Latest news with #NaviMumbaiMetro


News18
5 days ago
- Business
- News18
Mumbai Metro-8: CSMIA-Navi Mumbai Airport In 30 Minutes, This Line Aims For Gold Standard Of Travel
Last Updated: Mumbai Metro Gold Line: When will work on CSMIA to Navi Mumbai airport Metro line 8 begin? Will it be linked to existing Navi Mumbai Metro? When will it be ready? Explained Mumbai Metro Line 8: Airports to underground & elevated travel – The answer to all of this is one Metro route, the line 8 connecting T2 of the Chhatrapati Shivaji Maharaj International Airport (CSMIA) to the upcoming Navi Mumbai International Airport (NMIA), which is being planned. What's more? There are plans to connect Mumbai Metro line 8 to the existing Navi Mumbai Metro network. Mumbai Metro-8: What will be the route of the gold line? What will be the stations? The line will begin at CSMIA Terminal 2 in Andheri, travel underground till Chhedanagar in Chembur, and then continue as an elevated line until NMIA. The alignment will pass through key urban locations including Kurla, Lokmanya Tilak Terminus (LTT), Mankhurd, Vashi, Nerul, Kharghar and Belapur. Total length: 35 km, with 25.8 km elevated and 8.2 km underground Likely station list (from DPR/concept): The likely route could cover CSMIA T2, Marol Naka (interchange Lines 1 & 3), Saki Naka (Line 1 interchange), Powai, Kanjurmarg (Line 6 interchange), Mulund East, Airoli, Ghansoli, Koparkhairane, Belapur CBD, NMIA Terminal 1, NMIA Terminal 2. What is the cost of Mumbai Metro-8? Estimated project cost: Rs 15,000 crore Being executed under a Public–Private Partnership (PPP) model, with CIDCO preparing the DPR and MMRDA also involved. What is the status of the Mumbai Metro-8? When will the work start? What is the deadline? Approval granted in January 2025 DPR completed by CIDCO; bidding expected late 2025 Construction expected to commence mid 2026, with full operations projected by late 2028 to early 2029. What is the frequency being planned for Mumbai Metro-8? Designed as an airport express, it is likely target to speeds up to 90 km/h, with reduced stops and fewer stations to ensure speedier travel (30-40 mins versus 2+ hours by road). Frequency planned at every 15 minutes. How will Mumbai Metro-8 cut travel time? The line is expected to cut airport-to-airport commute from 2 hours (by road) to about 30 minutes. HousieyI Love Navi Mumbai. Benefits include reduced congestion, eco-friendlier travel, real estate uplift along corridor (Powai, Kanjurmarg), economic growth, and tourism boost. Will Mumbai Metro-8 be connected to other lines? Metro 6: Kanjurmarg Likely with Line 2B (CSMT-Panvel), local suburban rail and bus systems in Belapur. Easy switching between lines is expected due to proximity and design of interchange stations. How will Mumbai Metro-8 help officegoers? It will help frequent airport commuters—corporate travellers, airport staff, business travelers—due to reliability, reduced travel time, and avoidance of road traffic. #NaviMumbaiAirport is gearing up to welcome you — and at the heart of it all is ORAT: Operational Readiness, Activation, and systems and staff to passenger experience, every detail is being fine-tuned to ensure a smooth and coordinated opening day. Stay tuned… — Navi Mumbai International Airport (@navimumairport) July 15, 2025 Mumbai Metro-8: Ticketing and fare structure Official rates not yet announced. Estimated fares (projected) could be short segments: Rs 20-30; medium (e.g., Vashi-Belapur): Rs 40-60; Long (Seawoods/Nerul to CSMIA): Rs 100-120; Airport-to-airport: Rs 150-180. Likely to support smart card, mobile ticketing, integrated passes and perhaps airport-standard facilities (lounges, luggage space). Points to Remember for Ticket Buyers Watch fare slabs impacted by travel distance. Consider monthly passes or integration with existing smart cards/apps for convenience. If traveling airport to airport, luggage norms or premium charges might apply. Will Mumbai Metro-8 be connected to other public transport & future lines? Interchanges with existing Metro lines (1, 3, 6) are planned. It will connect indirectly to suburban rail and bus networks, particularly at Belapur CBD and Mankhurd. Future lines (e.g., Line 2B or others in Navi Mumbai) may further integrate with Line 8 corridor CSMIA & MUMBAI METRO For those directly travelling from Mumbai, Metro Line 7A, an extension of Metro-7, is the one which will take you to the CSMIA. It includes both elevated and underground sections. A tunnel breakthrough has been achieved. Points to remember From city: Metro-7A, an extension of Metro-7, connects Andheri East to CSMIA T2. From city, suburbs: Metro-1 (the existing Versova-Andheri-Ghatkopar corridor) also takes to Airport Road station, from where you can transfer to Metro-7A. From suburbs: Metro-9 (Dahisar to Mira-Bhayander) connects to Metro-7 at Dahisar. Metro-7 in short: It is part of the elevated 16.5-km red line from Andheri (E) to Dahisar (E) which runs along the Western Express Highway from Dahisar to Gundavali. The stations are — Dahisar East, Ovaripada, National Park, Devipada, Magathane, Poisar, Akurli, Kurar, Dindoshi, Aarey, Goregaon E (Interconnect Mumbai Metro-6: Pink Line), Jogeshwari E, Shankarwadi, and Gundavali (Earlier Andheri East, Interconnect Mumbai Metro 1 – Blue Line and Mumbai Metro: 7A – Red Line). Metro-7A has two stations — Airport Colony (elevated) and Chhatrapati Shivaji Maharaj International Airport (underground). Metro-9 in short: The Dahisar (East) to Thane's Kashigaon Metro line is an extension of Metro-7. Its stations are – Dahisar (East), Pandurangwadi, Miragaon, Kashigaon, (phase 2 begins) Sai Baba Nagar, Meditiya Nagar, Shahid Bhagat Singh Garden, Subhash Chandra Bose Stadium. Metro-9 connects to Andheri (West) via Line 2B, Ghatkopar via Metro-7 and 1, Link Road through Metro Line-2A at Dahisar (East), and Thane via Line 10 at Miragaon (in the future). The Link to existing Navi Mumbai Metro Line Operational since November 17, 2023, covering an elevated corridor of 11 km with 11 stations from CBD Belapur to Pendhar, the Navi Mumbai Metro line is being gradually extended toward Khandeshwar and Navi Mumbai International Airport (NMIA), reaching a planned full length of 23.4-23.6 km with 20 stations. Navi Mumbai is a rapid transit rail system, which has one operational line. The project has three phases: Phase 1: Belapur to Pendhar (11.10 km) with 11 stations – CBD Belapur, Sector 7, CIDCO Science Park, Utsav Chowk, Sector 11, Sector 14, Central Park, Pethpada, Sector 34, Panchanand and Pendhar Metro Station. Phase 2: Khandeshwar to MIDC Taloja (extension to Airport proposed) (10.3 km) with 8 stations –Khandeshwar, Kalamboli, Sector 13, Sector 11, Sector 7E, Sector 7, Sector 2E, and MIDC Taloja. Phase 3: Interlink between Pendhar and MIDC Taloja (2.2 km) with one station. Navi Mumbai Metro Line: Key stations CBD Belapur (interchange with Mumbai suburban rail) Belpada (Kharghar) (interchange with Kharghar railway station) Pethali–Taloja (near Taloje Panchnand rail station) Pendhar terminal Navi Mumbai Metro Line: What are its operating hours and frequency? Operating hours: 6:00 AM to 10:00 PM daily Frequency: Early operations indicate a train every 15 minutes, especially in Phase I stretch; frequency improvements are expected as ridership grows Navi Mumbai Metro Line: What is the fare structure? Distance-based fare slabs from Rs 10 (up to 2 km) to Rs 40 for journeys over 10 km. CIDCO recently rolled out a QR-based ticketing system, allowing mobile or paper tickets purchased via app or soon via WhatsApp and NCMC smart cards for unified travel across networks. Navi Mumbai Metro Line: Is it linked to Mumbai Metro? Direct link proposed via Mumbai Metro Line 8 (Gold Line), with an interchange at proposed Sagar Sangam station in Belapur, linking it with Navi Mumbai Metro Line 1. Several stations provide direct or nearby suburban rail interchanges: CBD Belapur: Belapur suburban railway (Harbour Line) Belpada (Kharghar): Kharghar railway station Pethali-Taloja: Taloje Panchnand railway station top videos View all Feeder systems are being planned: shared autos, BEST bus bays, and pedestrian access with autorickshaw facilities near key stations. Additionally, the Mumbai Metro Line 12 (Kalyan-Taloja Metro) will interlink with the Navi Mumbai Metro at Taloja. About the Author Manjiri Joshi At the news desk for 17 years, the story of her life has revolved around finding pun, facts while reporting, on radio, heading a daily newspaper desk, teaching mass media students to now editing special copies ...Read More tags : Mumbai airport Mumbai metro mumbai metro inauguration mumbai metro line mumbai metro project Mumbai Metro Rail Corporation Mumbai Metropolitan Region Development Authority Navi Mumbai airport Navi Mumbai Metro view comments Location : Mumbai, India, India First Published: August 12, 2025, 17:28 IST News cities » mumbai-news Mumbai Metro-8: CSMIA-Navi Mumbai Airport In 30 Minutes, This Line Aims For Gold Standard Of Travel Disclaimer: Comments reflect users' views, not News18's. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.


News18
6 days ago
- Business
- News18
Mumbai Metro-12: The Line That Will Link Kalyan To Taloja & Navi Mumbai Airport
Last Updated: Mumbai Metro Orange Line: How will Kalyan-Taloja metro line 12 connect to Navi Mumbai airport? Will it link to CSMIA? When will it be ready? Mumbai Metro Line 12: A key feature of the Mumbai Metro plan is the connectivity it offers to different parts of the city. A perfect example is Mumbai Metro Line 12, which connect Kalyan to Taloja and the Navi Mumbai Metro corridor. The line is part of the orange line as an extension of Metro Line 5 (Thane-Bhiwandi-Kalyan). It will be a fully elevated corridor, approximately 22.17 km, featuring 19 stations from APMC Kalyan to Amandoot (Taloja). The list of stations is: APMC Kalyan (interchange with Line 5) Kalyan Ganesh Nagar Pisavali Gaon Golavali Dombivli MIDC Sagaon Sonarpada Bale Waklan Turbhe Pisarve Depot (depot connectivity) Pisarve Amandoot (Taloja; interchange with Navi Mumbai Metro Line 1) How much will Mumbai Metro Line 12 cost? The project cost is estimated at Rs 5,865 crore, inclusive of escalation and taxes Civil contract awarded via EPC package to consortium led by Gawar Constructions (bid approximately Rs 2,037 crore) What is the progress of Mumbai Metro-12? What is the deadline? The construction work initiated in March 2024, initial pile and viaduct works underway; currently early stages with 5–20% structural elements completed (e.g., piers, piles) Full completion targeted by December 2027, with a 30-month construction period under EPC contract. How many trains will run on Mumbai Metro-12? Trains are part of Line 5/12 shared fleet, likely 6 coach rakes (depending on demand) Estimated daily ridership: 2.5–2.6 lakh by 2031, rising to 3 lakh by 2041. What will be the timings and frequency of Mumbai Metro-12? Expected to operate 6 AM to 10 PM (in line with other Mumbai metro lines) Frequency likely: Peak hours: 5-7 minutes, Off-peak: 8-10 minutes upon full operations. How much time will Mumbai Metro-12 save? Commuting between Kalyan and Taloja currently takes 1–1.5 hours by road. Metro will cut it to approximately 45 minutes, saving 45 minutes to an hour each way. It will enhance connectivity between Kalyan Dombivli, Navi Mumbai, and Thane regions. It will reduce road congestion and reliance on buses, benefiting commuters and local industry workers. It will encourage regional growth, infrastructure investment, and improved living standards. It will open up faster access across Kalyan, Dombivli, and Navi Mumbai, reducing travel time for professionals commuting to Thane, Navi Mumbai hubs, industrial zones It will be valuable for corporate and managerial personnel in transit between job zones in Navi Mumbai and residential belts in Kalyan-Dombivli. Will Metro-12 be linked to Navi Mumbai airport? Can a metro take you to CSMIA from Kalyan? Kalyan to Navi Mumbai airport: The likely route that looks on paper for now. Line 12 connects Kalyan (APMC) to Taloja (Amandoot). It intersects with Navi Mumbai Metro Line 1 at Taloja (Amandoot), which eventually connects toward Khandeshwar and is slated to extend further toward NMIA. Alternatively, you could use the upcoming Mumbai Metro Line 8 (Gold Line), which will directly connect CSMIA Airport-NMIA. Option 1: You will have to reach Ghatkopar for Metro-1 (Versova-Andheri-Ghatkopar corridor) which takes to Western Express Highway, from where you can transfer to Metro-7 (Andheri East to Dahisar East) and then its extension 7A, which connects Andheri East to CSMIA T2. Or from line 1 go to Metro-3 (at Marol Naka) and head to CSMIA station along the way. Option 2: Take Metro-5 (Kalyan-Thane), at Kapurbawdi, you can switch to Metro-4 (Kasarvadavli-Wadala). From Wadala, head to line 3 (Siddhivinayak station), which is 400 m away and passes through CSMIA (Airport-T1). Will Mumbai Metro-12 be connected to other lines? Metro Line 5: APMC Kalyan Navi Mumbai Metro Line 1: Amandoot (Taloja) Future Metro Line 14: Hedutane Line 5 continuity to Thane via APMC Kalyan Interchanges will be designed as integrated elevated concourse platforms for smoother transfers. Mumbai Metro-12: What will be the ticket fares? Metro-12 will use Automatic Fare Collection (AFC) system — smart cards and QR tokens, same as other metro lines Likely fare slabs (typical pattern): Rs 10 (up to 2 km), Rs 20 (2-5 km), Rs 30 (5-12 km), Rs 40 (12-18 km), Rs 50 (18-24 km) Example: Full travel (22 km) expected to cost around Rs 50-60. Rider Tips: Top up smart cards only via official metro outlets or mobile apps Be aware of distance/zone slabs when tapping in/out Check last train timing (10 PM) Use women-only coach if required; keep emergency numbers accessible. Will Mumbai Metro-12 be linked to public transport? At Kalyan area: connects with local bus services, suburban rail at Kalyan Station (via Line 5/Metro5) At Taloja: integrates with Navi Mumbai Metro Line 1, buses in Navi Mumbai Aims to provide seamless multimodal access across major urban corridors Will Metro-12 be connected to planned lines? Lies within the broader Orange Line corridor (Lines 5 & 12 extend to Thane and Navi Mumbai) top videos View all Proposed future interchange with Metro Line 14 (Vikhroli-Badlapur) at Hedutane Supports larger network goal of 337-km metro coverage across Mumbai by expanding into peripheral zones. About the Author Manjiri Joshi At the news desk for 17 years, the story of her life has revolved around finding pun, facts while reporting, on radio, heading a daily newspaper desk, teaching mass media students to now editing special copies ...Read More tags : Kalyan Maha Mumbai Metro Operation Corporation Ltd Mumbai metro mumbai metro line mumbai metro one mumbai metro project Mumbai Metropolitan Region Development Authority Navi Mumbai Metro news18 specials view comments Location : Mumbai, India, India First Published: August 11, 2025, 16:55 IST News cities » mumbai-news Mumbai Metro-12: The Line That Will Link Kalyan To Taloja & Navi Mumbai Airport Disclaimer: Comments reflect users' views, not News18's. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.