2 days ago
Glen Oaks Boulevard to start construction
SIOUX CITY, Iowa (KCAU) — The City of Sioux City Engineering Division announced the start of a new construction project, Glen Oaks Boulevard Paving Project – Tenton Trace to Outer Drive.
The plan is to start construction on or around June 16 and be finished in October 2025. According to the press release, 'The project includes the replacement of paving, driveway approaches, sidewalk ramps, and utilities (storm sewer intakes and sanitary sewer manholes) along Glen Oaks Boulevard from Tenton Trace to Outer Drive.'
Story continues below
Top Story: 185th Air Refueling Wing welcomes new Commander with ceremony
Lights & Sirens: Man denied new trial, sentenced for deadly rollover near Salix
Sports: West Sioux boys soccer wins first-ever IHSAA State title with 2-1 OT win
Weather: Get the latest weather forecast here
This project is anticipated to take place through three stages, with each stage taking one to two months to complete. Those stages are one, two, and three, respectively: Tenton Trace to Choctaw Court, Choctaw Court to Aztec Circle, and Aztec Circle to Outer Drive.
While the project is being worked on, a detour route will be available using Indian Hills Drive, Cheyenne Boulevard, and Outer Drive. The City will post the specific detours as they become needed.
Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.