4 days ago
KSLU to get dedicated administrative building after 15 yrs
Hubballi: After more than 15 years since its establishment, Karnataka State Law University (KSLU) in Hubballi is set to have its own dedicated administrative building. The construction of the G+3 structure is under way on 2.4 acres, at an estimated cost of Rs 39.5 crore.
The building is expected to be completed by May 2026.
KSLU, established in Jan 2009, currently operates from a former PWD guest house that was repurposed into an administrative office. Spread over a 55-acre campus, the university offers undergraduate and postgraduate courses in constitutional law, intellectual property rights, business and trade law, criminal law, and international law. While around 1,200 students study on the campus, the university has a total student strength of approximately 45,000 across the state.
The total built-up area of the four-storey structure will be 94,761 sq. ft. The ground floor will be 24,440 sq. ft, first floor 20,321 sq. ft, second floor 22,255 sq. ft, and third floor 20,321 sq. ft.
KSLU vice-chancellor Prof C Basavaraju told TOI that the new building is being constructed on 2.4 acres in front of the existing building. "The project faced land allocation issues earlier. The work was awarded to a Bengaluru-based company in Jan.
by Taboola
by Taboola
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
Why is everyone rushing to get their hands on this new air cooler?
News of the Discovery
Undo
We expect the work to be completed within the stipulated 11-month timeframe.," he informed.
RM Kulkarni, KSLU assistant executive engineer (AEE), explained that the ground floor will house a canteen, bank, post office, storeroom, physical director's office, laboratory and toilets. The first floor will include the vice- chancellor's office, related administrative offices, DPAR section, legal cell, clinic, and a 60-seat auditorium. The second floor will accommodate the finance section, ICT section, syndicate zone and cabins, student welfare and development section, academic zone and toilets.
The third floor will feature the engineering section, SC/ST records cell, planning and management office, NSS office, administrative section, and toilets.