3 days ago
ISRO successfully completes development of Service Module Propulsion System for Gaganyaan
Bengaluru,
ISRO
on Saturday said it has successfully completed the development of
Service Module Propulsion System
(SMPS) for
Gaganyaan Mission
with the completion of the qualification test programme.
A full duration hot test of SMPS for 350 seconds was conducted to validate the integrated performance of the SMPS for flight off-nominal mission profile of the Service Module based
mission abort
on Friday.
Gaganyaan mission is India's
first human spaceflight mission
in the making.
by Taboola
by Taboola
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
Villas For Sale in Dubai Might Surprise You
Villas in Dubai | Search Ads
Get Info
Undo
"The overall performance of the propulsion system during the hot test was normal as per pre-test predictions," ISRO said in a statement.
According to the
space agency
, "The Service Module (SM) of
Gaganyaan
is a regulated bi-propellant based propulsion system that caters to the requirements of the Orbital Module for orbit circularisation, on-orbit control, de-boost manoeuvring and Service Module based abort during the ascent phase."
Live Events
The Liquid Apogee Motor (LAM) engines provide the main propulsive force during the orbit circularisation and de-boost phases, while the
Reaction Control System
(RCS) thrusters ensures precise attitude control, it added.
"A System Demonstration Model (SDM) test bed was realised emulating the fluid circuit of the SMPS, encompassing the propellant tank feed system, helium pressurisation system, flight-qualified thrusters, and control components," ISRO said.
It added that the SDM for SMPS has undergone 25 tests under nominal and off-nominal conditions for a cumulative duration of 14,331s for various Gaganyaan mission scenarios and human rating requirements.
The space agency said the Gaganyaan Service Module Propulsion System is designed, developed, and realised by
Liquid Propulsion Systems Centre
(LPSC) and the tests were carried out at ISRO Propulsion Complex (IPRC), Mahendragiri in Tamil Nadu.