logo
#

Latest news with #NTPCRenewableEnergyLimited

NTPC REL inks pact with Goa govt to develop 300 MW renewable projects
NTPC REL inks pact with Goa govt to develop 300 MW renewable projects

Time of India

time20-07-2025

  • Business
  • Time of India

NTPC REL inks pact with Goa govt to develop 300 MW renewable projects

NTPC Renewable Energy Limited ( NTPC REL ) has signed an agreement with the Goa government to develop 300 MW of renewable projects in the state. NTPC REL has signed a memorandum of understanding (MoU) with the Goa Energy Development Agency (GEDA) for the development of 300 MW or more renewable energy projects with/without energy storage in the state. The MoU was exchanged on July 18 between Gauresh Ashok Pilgaonkar , Managing Director (GEDA) and Pushpendra Tyagi , CFO (NTPC REL), in the presence of Goa Chief Minister Pramod Sawant and other senior officials. GEDA is a State Nodal Agency for the implementation of the Rooftop Solar Subsidy scheme in Goa.

NTPC REL adds 97.5 MW capacity at Khavda solar projects in Gujarat
NTPC REL adds 97.5 MW capacity at Khavda solar projects in Gujarat

Time of India

time01-07-2025

  • Business
  • Time of India

NTPC REL adds 97.5 MW capacity at Khavda solar projects in Gujarat

New Delhi: NTPC Renewable Energy Limited (NTPC REL), a wholly owned subsidiary of NTPC Green Energy Limited , has declared commercial operation of a total of 97.5 MW additional solar capacity across two projects in Khavda, Gujarat, from 00:00 hours on June 30, 2025. According to an official release, a 32.8 MW capacity (Second Part) of the 300 MW Khavda Solar Energy Project under the 450 MW Hybrid Tranche-V scheme was declared commercially operational. The First Part of this project, comprising 142.2 MW, was made operational on June 28, 2025. Simultaneously, NTPC REL commissioned 64.7 MW capacity (Third Part) of the 1255 MW Khavda-I Solar PV Project, being developed under the CPSU Scheme Phase-II, Tranche-III. The First and Second Parts of 110.25 MW and 146.7 MW, respectively, were declared commercially operational earlier on June 6 and June 28, 2025. The projects are part of NTPC REL's solar development portfolio at Khavda, Bhuj, in Gujarat. The company is executing large-scale solar projects as part of India's national renewable energy expansion programmes. NTPC REL is undertaking solar installations under government schemes including the CPSU and Hybrid initiatives aimed at boosting domestic renewable capacity.

NTPC Green Energy share price edges higher despite weak bias in Indian stock market; here's why
NTPC Green Energy share price edges higher despite weak bias in Indian stock market; here's why

Mint

time30-06-2025

  • Business
  • Mint

NTPC Green Energy share price edges higher despite weak bias in Indian stock market; here's why

NTPC Green Energy share price rose less than a per cent in Monday's trading session despite weak market sentiments on June 30. The stock opened at ₹ 107.21 apiece on Monday, as compared to previous close of ₹ 105.93. NTPC Green shares have witnessed significant fall over 12 per cent in last one year and nearly 17 per cent in six months. NTPC Green Energy shares gained after the company said that it has successfully commissioned third and last part capacity of 120 MW out of 220 MW Shajapur Solar Project (Unit-II) of NTPC Renewable Energy Limited. ' We wish to inform you that consequent upon successful commissioning, third and last part capacity of 120 MW out of 220 MW Shajapur Solar Project (Unit-II) of NTPC Renewable Energy Limited, a wholly owned subsidiary of NTPC Green Energy Limited at Shajapur, M.P, is declared on Commercial Operation w.e.f. 00:00 Hrs. of 29.06.2025,' the company said in an exchange filing dated June 28. On June 27, the company had informed the exchanges of successful commissioning of the first part capacity of 142.2 MW out of 300 MW Khavda Solar Energy Project of NTPC Renewable Energy Limited and the second part capacity of 146.7 MW out of 1255 MW Khavda-I Solar PV Project of NTPC Renewable Energy Limited. ' We wish to inform you that consequent upon successful commissioning: the first part capacity of 142.2 MW out of 300 MW Khavda Solar Energy Project of NTPC Renewable Energy Limited, a wholly owned subsidiary of NTPC Green Energy Limited at Khavda, Bhuj, Gujarat, under 450 MW Hybrid Tranche V Project is declared on Commercial Operation w.e.f. 00:00 Hrs of 28.06.2025 and the second part capacity of 146.7 MW out of 1255 MW Khavda-I Solar PV Project of NTPC Renewable Energy Limited, a wholly owned subsidiary of NTPC Green Energy Limited in Gujarat under CPSU scheme Phase-II Tranche-III, is declared on Commercial Operation w.e.f. 00:00 Hrs of 28.06.2025,' it said in the filing. Disclaimer: This story is for educational purposes only. The views and recommendations above are those of individual analysts or broking companies, not Mint. We advise investors to check with certified experts before making any investment decisions.

NTPC Green fully commissions 220 MW Shajapur Solar Project
NTPC Green fully commissions 220 MW Shajapur Solar Project

Business Upturn

time29-06-2025

  • Business
  • Business Upturn

NTPC Green fully commissions 220 MW Shajapur Solar Project

By Aman Shukla Published on June 29, 2025, 10:27 IST NTPC Green Energy has hit a major milestone with its Shajapur Solar Project in Madhya Pradesh now fully up and running. The company announced that the final 120 MW phase of the 220 MW Unit-II project has officially entered commercial operation from midnight, June 29, 2025. This marks the successful commissioning of the entire solar power facility by NTPC Renewable Energy Limited, a wholly owned subsidiary of NTPC Green Energy. In the exchange filings, the company shared, 'We wish to inform you that consequent upon successful commissioning, third and last part capacity of 120 MW out of 220 MW Shajapur Solar Project (Unit-II) of NTPC Renewable Energy Limited, a wholly owned subsidiary of NTPC Green Energy Limited at Shajapur, M.P, is declared on Commercial Operation w.e.f. 00:00 Hrs. of 29.06.2025.' Ahmedabad Plane Crash Aman Shukla is a post-graduate in mass communication . A media enthusiast who has a strong hold on communication ,content writing and copy writing. Aman is currently working as journalist at

NTPC Green commissions 288.9 MW solar power capacity at Khavda, Gujarat
NTPC Green commissions 288.9 MW solar power capacity at Khavda, Gujarat

Business Upturn

time27-06-2025

  • Business
  • Business Upturn

NTPC Green commissions 288.9 MW solar power capacity at Khavda, Gujarat

By Aman Shukla Published on June 27, 2025, 21:44 IST NTPC Green Energy Limited, through its wholly owned subsidiary NTPC Renewable Energy Limited, has announced the successful commissioning of over 288 MW of solar power capacity in Gujarat, effective June 28, 2025. As per the company's exchange filing under Regulation 30 of SEBI (LODR) Regulations, 2015, the first part capacity of 142.2 MW from the 300 MW Khavda Solar Energy Project has been declared commercially operational. This project is part of the 450 MW Hybrid Tranche V initiative and is located at Khavda in Bhuj, Gujarat. Additionally, a second part capacity of 146.7 MW has also been brought online from the 1255 MW Khavda-I Solar PV Project, which is being developed under the CPSU Scheme Phase-II, Tranche-III. Both projects are part of NTPC's larger push to expand renewable energy capacity across India. These developments mark a significant step in NTPC's ongoing commitment to green energy and contribute toward India's clean energy goals. Ahmedabad Plane Crash Aman Shukla is a post-graduate in mass communication . A media enthusiast who has a strong hold on communication ,content writing and copy writing. Aman is currently working as journalist at

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store