Latest news with #AgartalaExpress


Hindustan Times
5 days ago
- Climate
- Hindustan Times
Train services hit in parts of southern Assam due to heavy rainfall
Guwahati, Train services in parts of southern Assam have been affected due to rising water level at tracks and waterlogging at washing pits, particularly in Silchar, a Northeast Frontier Railway spokesperson said on Wednesday. Heavy rainfall and landslides have posed threat to the Badarpur-Lumding hill section which connects Barak valley to the rest of the country, though rail movement has not been snapped with on-ground staff and technology being deployed to ensure the tracks remain clear, another NFR official said. In view of rising water level at railway tracks and waterlogging at Silchar washing pits, train services over certain sections of NFR have been affected, the spokesperson said in a statement. "As a result, few trains have been cancelled, short terminated/originated or rescheduled," he added. The Badarpur-Dullabcherra, Dullabcherra – Badarpur, Silchar – Dullabcherra, and Agartala –Dharmanagar passenger trains have been cancelled for the day. The Dullabcherra – Silchar and Dharmanagar– Agartala passenger trains will remain cancelled on Thursday, the spokesperson said. The Bairabi–Silchar– Bairabi Express, commencing journey on Wednesday, will be short terminated at Katakhal Junction, and remain cancelled between Katakhal Junction and Silchar. The Agartala-Arunachal–Agartala Express, commencing journey on Wednesday, will be short terminated at Badarpur, and remain cancelled between Badarpur and Arunachal. The Silchar – Guwahati Express, commencing journey on Wednesday, will be short originated from Badarpur, and will remain cancelled between Silchar and Badarpur, the spokesperson added. Another NFR official said that water from the Barak river, which flows close to Silchar railway station, has entered parts of the station, rendering difficulties in normal operations. He said as the washing pits are inundated, the maintenance of the trains parked there has not been possible and it has led to cancellation or rescheduling of some trains. Regarding the Badarpur-Lumding hill section, he said small landslides, incidents of boulders blocking tracks, etc. have been reported over the last few days. "But our personnel are working round-the-clock and clearing the tracks. Some short-distance passenger trains have been cancelled but no long-distance train has been cancelled so far. We are ensuring movement with some time and speed adjustments to minimise problems for the passenger," the official added. Recognising the challenges posed by the North East region's complex terrain and severe weather conditions, NFR has intensified its monitoring and maintenance activities to ensure passenger safety and infrastructure integrity since last week, an official statement said. Stationary watchmen have been deployed at all vulnerable locations, with particular emphasis on critical sections such as Badarpur-Lumding hill section and various locations in Tripura. Regular patrolling is being conducted and senior officials, including the additional general manager and divisional railway managers of NFR, are supervising the situation continuously. Trolley patrolling is being carried out by officers to ensure close monitoring and regular inspections are being undertaken. NFR has also adopted technological initiatives to address its risks associated with landslides, drainage issues and embankment stability. These include drone-based LiDAR , high-resolution aerial imaging and electromagnetic surveys over an 80-km stretch of the Badarpur-Lumding hill section. Terrestrial Laser Scanning has been introduced at critical points to enhance tunnel safety and structural monitoring during peak rainfall periods, the statement added.


Time of India
7 days ago
- Business
- Time of India
Now, Vande Bharat to connect Bhopal with Patna & Lucknow
Bhopal: Two new Vande Bharat train services are likely to commence operations from Rani Kamlapati railway station (RKMP) to Patna and Lucknow, significantly reducing travel time between these destinations. Tired of too many ads? go ad free now Bhopal railway division officials said that the service will enhance connectivity between the capital cities of Madhya Pradesh, Bihar and Uttar Pradesh, offering improved interstate travel facilities. The Patna-bound Vande Bharat service will be allocated to Patna railway division. Both Bhopal and Patna railway divisions are to finalise operational arrangements. Schedule and pricing details will be announced after service allocation. RKMP and Patna are separated by roughly 1005 km. While existing services like Agartala Express and other superfast trains require 18 to 20 hours, the semi-high speed Vande Bharat, travelling at up to 160 kmph, will complete this journey in 12 to 13 hours. Currently, direct rail connections from Bhopal and RKMP to Patna are restricted to Agartala Express and Saharsa Weekly Express. Passengers travelling to Bihar must use multiple connections on other services. The additional Vande Bharat service will address issues of long waiting times and queues. Passengers will benefit from direct, comfortable, and swift transportation, enhancing their travel experience. The Railway Board's allocation is expected shortly, with services likely to begin within two months. The Bhopal division completed all required operational preparations. The Vande Bharat Express linking Bhopal and Lucknow will reduce journey duration to 6-8 hours from the present 10-12 hours. The train comprises eight coaches, offering AC chair car and executive class accommodation. The service incorporates the Kavach Protection System for safety and consumes 25% less electricity. Presently, over 10 trains operate between these cities via indirect routes, taking 10-12 hours. The new Vande Bharat Express will decrease travel time and efficiently handle passenger traffic