logo
#

Latest news with #AdityaBirlaRenewables

KPIG Energia secures LoA for solar project from Aditya Birla Renewables
KPIG Energia secures LoA for solar project from Aditya Birla Renewables

Business Standard

time06-08-2025

  • Business
  • Business Standard

KPIG Energia secures LoA for solar project from Aditya Birla Renewables

KPIG Energia, a wholly owned subsidiary of KPI Green Energy, has received a Letter of Award (LOA) from Aditya Birla Renewables (ABRL) for 64 MWac / 96 MWp Solar Balance of System (BoS) Power Plant at Mahua, Gujarat. The scope of work includes Design, Engineering, procurement, supply, loading, unloading, transportation, arranging comprehensive insurance, erection, testing, synchronization, achieving Commissioning by the Schedule Commercial Operation (CoD), conducting performance acceptance test (PAT) and facility acceptance test (FAT) for Solar Project.

KPI Green Energy bags project for 96 MW solar power component from Aditya Birla Renewables
KPI Green Energy bags project for 96 MW solar power component from Aditya Birla Renewables

Time of India

time06-08-2025

  • Business
  • Time of India

KPI Green Energy bags project for 96 MW solar power component from Aditya Birla Renewables

KPI Green Energy on Wednesday announced securing an order from Aditya Birla Renewables for a 96 megawatt peak (MWp) solar balance-of-system project in Gujarat. In renewable energy, balance-of-system (BOS) refers to devices used for moving direct current (DC) through solar PV panels and converting into alternate current (AC) to ensure efficient power supply. "Wholly-owned subsidiary KPIG Energia Private Limited has received a Letter of Award (LOA) from Aditya Birla Renewables Limited (ABRL) for 64 MWac/ 96 MWp Solar Balance of System (BoS) power plant at Mahua," KPI Green Energy said. The scope of work includes design, engineering, procurement, supply, loading, unloading, transportation, arranging comprehensive insurance, erection, testing, synchronization, and commissioning by the schedule commercial operation (CoD), the company said. KPI Green Energy did not share any further details related to the project including its value and period of execution.

KPI Green Energy bags project for 96 MW solar power component from Aditya Birla Renewables
KPI Green Energy bags project for 96 MW solar power component from Aditya Birla Renewables

Time of India

time06-08-2025

  • Business
  • Time of India

KPI Green Energy bags project for 96 MW solar power component from Aditya Birla Renewables

KPI Green Energy on Wednesday announced securing an order from Aditya Birla Renewables for a 96 megawatt peak (MWp) solar balance-of-system project in Gujarat. In renewable energy, balance-of-system (BOS) refers to devices used for moving direct current (DC) through solar PV panels and converting into alternate current (AC) to ensure efficient power supply. Productivity Tool Zero to Hero in Microsoft Excel: Complete Excel guide By Metla Sudha Sekhar View Program Finance Introduction to Technical Analysis & Candlestick Theory By Dinesh Nagpal View Program Finance Financial Literacy i e Lets Crack the Billionaire Code By CA Rahul Gupta View Program Digital Marketing Digital Marketing Masterclass by Neil Patel By Neil Patel View Program Finance Technical Analysis Demystified- A Complete Guide to Trading By Kunal Patel View Program Productivity Tool Excel Essentials to Expert: Your Complete Guide By Study at home View Program Artificial Intelligence AI For Business Professionals Batch 2 By Ansh Mehra View Program "Wholly-owned subsidiary KPIG Energia Private Limited has received a Letter of Award (LOA) from Aditya Birla Renewables Limited (ABRL) for 64 MWac/ 96 MWp Solar Balance of System (BoS) power plant at Mahua," KPI Green Energy said. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Brain tumor has left my son feeling miserable; please help! Donate For Health Donate Now The scope of work includes design, engineering, procurement, supply, loading, unloading, transportation, arranging comprehensive insurance, erection, testing, synchronization, and commissioning by the schedule commercial operation (CoD), the company said. KPI Green Energy did not share any further details related to the project including its value and period of execution.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store