#Latest news with #EntoseBloomberg2 days agoBusinessBloombergSpain's Grid Denies Report It Mishandled Voltage Before BlackoutSpanish grid operator Red Electrica denies it took any action that was out of the ordinary in the minutes before a blackout hit the country on April 28. Red Electrica says it operated the power cable connected to France in line with protocol, in a statement. The grid operator says a full report hasn't been published by the group Entose even though it was cited by local newspaper El Economista.
Bloomberg2 days agoBusinessBloombergSpain's Grid Denies Report It Mishandled Voltage Before BlackoutSpanish grid operator Red Electrica denies it took any action that was out of the ordinary in the minutes before a blackout hit the country on April 28. Red Electrica says it operated the power cable connected to France in line with protocol, in a statement. The grid operator says a full report hasn't been published by the group Entose even though it was cited by local newspaper El Economista.