito Mine such that gross and net attributable mineral reserves are the same. The mineral reserve estimate was prepared by NCL in accordance with the standard of CIM and NI 43-101, with an effective date of April 1, 2025, and audited and approved by Mr. Carlos Guzmán of NCL, who is a Qualified Person under NI 43-101. Mineral Resource Estimates The updated Mineral Resource estimates for the Palito Mine and the Sao Chico Mine are based on data as at 1st April 2025 and 31st July 2023, respectively. Table 2: Mineral Resource Statement, Palito Mine as of April 1, 2025 Classification Tonnes Grade Contained (000's) (g/t Au) (000's) Measured 769 10.8 267.5 Indicated 333 7.7 82.5 Measured and Indicated 1,102 9.9 350.0 Inferred 682 7.4 161.8 Notes to Palito Mine Mineral Resource Statement Mineral Resources are not Mineral Reserves and have not demonstrated economic viability. Mineral Resources are reported inclusive of Mineral Reserves. Figures are rounded to reflect the relative accuracy of the estimates. Mineral Resources are reported within classification domains with no dilution applied at a cut-off grade of 2.92 g/t gold assuming an underground extraction scenario, a gold price of US$2,500/oz, metallurgical recovery of 95% and exchange rate of R$ 6.0/US$. Polygonal techniques were used for Resources estimates. The mineral resource estimate was prepared by NCL in accordance with the standard of CIM and NI 43-101, with an effective date of April 1, 2025, and audited and approved by Mr. Nicolas Fuster of NCL, who is a Qualified Person under NI 43-101. Table 3: Mineral Resource Statement, São Chico Mine as of July 31, 2023 Classification Tonnes Grade Contained (000's) (g/t Au) (000's) Measured 123 8.1 31.9 Indicated 29 7.1 6.5 Measured and Indicated 151 7.9 38.4 Inferred 8 6.5 1.7 Notes to Mineral Resource Statement, São Chico Mine Mineral Resources are not Mineral Reserves and have not demonstrated economic viability. Mineral Resources are reported inclusive of Mineral Reserves. Figures are rounded to reflect the relative accuracy of the estimates. Mineral Resources are reported within classification domains with no dilution applied at a COG of 3.32 g/t gold assuming an underground extraction scenario, a gold price of US$1,950/oz, metallurgical recovery of 95% and exchange rate of R$ 5.5/US$3D block model used for Resource estimates. Polygonal techniques were used for Resources estimates. Qualified Persons and Quality Control The scientific and technical information contained in this news release pertaining to the Palito Complex has been reviewed and approved by the following Qualified Persons under National Instrument 43-101 – Standards of Disclosure for Mineral Projects ('NI 43-101'): Carlos Guzman,RM CMC, FAusIMM, NCL Ingeniería y Construcción SpA Gustavo Tapia, RM CMC, Metallurgical and Process Consultant, GT Metallurgy Nicolas Fuster, RM CMC, MAusIMM, NCL Ingeniería y Construcción SpA The Qualified Persons have verified the information disclosed herein, including the sampling, preparation, security and analytical procedures underlying the information or opinions contained in this announcement in accordance with standards appropriate to their qualifications. Technical Report A Technical Report prepared by NCL Ingeniería y Construcción SpA. In accordance with NI 43-101 will be filed on SEDAR ( ) within 45 days of this release as well as on the Company's website About Serabi Gold plc Serabi Gold plc is a gold exploration, development and production company focused on the prolific Tapajós region in Para State, northern Brazil. The Company has consistently produced 30,000 to 40,000 ounces per year with the Palito Complex and is planning to double production in the coming years with the construction of the Coringa Gold project. Serabi Gold plc recently made a copper-gold porphyry discovery on its extensive exploration licence. The Company is headquartered in the United Kingdom with a secondary office in Toronto, Ontario, Canada. The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it forms part of UK Domestic Law by virtue of the European Union (Withdrawal) Act 2018. The person who arranged for the release of this announcement on behalf of the Company was Andrew Khov, Vice President, Investor Relations & Business Development. Enquiries SERABI GOLD plc Michael Hodgson t +44 (0)20 7246 6830 Chief Executive m +44 (0)7799 473621 Colm Howlin Chief Financial Officer m +353 89 6078171 Andrew Khov m +1 647 885 4874Vice President, Investor Relations & Business Development e [email protected] BEAUMONT CORNISH Limited Nominated Adviser & Financial Adviser Roland Cornish / Michael Cornish t +44 (0)20 7628 3396 PEEL HUNT LLP Joint UK Broker Ross Allister / Georgia Langoulant t +44 (0)20 7418 9000 TAMESIS PARTNERS LLP Joint UK Broker Charlie Bendon/ Richard Greenfield t +44 (0)20 3882 2868 CAMARCO Financial PR – Europe Gordon Poole / Emily Hall t +44 (0)20 3757 4980 Assay Results Assay results reported within this release include those provided by the Company's own on-site laboratory facilities at Palito and have not yet been independently verified. Serabi closely monitors the performance of its own facility against results from independent laboratory analysis for quality control purpose. As a matter of normal practice, the Company sends duplicate samples derived from a variety of the Company's activities to accredited laboratory facilities for independent verification. Since mid-2019, over 10,000 exploration drill core samples have been assayed at both the Palito laboratory and certified external laboratory, in most cases the ALS laboratory in Belo Horizonte, Brazil. When comparing significant assays with grades exceeding 1 g/t gold, comparison between Palito versus external results record an average over-estimation by the Palito laboratory of 6.7% over this period. Based on the results of this work, the Company's management are satisfied that the Company's own facility shows sufficiently good correlation with independent laboratory facilities for exploration drill samples. The Company would expect that in the preparation of any future independent Reserve/Resource statement undertaken in compliance with a recognized standard, the independent authors of such a statement would not use Palito assay results without sufficient duplicates from an appropriately certificated laboratory. Forward-looking statements Certain statements in this announcement are, or may be deemed to be, forward looking statements. Forward looking statements are identified by their use of terms and phrases such as ''believe'', ''could'', 'should' ''envisage'', ''estimate'', ''intend'', ''may'', ''plan'', ''will'' or the negative of those, variations or comparable expressions, including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors' current expectations and assumptions regarding the Company's future growth, results of operations, performance, future capital and other expenditures (including the amount, nature and sources of funding thereof), competitive advantages, business prospects and opportunities. Such forward looking statements reflect the Directors' current beliefs and assumptions and are based on information currently available to the Directors. Several factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions, competition, environmental and other regulatory changes, actions by governmental authorities, the availability of capital markets, reliance on key personnel, uninsured and underinsured losses and other factors, many of which are beyond the control of the Company. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions, the Company cannot assure investors that actual results will be consistent with such forward looking statements. Qualified Persons Statement The scientific and technical information contained within this announcement has been reviewed and approved by Michael Hodgson, a Director of the Company. Mr Hodgson is an Economic Geologist by training with over 30 years' experience in the mining industry. He holds a BSc (Hons) Geology, University of London, a MSc Mining Geology, University of Leicester and is a Fellow of the Institute of Materials, Minerals and Mining and a Chartered Engineer of the Engineering Council of UK, recognizing him as both a Qualified Person for the purposes of Canadian National Instrument 43-101 and by the AIM Guidance Note on Mining and Oil & Gas Companies dated June 2009. Notice Beaumont Cornish Limited, which is authorised and regulated in the United Kingdom by the Financial Conduct Authority, is acting as nominated adviser to the Company in relation to the matters referred herein. Beaumont Cornish Limited is acting exclusively for the Company and for no one else in relation to the matters described in this announcement and is not advising any other person and accordingly will not be responsible to anyone other than the Company for providing the protections afforded to clients of Beaumont Cornish Limited, or for providing advice in relation to the contents of this announcement or any matter referred to in it. Neither the Toronto Stock Exchange, nor any other securities regulatory authority, has approved or disapproved of the contents of this news release See for more information and follow us on X @Serabi_Gold APPENDIX Mineral Reserves and Resources The Company estimates and discloses mineral reserves and resources using the definitions adopted by the Canadian Institute of Mining, Metallurgy and Petroleum, and in accordance with NI 43-101. Further details are available at See the 'Glossary of Geological and Mining Terms' for complete definitions of mineral reserves and mineral resources. About Mineral Resources Mineral resources are not mineral reserves and do not have demonstrated economic viability but do have reasonable prospect for economic extraction. They fall into three categories: measured, indicated, and inferred. The reported mineral resources are stated inclusive of mineral reserves. Measured and indicated mineral resources are sufficiently well-defined to allow geological and grade continuity to be reasonably assumed and permit the application of technical and economic parameters in assessing the economic viability of the mineral resource. Inferred mineral resources are estimated on limited information not sufficient to verify geological and grade continuity or to allow technical and economic parameters to be applied. Inferred mineral resources are too speculative geologically to have economic considerations applied to them. There is no certainty that mineral resources of any category will be upgraded to mineral reserves. Important Information about Mineral Reserve and Resource Estimates Whilst the Company takes all reasonable care in the preparation and verification of the mineral reserve and resource figures, the figures are estimates based in part on forward-looking information. Estimates are based on management's knowledge, mining experience, analysis of drilling results, the quality of available data and management's best judgment. They are, however, imprecise by nature, may change over time, and include many variables and assumptions including geological interpretation, commodity prices and currency exchange rates, recovery rates, and operating and capital costs. There is no assurance that the indicated levels of metal will be produced, and the Company may have to re-estimate the mineral reserves based on actual production experience. Changes in the metal price, production costs or recovery rates could make it unprofitable to operate or develop a particular deposit for a period of time. A comparison of the updated Mineral Reserve Estimates as at 1 April 2025 with the previously reported Mineral Reserve Estimates as at 31 July 2023 published on 20 November 2023 is set out below. Comparison of Mineral Reserves for the Palito Mine, Para, Brazil April 2025 July 2023 Tonnes Grade Contained Tonnes Grade Contained (000's) (g/t Au) (000's oz) (000's) (g/t Au) (000's oz) Proven 422 7.7 103.8 568 8.1 147.5 Probable 224 6.0 43.1 197 6.8 43.2 Proven & Probable Reserves 646 7.1 147.0 765 7.8 190.7 A comparison of the updated Mineral Resource Estimates as at 1 April 2025 with the previously reported Mineral Resource Estimates as at 31 July 2023 published on 20 November 2023 is set out below. Comparison of Mineral Resources for the Palito Mine, Para, Brazil April 2025 July 2023 Tonnes Grade Contained Tonnes Grade Contained (000's) (g/t Au) (000's oz) (000's) (g/t Au) (000's oz) Measured Resources 769 10.8 268 772 11.0 274 Indicated Resources 333 7.7 83 243 8.4 66 Measured & Indicated Resources 1,102 9.9 350 1,015 10.4 339 Inferred Resources 682 7.4 162 674 7.0 152 GLOSSARY OF TERMS The following is a glossary of technical terms: 'Ag' means silver. 'Au' means gold. 'assay' in economic geology, means to analyse the proportions of metal in a rock or overburden sample; to test an ore or mineral for composition, purity, weight or other properties of commercial interest. 'CIM' means the Canadian Institute of Mining, Metallurgy and Petroleum. 'chalcopyrite' is a sulphide of copper and iron. 'Cu' means copper. 'cut-off grade' the lowest grade of mineralised material that qualifies as ore in a given deposit; rock of the lowest assay included in an ore estimate. 'dacite porphyry intrusive' a silica-rich igneous rock with larger phenocrysts (crystals) within a fine-grained matrixi 'deposit' is a mineralised body which has been physically delineated by sufficient drilling, trenching, and/or underground work, and found to contain a sufficient average grade of metal or metals to warrant further exploration and/or development expenditures; such a deposit does not qualify as a commercially mineable ore body or as containing ore reserves, until final legal, technical, and economic factors have been resolved. 'electromagnetics' is a geophysical technique tool measuring the magnetic field generated by subjecting the sub-surface to electrical currents. 'garimpo' is a local artisanal mining operation 'garimpeiro' is a local artisanal miner. 'geochemical' refers to geological information using measurements derived from chemical analysis. 'geophysical' refers to geological information using measurements derived from the use of magnetic and electrical readings. 'geophysical techniques' include the exploration of an area by exploiting differences in physical properties of different rock types. Geophysical methods include seismic, magnetic, gravity, induced polarisation and other techniques; geophysical surveys can be undertaken from the ground or from the air. 'gossan' is an iron-bearing weathered product that overlies a sulphide deposit. 'grade' is the concentration of mineral within the host rock typically quoted as grams per tonne (g/t), parts per million (ppm) or parts per billion (ppb). 'g/t' means grams per tonne. 'granodiorite' is an igneous intrusive rock similar to granite. 'hectare' or a 'ha' is a unit of measurement equal to 10,000 square metres. 'igneous' is a rock that has solidified from molten material or magma. 'IP' refers to induced polarisation, a geophysical technique whereby an electric current is induced into the sub-surface and the conductivity of the sub-surface is recorded. 'intrusive' is a body of rock that invades older rocks. 'Indicated Mineral Resource An Indicated Mineral Resource is that part of a Mineral Resource for which quantity, grade or quality, densities, shape and physical characteristics are estimated with sufficient confidence to allow the application of Modifying Factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Geological evidence is derived from adequately detailed and reliable exploration, sampling and testing and is sufficient to assume geological and grade or quality continuity between points of observation. An Indicated Mineral Resource has a lower level of confidence than that applying to a Measured Mineral Resource and may only be converted to a Probable Mineral Reserve. 'Inferred Mineral Resource' An Inferred Mineral Resource is that part of a Mineral Resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration. 'Measured Mineral Resource' A Measured Mineral Resource is that part of a Mineral Resource for which quantity, grade or quality, densities, shape, and physical characteristics are estimated with confidence sufficient to allow the application of Modifying Factors to support detailed mine planning and final evaluation of the economic viability of the deposit. Geological evidence is derived from detailed and reliable exploration, sampling and testing and is sufficient to confirm geological and grade or quality continuity between points of observation. A Measured Mineral Resource has a higher level of confidence than that applying to either an Indicated Mineral Resource or an Inferred Mineral Resource. It may be converted to a Proven Mineral Reserve or to a Probable Mineral Reserve. 'mineralisation' the concentration of metals and their chemical compounds within a body of rock. 'mineralised' refers to rock which contains minerals e.g. iron, copper, gold. 'Mineral Resource' A Mineral Resource is a concentration or occurrence of solid material of economic interest in or on the Earth's crust in such form, grade or quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade or quality, continuity and other geological characteristics of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge, including sampling. 'Mineral Reserve' A Mineral Reserve is the economically mineable part of a Measured and/or Indicated Mineral Resource. It includes diluting materials and allowances for losses, which may occur when the material is mined or extracted and is defined by studies at Pre-Feasibility or Feasibility level as appropriate that include application of Modifying Factors. Such studies demonstrate that, at the time of reporting, extraction could reasonably be justified. 'Mo-Bi-As-Te-W-Sn' Molybdenum-Bismuth-Arsenic-Tellurium-Tungsten-Tin 'monzogranite' a biotite rich granite, often part of the later-stage emplacement of a larger granite body. 'mt' means million tonnes. 'ore' means a metal or mineral or a combination of these of sufficient value as to quality and quantity to enable it to be mined at a profit. 'oxides' are near surface bed-rock which has been weathered and oxidised by long term exposure to the effects of water and air. 'ppm' means parts per million. 'Probable Mineral Reserve' is the economically mineable part of an Indicated and, in some circumstances, a Measured Mineral Resource demonstrated by at least a Preliminary Feasibility Study. This Study must include adequate information on mining, processing, metallurgical, economic, and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified. 'Proven Mineral Reserve' is the economically mineable part of a Measured Mineral Resource. A Proven Mineral Reserve implies a high degree of confidence in the Modifying Factors. 'saprolite' is a weathered or decomposed clay-rich rock. 'sulphide' refers to minerals consisting of a chemical combination of sulphur with a metal. 'vein' is a generic term to describe an occurrence of mineralised rock within an area of non-mineralised rock. 'VTEM' refers to versa time domain electromagnetic, a particular variant of time-domain electromagnetic geophysical survey to prospect for conductive bodies below surface. 'XRF' X-ray Fluorescence (XRF) is a spectrometric technique used to perform elemental analysis non-destructively on samples Disclaimer: The above press release comes to you under an arrangement with GlobeNewswire. Business Upturn takes no editorial responsibility for the same. Ahmedabad Plane Crash GlobeNewswire provides press release distribution services globally, with substantial operations in North America and Europe.


Business Wire
03-07-2025
- Business
- Business Wire
Spanish Mountain Gold Announces Larger Scale Preliminary Economic Assessment With a Base Case NPV5% After-Tax of C$1.0 Billion, 18.2 % IRR and 3.4 Year Payback at US$ 2,450/Oz Gold Price; at US$3,300/Oz Spot Gold Price NPV5% C$2.3 Billion, 32.0%...
VANCOUVER, British Columbia--(BUSINESS WIRE)-- Spanish Mountain Gold Announces Larger Scale Preliminary Economic Assessment With a Base Case NPV5% After-Tax of C$1.0 Billion, 18.2 % IRR and 3.4 Year Payback at US$ 2,450/Oz Gold Price; at US$3,300/Oz Spot Gold Price NPV5% C$2.3 Billion, 32.0% IRR and 2.0 Year Payback; Including an Updated Mineral Resource Estimate for Its Spanish Mountain Gold Project Spanish Mountain Gold Ltd. ('Spanish Mountain' or the 'Company') (TSX-V: SPA; FSE: S3Y; OTCQB: SPAUF) is pleased to announce the results of a Preliminary Economic Assessment (' PEA '), including an updated mineral resource estimate ('MRE'), for the Spanish Mountain Gold Project (the 'Project'), located within central British Columbia, Canada. The PEA is a conceptual study of the potential economic viability of the Main Deposit Mineral Resource, that includes the Main Zone and North Zone. The PEA will be published in an independent National Instrument ('NI') 43-101 Technical Report within 45 days of this news release and filed on SEDAR+. Once filed on SEDAR+, the PEA will supersede the Spanish Mountain Gold Project Prefeasibility Study ('NI') 43-101 Technical Report (PFS) dated May 31, 2021. The PEA study was commissioned by the Company and prepared by a consortium of consultants led by Ausenco Engineering Canada ULC (' Ausenco '). The PEA envisions a conventional open pit mining and milling operation with a projected 24.5-year life of mine ('LOM') producing 3 million ounces ('Moz') of payable gold, with a front weighted production profile and attractive economics. All currency amounts herein are in Canadian dollars unless otherwise indicated. President and CEO, Peter Mah stated: "The re-envisioned, larger scale Spanish Mountain Gold Project and the completion of a new robust, de-risked PEA with updated MRE marks a significant achievement for the Company's transformation from explorer to developer. With over 235,000 metres ('m') of drill information our confidence in the resource quality and proposed mine confirm our strategy to advance the Project towards feasibility and ultimately a build decision by 2027. Project upside is supported by drill success in 2024 to 2025 reinforcing the potential for new additional discoveries of high grade near surface gold mineralization in prospective gold host rocks over the 10 km long property wide corridor. With a regional setting of nearby experienced First Nations, communities, currently producing mines, a power interconnection point near William's Lake, B.C. that is progressing through Stage 2 of B.C. Hydro's system impact study, established mining infrastructure plus workforce, and year round paved road access to within 6 km of the Project site, the Project's favourable location and jurisdiction speak volumes to the Project's overall quality and likelihood to advance to production. Spanish Mountain's commitment to create BC based jobs, business opportunities, and sustainable shared benefits for the First Nation's and surrounding communities has been demonstrated during the 2024-25 drill programs. We've heard the First Nations' and communities' feedback regarding the environment and are pleased to have found a way to address those shared concerns to derisking tailings, waste, and water management. Considering the rising gold price environment supporting the need to rapidly advance gold projects in Canada, and alongside the amazing regional support we've received in British Columbia for the Project to date, we look forward to continuing to earn support for our Project, while conserving and improving the economic sustainable value for all stakeholders. Spanish Mountain Gold has a bright future ahead creating a new definition of responsible sustainable mining that generations of Canadians will be proud of!' Highlights Robust Economics: Base case after-tax NPV5% of C$1,025 million with an after-tax IRR of 18.2% using a gold price assumption of US$2,450/ounce ('oz'). Using a spot gold price of US$3,300/oz gold, after-tax NPV5% increases to C$2,315 million and the after-tax IRR to 32.0%. Significant Production and Low Cost: 203,265 oz average annual gold production in the first 5 years at an all-in sustaining cost net of by-product credits ('AISC') of US$1,024/oz and 122,041 oz average annual gold production over a 24.5-year LOM at an AISC of US$1,338/oz. Rapid Payback of Capital Expenditures: C$1,250 million initial capital paid back over 3.4 years at PEA base case and decreasing to 2.0 years at spot gold price of $3,300/oz gold. High Degree of Resource Confidence: Economic analysis is based on Measured and Indicated Resources sub-totalling 33.3% and 65.1% respectively or grand total of 98.4% but excludes potential upside opportunities from the 2025 drill results and MRE from the Phoenix deposit. Low Risk: Conventional open pit and milling operation with road access and hydro-electric power. New Innovative, De-risked Tailings Facility: Dry stack plus coarse free draining tailings, waste and water management facilities that are integrated and significantly reduce volume of tailings impacted runoff for treatment and discharge. The proposed tailings facility includes 100% reuse of process water, avoids discharge near the Cedar Point Provincial Park and minimizes the disturbance of fish bearing waters. The proposed tailings facility utilizes feedback obtained from the First Nations, nearby communities and industry to utilize best in class available environmental solutions that the Company anticipates will significantly reduce risks at closure and promote protection of the land and waterways to perpetuity. Significant Opportunities: Potential to further enhance Project economics and expand production rate have been identified with the addition of the maiden Phoenix deposit MRE, ongoing endowment potential extensions and preconcentration technologies such as mineralized material sorting to boost mill feed grade. Strong Discovery Growth Potential: Exploration diamond drill programs completed in 2024 and 2025 extended gold mineralization and intercepted higher-grade mineralization adjacent to Project infrastructure over a strike length in excess of 3 km. Table 1: PEA Results Summary Open Pit PEA Study Results 2025 PEA Base Case Spot Prices 1 After-Tax NPV (C$M, 5% discount rate) $1,025 $2,315 After-Tax IRR (%) 18.2% 32.0% Annual Average Free Cash Flow (C$M) 4 $85 $173 Annual Average Free Cash Flow Yr. 1-5 (C$M) 4 $311 $454 Initial Capex (C$M) $1,250 $1,250 Total Cash Cost (US$ / Au oz) 2 $1,194 $1,201 AISC (US$ / Au oz) 3 $1,338 $1,345 Payback Period (years) After-Tax 3.4 2.0 Nominal Processing Throughput (tpd) 26,000 26,000 Strip Ratio (waste:mill feed resource) 2:1 2:1 Mine Life (years) 24.5 24.5 Annual Average Throughput (Mtpa) 9,340 9,340 Annual Average Production (koz/a) 122 122 Average Gold Head Grade (g/t) 0.46 0.46 Average Gold Recovery (%) 89.3% 89.3% Metal Prices (US$ / oz) $2,450 Au $28.50 Ag $3,300 Au $36.00 Ag Exchange Rate USD/CAD 1.35 1.35 Total LOM Au ounces produced (Moz) 3.0 3.0 Total LOM Ag ounces produced (Moz) 2.1 2.1 Notes for Table 1 1. Spot price is based on the LBMA gold price as of the close of business on July 1, 2025, rounded down to the nearest $100/oz for gold and $1/oz for silver. 2. Cash Costs consist of mining costs, processing costs, mine-level G&A, offsite charges, and royalties less by-product credits. Refer to the 'Non-Gaap Financial Measures' section in Appendix B of this news release for more information. 3. All-In Sustaining Costs (AISC) includes cash costs plus sustaining capital, closure costs, and salvage credits. Refer to the 'Non-GAAP Financial Measures' section in Appendix B of this news release for more information. 4. Free cash flow is calculated as after tax cash flow from mine-site operating activities less capital expenditures, including closure costs (net of salvage value). Refer to the 'Non-GAAP Financial Measures' section in Appendix B of this news release for more information. Expand The economic analysis contained in this news release is preliminary in nature and is based primarily on Measured and Indicated Mineral Resources totalling 33.3% and 65.1% respectively, and in part, Inferred Mineral Resources totalling 1.6% of the proposed mill feed from the Main deposit. Inferred Mineral Resources are considered too geologically speculative to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves. There is no certainty that economic forecasts on which this PEA is based will be realized. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Table 2 lists the breakdown by resource category of the run of mine ('ROM') mill feed for the PEA life of mine plan. Table 2: ROM mill feed and ounces by resource category Mineral Resource Estimate for the Main Deposit Note: The Main Deposit is included in the financial modelling for the 2025 PEA. The updated MRE for the Main deposit is based on the amalgamation of what have been historically described as the Main Zone, North Zone, Slipper Zone, and K Zone, effective January 10, 2025, and it is reported at a 0.15 g/t gold cut-off (see Table 3). There is no certainty that Mineral Resources will be converted into Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Mineral Resources include Inferred Mineral Resources which have had insufficient work to classify them as Indicated Mineral Resources. It is uncertain but reasonably expected that Inferred Mineral Resources could be uplifted to Indicated Mineral Resources with additional drilling. Geological and resource domain modelling and estimation for the Project was completed using Leapfrog 2024.1. The lithological model was developed based on data from the extensive re-logging program of 170,000 m drill core that was completed in 2023 and 2024, in addition to geochemical classification of 56,550 previously sampled intervals. Mineralization domains are modelled by identifying zones with gold values greater than 0.3 g/t over a minimum width of 3 m. Two primary styles of mineralization were recognized. Early mineralization includes disseminated stratabound mineralization in argillite-bearing lithologies. Late mineralization includes gold associated with late-stage quartz veins. Three high-confidence faults were modelled, including the North Fault, South Fault, and Fault 1. The Main Block is bound by the North and South Faults, representing significant discontinuities in stratigraphy and mineralization. Within the Main Block, Fault 1 introduces a minor offset in the main block. Reasonable prospects for eventual economic extraction were evaluated by performing a pit optimization using the Lerchs-Grossman algorithm with the following parameters: gold price of US$2,400/oz, silver price of US$30/oz, and gold selling costs of C$7/oz for offsite charges, and a 1.5% royalty. Mining costs for mineralized material and waste are C$3.75/t, with incremental mining costs of C$0.03/t. Processing costs are C$12/t for mill processing and include site G&A. Payability for gold is 99.8%, and payability for silver is 90%. Process recovery for gold is 90%, while process recovery for silver is 50%. The exchange rate used is C$0.73 to US$1. Total Measured and Indicated Mineral Resources for the Main deposit includes 292.1 Mt at an average grade of 0.44 g/t gold and 0.66 g/t silver, for a total of 4.2 M contained ounces of gold and 6.2 M contained ounces of silver. Total Inferred Mineral Resources for the Main deposit includes 14.8 Mt at an average grade of 0.33 g/t gold and 0.95 g/t silver, for a total of 0.2 M ounces of gold and 0.5 M ounces of silver. Table 3: Mineral Resource for the Main deposit Category Cut-off Grade Tonnes (kt) Au Avg. Grade Au (koz) Ag Avg. Grade Ag (koz) Measured 0.15 77,370 0.53 1,321 0.68 1,701 Indicated 0.15 214,702 0.41 2,842 0.65 4,463 Measured & Indicated 0.15 292,072 0.44 4,163 0.66 6,163 Inferred 0.15 14,830 0.33 155 0.95 454 Notes for Table 3: 5. The qualified person responsible for the Main deposit MRE, with an effective as of as of January 10, 2025, is Bahram Bahrami, of Equity Exploration Consultants Ltd. 6. Mineral Resources are classified in accordance with CIM (2014) definition standards 7. Bulk density assigned on a block per block basis 8 . Mineral Resources are reported using a 0.15 g/t gold cut-off grade 9. Metal price assumptions include US$2,400/oz Au and US$30/oz Ag 10. Metallurgical recoveries assumptions are 90% recovery for gold and 50% for silver. 11. 99.8 payability for gold and 90% for silver 12. Numbers may not add due to rounding 13. Mineral resources are not Mineral reserves and do not have demonstrated economic viability. 14. The qualified persons responsible for this section of the technical report are not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors that could materially affect the Mineral Resource estimate other than those disclosed in this news release and in the PEA Technical Report. Expand Mineral Resource Estimate for the Phoenix Deposit Note: The Phoenix Deposit is not included in the financial modelling for the 2025 PEA. The inaugural MRE for the Phoenix deposit is reported at a 0.20 g/t gold cut-off. Total Indicated Mineral Resources for the Phoenix deposit include 0.05 Mt at an average grade of 0.35 g/t Au, for a total of 0.6 thousand ounces (koz) of contained gold. Inferred Mineral Resources include 25.4 Mt at an average grade of 0.44 g/t Au, for a total of 357 koz of contained gold (see Table 4). Table 4: Mineral Resources for the Phoenix deposit Notes for Tables 4 and 5: 1. The qualified person responsible for the Phoenix deposit MRE, with an effective as of as of June 17, 2025, is Bahram Bahrami, of Equity Exploration Consultants Ltd. 2. Mineral Resources are classified in accordance with CIM (2014) definition standards 3. Mineral Resources are reported using a 0.20 g/t gold cut-off grade 4. Metal price assumptions include US$2,400/oz Au 5. Metallurgical recoveries assumptions are 90% recovery for gold 6. 99.8 payability for gold 7. Numbers may not add due to rounding 8. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. 9. The qualified persons responsible for this section of the technical report are not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors that could materially affect the Mineral Resource estimate other than those disclosed in this news release and in the PEA Technical Report 10. Refer to Appendix C for the estimation methodology Expand Geological and resource modelling for the Phoenix deposit was completed using Leapfrog 2024.1 and Micromine Origin & Beyond 2025. The lithological model was developed based solely on geochemical classification, with six principal stratigraphic units identified: Upper Mafic Tuff, Upper Sedimentary Sequence, Lower Mafic Tuff, Intermediate Sedimentary Sequence, Intermediate Tuff, and Lower Sedimentary Sequence. These units generally dip gently to the northeast. A steeply dipping north-south trending fault divides the Phoenix deposit into eastern and western blocks. The eastern block contains the full stratigraphic sequence, while the western block includes only the two lowermost stratigraphic units found in the eastern block. Gold mineralization was modelled based on downhole structural data measured from oriented drill core. This interpretation includes identifying two principal sets of mineralized structures: flat to gently east-dipping and steeper northeast-dipping orientations. These define three mineralized lenses—two upper, gently dipping zones and a deeper, steeper-dipping zone. Capping values for the Phoenix deposit were determined using decile analysis and log-scaled probability plots of length-weighted gold assays. Outlier restrictions were applied to lithological domains during the second estimation pass, excluding samples above 0.2 g/t gold where search distances exceeded 30% of the variogram range. No outlier restrictions were applied to mineralized domains. A semi-hard boundary approach was applied to specific lithological contacts reflecting gradational contacts of lithological units. These included the Lower Mineralized Zone (Domain 630) with a distance threshold of 5 m, the Lower Mafic Tuff with 15 m, and the Lower Sedimentary unit with 50 m. This approach was used to reduce artefacts and better represent grade continuity in stratigraphically complex or sparsely drilled areas. The block model was constructed using a parent block size of 5m x 5m x 5m, with sub-blocks refined down to 1.25 m to accurately honor geological boundaries and minimum mining widths. Grade estimation was conducted using a combination of Ordinary Kriging (OK) and inverse distance cubed (ID3) methods. OK was used for all mineralized domains where variograms could be reliably modelled; ID3 was applied to other domains where variogram stability could not be achieved. Locally varying anisotropy (LVA) was applied within mineralized domains to reflect observed structural controls. Resource classification followed the CIM Definition Standards (2014) and was guided by geological confidence, data spacing, and estimation support. The current drilling density supports predominantly Inferred classification. These are supported by at least two drill holes within a spacing of ≤155 m. Indicated Mineral Resources are supported by drill hole spacing of ≤70 m with minimum of 3 drill holes used for estimation. Reasonable prospects for eventual economic extraction were applied by performing a resource pit optimization and applying the following parameters: a gold price of US$2,400/oz, gold selling costs of C$7/oz for offsite charges, a 1.5% royalty, Mining costs of C$3.75/t with incremental costs of C$0.03/t, and combined processing and site G&A costs of C$12/t. Gold payability was assumed to be at 99.8%, with a metallurgical recovery of 90%. The exchange rate used was C$0.73 to US$1.00. No by-product metals were included in the estimate. For Phoenix, a cutoff grade of 0.20 g/t gold is used due to limited metallurgical data compared to the Main deposit. This higher cut-off accounts for increased geological and metallurgical uncertainty for the Phoenix deposit. Cut-off sensitivities of the Phoenix deposit mineral resource are summarized in Table 5. Table 5: Mineral Resource for the Phoenix deposit at varying gold cut-off grades Notes: See Table 4 Spanish Mountain Project Consolidated Mineral Resources Total combined Mineral Resources for the Spanish Mountain Gold Project are summarized in Table 6. Total Measured and Indicated mineral resources include 292.1 Mt at 0.44 g/t gold for total 4.16 M contained gold ounces. Total inferred mineral resources include 40.3 Mt at 0.40 g/t gold for total 512 k contained gold ounces. Table 6: Consolidated Mineral Resources for the Spanish Mountain Gold Project Notes on Table 6: 1. The Mineral Resource for the Main Deposit is reported using a cut-off grade of 0.15 g/t Au, while the Phoenix Deposit uses a 0.20 g/t Au cut-off. 2. The Mineral Resources are constrained within an optimized pit shell generated using Lerchs–Grossman pit optimization based on a gold price of US$2,400/oz, 99.8% payability, 90% gold recovery, C$12/t processing and G&A, C$3.75/t mining for ore and waste, C$0.03/t incremental mining cost, 1.5% royalty, C$7/oz offsite charges, and an exchange rate of 0.73:1 (CAD:USD). 3. Mineral Resources are derived from resource statements for each deposit and area, prepared by Bahram Bahrami, a Qualified Person as defined under NI 43-101. 4. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. 5. The Mineral Resource estimate complies with NI 43-101 Standards of Disclosure for Mineral Projects (May 2016) and CIM Definition Standards for Mineral Resources and Mineral Reserves (May 2014). 6. Any discrepancies in totals are due to rounding. 7. The effective date of the Mineral Resource statement is January 10, 2025 for the Main Deposit and June 17, 2025 for the Phoenix Deposit. Expand Mining and Processing Open pit mine designs, mine production schedules and mine capital and operating costs have been developed for the Main deposit, at a scoping level of engineering. The mineral resources, including inferred resources, form the basis of the mine planning. The Phoenix deposit MRE are not included or considered as part of the mine plan. Open pit mining activities are designed for approximately 24.5 years of operation. Mine planning is based on large scale conventional drill/blast/load/haul open pit mining methods suited for the Project location and local site requirements. The subset of mineral resources contained within the designed open pits are summarized in Table 7, with a 0.2 g/t Au cut-off grade, and form the basis of the mine plan and production schedule, which is summarized in Figure 5. Table 7: PEA Mine Plan Production Summary Mill feed quantities and grades include estimates of mining dilution and recovery based on a 10 m selective block size and 2 m dilution skins applied to all waste contacts. This results in an addition of 16% dilution and 2% loss to the original resource block model. Figure 5: PEA Mine Production Schedule Summary Processing of the mill feed at 26,000 tpd (or 9.5 Mt per annum) is by means of a conventional process flowsheet including primary grinding, gravity concentration, flotation, and regrinding of the concentrate followed by cyanidation via a CIL circuit to produce doré. The process achieves an average overall LOM gold recovery of 89%. The average silver recovery as a by‐product of the milling process for the life of the Project is 44%. Non-Acid Generating ('NAG') tailings from the plant are dewatered by screening and filtering and conveyed to a dry stack tailings facility, where it will be spread and compacted in engineered lifts. All site water is managed through a separate water management pond that includes a water treatment plant for any water to be discharged during the LOM. The tailings storage facilities proposed for construction and development at Project are primarily based on utilization of filtered tailings technology for the base case scenario. Multiple tailings storage locations, designs, and technologies were analyzed to arrive at the preferred location and tailings technology. Initial Capital Costs The initial capital expenditures for the Project as estimated by Ausenco are summarized in Table 8 and the capital expenditures to be incurred after the start-up of operations are assigned to sustaining capital and are projected to be covered by operating cash-flows. Project contingencies have been added where applicable, excluding capitalized operating costs, which results in an overall contingency of $270.3M or 22.6% (excluding taxes). The Project will benefit from established infrastructure in central British Columbia, noting that the Project is approximately 100 km by road to the city of Williams Lake. Local infrastructure in Likely will further support the Project development. The estimated initial capital cost of $1,250 M is inclusive of applicable taxes. Notes on Table 8: 1. Direct process plant capital costs are based on benchmarking and not from engineering design. 2. Totals do not necessarily equal the sum of the components due to rounding adjustments; not all cost components are illustrated in this table. Expand Sustaining Capital Costs: Ausenco estimates the LOM sustaining capital for Project to be C$443 M, which is expected to be funded by operating cash flows. The sustaining capital estimate is primarily for the expansion of the tailing storage facility, mining fleet additions as total material movements increase with depth, and reclamation and closure. The PEA has assumed C$163 M in closure and reclamation costs. On Site Direct Operating Costs ('Opex') The estimated Opex for Project is US$15.33/t of mill feed – see Table 7. Ausenco and MMTS have estimated the Opex based on first-principles calculation, industry benchmarking, proprietary information and its professional experience. Table 9: On Site Operating Cost for Base Case Notes for Table 9: 1. Totals do not necessarily equal the sum of the components due to rounding adjustments; not all cost components are illustrated in this table. Expand Royalties There is a 1.0 to 1.5% Net Smelter Royalty ("NSR") payable to two royalty holders. These are the only royalties that apply to the current Mineral Resources as mill feed for the Project and has been incorporated into the economic analysis of the 2025 PEA. The Company plans to exercise its right to buydown the NSRs to 1.5% and 1% respectively, for a total buydown payment of $1 million as provided in the agreements. Infrastructure The major infrastructure items considered and costed in the PEA support a mining and milling operation that is expected to operate 24-hours per day, seven-days per week. The design of Project infrastructure has prioritized environmental protection, workforce safety, and operating efficiency while minimizing community impacts. The Project site will consist of the open pit mine and mining related workshops, a processing plant, waste rock and tailings stack, and support service infrastructure such as warehousing, offices and workshops. The Project site-wide water balance is positive for which water capture, treatment and discharge infrastructure has been allowed for and designed. The Project will draw water from within the property and contain process water and tailings within the water management pond and tailings stack, effectively. Water management and treatment has been included to treat both open pit dewatering and surface facilities run-off to required environmental discharge standards. The site will be supported by renewable electrical grid power through a new, 75 km long 230kV, transmission line constructed by the Company from site to a new switching station designated as SMM, which is currently being designed by BC Hydro, located near the McLeese Lake Capacitor station. The mine and process operations are supported by functional maintenance and administration infrastructure located on site as well as off-site locations for non-critical administrative functions. Select local access roads will be upgraded and maintained throughout the mine life. The proposed tailings storage method is placement of dewatered material containing both tailings and minor amounts of process water. The minor proportion of Potential Acid Generating ('PAG') tailings will be managed within a dedicated conventional tailings lined cell contained within the tailings stack. NAG waste rock, PAG waste rock and over burden will be split by type and placed in suitably designed facilities that will be designed for physical stability and collect and manage run-off from the waste rock storage facilities. All facilities are located near the open pit mine to maximize efficiencies and minimize impact, subject to condemnation drilling. Environmental and Community Matters All exploration permits with the Government of British Columbia are in good standing. During its recent 2024 to 2025 exploration drill programs, the Company has regularly engaged communities and pro-actively sought shared benefits opportunities with each local to regional businesses, contractors and workers. The Company recognizes and respects the First Nations asserted aboriginal rights and title in the Project area and looks forward to continuing meaningful engagement with each First Nation on our proposed next steps to advance the Project. The Company has continued baseline studies during the PEA on the climate and waterways. Further work is anticipated during the next stages of advancement due to the new vision proposed in the PEA for a larger scale operation and associated tailings, waste and water management facilities as compared to the 2021 PFS. Opportunities and Future Work Ausenco, the team of consultants, and the Company have identified several areas and opportunities that may provide significant costs savings and improved economics for the Project. Post-PEA the Company will embark on additional technical work and engineering studies to better position and further de-risk the Project, including but not limited to the following: Mining Optimization of the pit phasing and mine production schedule, especially as the Mineral Resource is modified through further exploration and infill drilling; Optimization of the open-pit design through collection of additional geotechnical information; Further work to increase confidence in the Mineral Resource and lead to the definition of a Mineral Reserve; Detailed equipment costing to determine potential discounts to list price for all major components, as well as review purchase versus leasing options for mining equipment; Further planned electrification of the mine fleet, specifically the mine hauling function, as cutting-edge technologies for battery and trolley operations become commercialized in the near future; and Back-filling of waste rock into the open pit. Milling and Metallurgy Additional metallurgical work to optimize results from geometallurgical domains and continue research on the optimum grind size, analyze recoveries of the gold and silver, and the effects of the higher grade coming from the mineral sorters on metal recoveries; Optimize reagents to reduce costs and improve metallurgy; Investigate the potential for a gold recovery circuit from a pyrite concentrate not currently in the PEA; and Ore sorting of low grade for expansion scenarios. Tailings Storage and Waste Rock Facilities Detailed analysis of tailings storage and waste rock storage facilities for an integrated waste management plan and design to optimize the management of mine-impacted runoff and associated collection and treatment costs; Phasing of tailings and water storage starter structures to reduce initial capex; Alternative water treatment solutions being considered to the included reverse osmosis that meet BC discharge regulations; and Whole tailings belt filtration options to dewater tails before placement. Other Construction camp location, and a trade-off study between at site accommodation versus daily commutes to the Project from local communities; Investigate regional quarry sites and quality of quarry material for construction purposes, notably the tailing storage facility; Water supply for the Project, and a trade-off study between a constructed reservoir with Project infrastructure or a water pipeline from a local source; and Addition of the 2025 drill results and Phoenix maiden resource. Changes to the conceptual mine plan and mine design that may be recommended in the PEA study, if approved and implemented as the Project moves forward, could impact the capital and operating costs, profitability and cash flows and an eventual timeline to production, the impact of which cannot be quantified at this time. As a result, there are additional uncertainties with respect to the size and grade of the Mineral Resources that may become Mineral Reserves in the future, and that will serve as the basis for future studies. In addition, the Company will continue to conduct exploration activities within the 11,633-hectare ('ha') SMG mineral claims property which encompasses the estimated MRE, which the PEA is based upon. The objective of continuing regional exploration is to develop and assess targets that could further maximize the Company's flexibility with respect to future development decisions on the Project. Additional Considerations Related to the PEA Investors should be cautioned that there is no guarantee that the future construction and development of the Project that will be completed in accordance with the 2025 PEA results set forward in this news release. There is no certainty that production will begin, or that operating capital, or that financial results will be consistent with the 2025 PEA. Technical Information and Quality Control & Quality Assurance ('QAQC') Once received from the drill and processed, all drill core samples were sawn in half, labeled, and bagged. The remaining half of the drill core was securely stored on-site. Numbered security tags were applied to sample shipments to ensure chain of custody compliance. The Company inserts quality control (QC) samples at regular intervals, including blanks and reference materials, for all sample shipments to monitor laboratory performance. Standards and blanks account for a minimum of 15% of the samples in addition to the laboratory's internal quality assurance programs. The QAQC program was overseen by the Company's Qualified Person, Julian Manco, Director of Exploration (as described below). Drill core samples from the 2025 drill program were submitted to MSALABS' analytical facility in Prince George, British Columbia, for sample preparation and PhotonAssay TM analysis. The MSALABS facilities are accredited to the International Standards ISO/IEC 17025 and ISO 9001 standard for gold and multi-element assays, with all analytical methods incorporating quality control materials at defined frequencies and established data acceptance criteria. MSALABS Inc. is independent of the Company. Details on the historical assay work before 2025 will be included in the 43-101 Technical Report to be published within 45 days. PhotonAssay TM The PhotonAssay TM method utilizes gamma ray analysis for gold detection using the Chrysos PhotonAssay TM instrument (PA1408X). This non-destructive, fully automated technique offers high accuracy for analyzing crushed core and pulps. Sample preparation begins with drying and crushing up to 1 kg of material to achieve at least 70% passing through a 2-millimetre (mm) sieve. The sample is then riffle split to obtain a suitable aliquot for 2 testing cycles (MSALABS Method CPA-Au1). The PhotonAssay TM instrument bombards 400 to 600-gram samples contained in sealed containers with gamma rays. These containers remain sealed throughout the process, preserving the sample for potential further testing. The analysis is performed robotically, with results that integrate into existing laboratory management systems. Each sample is accompanied by a reference disc traceable to a Certified Reference Material (CRM). Both the sample and reference disc undergo gamma ray exposure, with signals detected and analyzed to ensure accurate and reliable results. The method offers a gold detection range from 0.015 parts per million (ppm - lower limit) to 10,000 ppm (upper limit). Quality control includes the use of reference materials and blanks, with all results reviewed by a competent person before reporting. Spanish Mountain Gold implemented two QAQC methodologies to validate the accuracy of PhotonAssay TM results, both demonstrating good comparability: 1) comparative analysis of diverse mineralization styles using Total Au screen metallic methods with both FAS-415 (gravimetric finish) and FAS-211 (AAS finish), and 2) comprehensive testing of both sample aliquots and rejects using FAS-211 (AAS finish). QAQC Testing typically can include the following spot checks: 1) Pulverizing tests to evaluate variability in sample preparation, 2) Cross-analysis at external laboratories using screen metallic method, and 3) Four-cycle radiation testing to identify and calibrate potential variability in gold results with variable radiation intensity. To effectively manage the nugget effect on high-grade gold samples MSALABS tested samples to "extinction" (CPA-Au1E method). This approach divides samples into multiple splits, analyzes each separately using PhotonAssay TM, and then calculates a weighted average of the results. By testing various portions of the sample independently and combining their values proportionally, this method provides significantly more representative gold values than traditional single-split analysis for samples with a large nugget effect. Multi-Elemental Analysis For the 2025 drilling campaign Spanish Mountain Gold used IMS-230 method to provide multi-element determination using a four-acid digestion followed by ICP-OES and ICP-MS analysis. Key Process Steps: Sample Preparation: Samples are dried and ground to specific criteria (85% passing 75 microns (μm) for rocks and drill core; 180μm for soils and sediments). A homogeneous 10-gram sample is required. Digestion: Samples undergo sequential digestion with nitric, perchloric, hydrofluoric, and hydrochloric acids, followed by dilution with deionized water. Analysis: The solution is analyzed via ICP-OES and ICP-MS for multi-element quantification. Quality Control: The process includes reference materials, blanks, and duplicates, with corrections for spectral interferences and thorough review before final reporting. Qualified Persons Various consultants provided input and helped write the forthcoming PEA Technical Report. Consultants that are responsible for elements of the Technical Report are independent qualified persons ('QP') as defined within NI 43-101. Geology: Ron Voordouw, Equity Exploration Mineral Resource for Main Deposit: Bahram Bahrami, Equity Exploration Mineral Resource for Phoenix Deposit: Bahram Bahrami, Equity Exploration Metallurgy, Processing, Infrastructure, and Economic Evaluation: Kevin Murray, Ausenco Mining: Marc Schulte, Moose Mountain Technical Services Tailings and Water Management: Brad Russell, BGC Water Treatment: Lee Josslyn, PE, Linkan Engineering Geochemistry: Andrea Samuels, pHase Geochemistry Off-site Power and Electrical: Neil Brazier, WN Brazier Associates Environmental & Community: James Millard, Ausenco The QPs have reviewed the information in this news release that pertain to the sections of the forthcoming PEA Technical Report for which they are responsible. All scientific and technical information in this press release in respect of the PEA is based on information prepared by or under the supervision of those individuals. The Mineral Resource estimate in this news release has been classified in accordance with CIM Definition Standards – For Mineral Resources and Mineral Reserves (May 14, 2014) and CIM Estimation of Mineral Resources & Mineral Reserves Best Practice Guidelines (November 29, 2019). In accordance with NI 43-101, the PEA Technical Report will be filed on SEDAR within 45 days of the disclosure of this news release. Julian Manco, Director of Exploration with Spanish Mountain Gold, is the Qualified Person as defined under National Instrument 43-101 who has reviewed and has approved the contents of this news release. About the Company Spanish Mountain Gold Ltd. is focused on advancing its 100%-owned Spanish Mountain Gold Project (Project) towards construction of the next gold mine in the Cariboo Gold Corridor, British Columbia. The Company will publish, within 45 days of this news release, a new NI 43-101 Technical Report setting out the new executable vision to advance the Project. This new NI 43-101 Technical Report, with a de-risked and optimized Preliminary Economic Assessment (PEA) with an updated Mineral Resource Estimate (MRE), will supersede the prior technical report of the Company. Upon receipt of the new PEA and updated MRE, the Company will decide the next steps to advance the Project to position the Company to make a construction decision in or before 2027. We are striving to be a leader in community and Indigenous relations by leveraging technology and innovation to build the 'greenest' gold mine in Canada. The Relentless Pursuit for Better Gold means seeking new ways to achieve optimal financial outcomes that are safer, minimize environmental impact and create meaningful sustainability for communities. Details of the Company are available on and on the Company's website: Cautionary Statement on Mineral Resource Estimates All Mineral Resource estimates of the Company disclosed or referenced in this news release have been prepared in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Definition Standards on Mineral Resources and Mineral Reserves dated May 10, 2014 ("2014 CIM Definition Standards"), whose definitions are incorporated by reference in National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101"): Mineral resource: is a concentration or occurrence of material of economic interest in or on the earth's crust in such form, grade or quality, and quantity that there are reasonable prospects for economic extraction. A mineral resource is a reasonable estimate of mineralization, taking into account relevant factors such as cut-off grade, likely mining dimensions, location or continuity, that, with the assumed and justifiable technical and economic conditions, is likely to, in whole or in part, become economically extractable. Inferred mineral resource: is that part of a mineral resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. An inferred mineral resource has a lower level of confidence than that applying to an indicated mineral resource and must not be converted to a mineral reserve. It is reasonably expected that the majority of inferred mineral resources could be upgraded to indicated mineral resources with continued exploration. Indicated mineral resource: that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics can be estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough for geological and grade continuity to be reasonably assumed. An indicated mineral resource has a lower level of confidence than that applying to a measured mineral resource and may only be converted to a probable mineral reserve. Measured mineral resource: that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics are so well established that they can be estimated with confidence sufficient to allow the appropriate application of technical and economic parameters to support production planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to confirm both geological and grade continuity. A measured mineral resource has a higher level of confidence than that applying to either an indicated mineral resource or an inferred mineral resource. It may be converted to a proven mineral reserve or to a probable mineral reserve. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. FORWARD-LOOKING INFORMATION: Certain of the statements and information in this press release constitute "forward-looking information". Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects", "anticipates", "believes", "plans", "estimates", "intends", "targets", "goals", "forecasts", "objectives", "potential" or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be considered forward-looking information. The Company's forward-looking information is based on the assumptions, beliefs, expectations and opinions of management as of the date of this press release and include but are not limited to information with respect to, the potential to extend mineralization within the near-surface environment; the potential to expand resources and to find higher-grade mineralization at depth; the timing, size and budget of a winter drill program, and the results thereof; and the delivery of a maiden resource for the Phoenix Deposit within the Phoenix Target, and the timing and results thereof. Other than as required by applicable securities laws, the Company does not assume any obligation to update forward-looking information if circumstances or management's assumptions, beliefs, expectations or opinions should change, or changes in any other events affecting such statements or information. For the reasons set forth above, investors should not place undue reliance on forward-looking information. APPENDIX A Key PEA Improvements and Optimizations vs. 2021 PFS The 2025 PEA incorporates several important improvements and de-risking initiatives compared to the 2021 Prefeasibility Study, all of which better positions the Project for a successful next phase of development. Notable changes include: Larger Project Scale: The project has increased the production rate from 20 ktpd to 26 ktpd, which increases the LOM average gold production profile by 19% to 122 koz per year, and 203 koz per year in the first five years. For the project, this will bring greater efficiency, lower unit costs, and uplift to the NPV, in addition to expanding Life of Mine (LOM) to 24.5 years and total gold production to 3.0Moz. Pre-concentration of mill feed to uplift feed grade to the proposed 26 ktpd mill such as mineralized material sorting was investigated during the PEA. It was identified as a target case opportunity to 'bolt-on' to the base case which will be further assessed during the next stages of project development. Improved Flowsheet Design: Updated metallurgical studies and testing has resulted in modification to a coarse mill feed floatation circuit with cleaner and scavenger stages and two gravity circuits, lowering power costs while boosting throughput These circuit modifications, when combined with a rougher and cleaner flotation circuit, resulted in overall project gold recovery of 89.3% with approximately 20% of gold expected to be recovered by gravity. Optimized Open Pit Mine Design: Through targeting lower strip ratios based upon improved geotechnical assessments, additional resource included in the mine plan and better stockpile management, an optimum open pit was selected to maximize efficiency. A selective mining unit (SMU) analysis was completed on bench mining dimensions, block model block sizes and equipment sizing, selection concluding that larger 240 t class trucks and associated fleet are optimal for the project. This also means higher productivities and less cost moving material to either the process plant or waste rock pads are possible. The LOM waste to resource strip ratio reduces to 2:1 in the PEA from 4:1 in the PFS. Electrification: The future electrification of the mine and equipment is expected to increase productivity with a significantly lower carbon intensity. The upsized power from 30 MW in the PFS to 60 MW included in the PEA is expected to potentially support the future electrification of the mine fleet and equipment. Equipment proposed in the PEA includes renewable diesel capable haul trucks and electrification of drills and shovels. New Tailings Stack: With coarser sized tailings material from coarse mill feed floatation, screening and filtered tailings, dewatering and placement of landforms has been selected. This is expected to result in improved geotechnical stability and enabling a safer site. This Tailings Stack location avoids the large Cedar Creek water catchment. As well, moving from a conventional slurry containment to a free draining, filtered tails means this coarser product minimizes borrow pit and starter dyke construction costs, meaning more placement flexibility and reduced starter material costs while lowering the potential for mineral endowment sterilization. Mineral Resource Estimate: Constrained geological interpretation and estimation methodology resulted in a decrease of the Main deposit Indicated and Inferred contained gold ounces. The decrease of Inferred total contained gold ounces of the Main deposit are partially offset by an increase of Inferred contained gold ounces of the Phoenix deposit. The Main deposit and Phoenix deposit show potential for resource expansion and classification uplift. APPENDIX B Proposed site layout General End Notes (excluding tables) In this news release the Company uses certain abbreviations, including: net present value ("NPV"); NPV at a 5% discount rate ("NPV5%"); internal rate of return ("IRR"); measured and indicated ("M&I"); million ("m"); thousand ("k"); metric tonne ("t"); troy ounce ("oz"); grams per tonne ("g/t"); gold ("Au"); silver ("Ag"); life of mine ("LOM"); tonnes per day ("tpd"); free cash flow ("FCF"); years ("yrs"); per annum ("pa"); average ("avg."); life-of-mine ("LOM"); versus ("vs."); non acid generating ('NAG'); potentially acid generating ('PAG'). Payback is calculated from commercial production, which is defined as the achievement of reaching a minimum of 30 consecutive days of operations during which the mill operated at an average of 60% of nameplate throughput of 26,000 tpd. Spot price is based on the LBMA gold price as of the close of business on July 1, 2025, rounded down to the nearest $100/oz for gold and $1/oz for silver. USE OF NON-GAAP MEASURES Certain financial measures referred to in this news release are not measures recognized under IFRS and are referred to as non-GAAP financial measures or ratios. These measures have no standardized meaning under IFRS and may not be comparable to similar measures presented by other companies. The definitions established and calculations performed by Ausenco are based on the QP's reasonable judgement and are consistently applied. These measures are intended to provide additional information and should not be considered in isolation or as a substitute for measures prepared in accordance with IFRS. The non-GAAP financial measures used in this news release and common to the gold mining industry are cash costs and all-in sustaining cost per ounce of gold produced and free cash flow. Free cash flow, Cash costs, and All-in sustaining cost per ounce of gold sold are non-GAAP financial measures or ratios and have no standardized meaning under IFRS Accounting Standards ('IFRS') and may not be comparable to similar measures used by other issuers. As the Company is not in production, the Company does not have historical non-GAAP financial measures nor historical comparable measures under IFRS, and therefore the foregoing prospective non-GAAP financial measures or ratios may not be reconciled to the nearest comparable measures under IFRS. Cash Costs consist of mining costs, processing costs, mine-level G&A, offsite charges, and royalties less by-product credits. All-In Sustaining Costs (AISC) includes cash costs plus sustaining capital, closure costs, and salvage credits. Free cash flow is calculated as after-tax cash flow from mine-site operating activities less capital expenditures, including closure costs (net of salvage value). APPENDIX C The estimation methodology for the Main Deposit is similar to Phoenix Deposit except for: (1) outlier restrictions for the lithology domains use higher gold thresholds (3 g/t vs 0.2 g/t) with different search distance criteria (20-33% vs 30% of range); (2) boundary treatment applies semi-hard boundaries with uniform thresholds (15-25m) to lithological domains while mineralized domains used hard boundaries for initial passes, whereas Phoenix applied semi-hard boundaries to specific lithological contacts with variable thresholds (5-50m); (3) grade estimation uses exclusively ID3 interpolation instead of the hybrid OK/ID3 approach; (4) resource classification employs more stringent drill hole spacing requirements (≤30m/≤70m/≤138m vs ≤70m/≤155m) and incorporates Sequential Gaussian simulation for statistical validation; and (5) includes Measured resource classification not reported for the Phoenix Deposit.