logo
#

Latest news with #ResonatorPhrolova

Wuthering Waves version 2.5 release date and server maintenance schedule for every region
Wuthering Waves version 2.5 release date and server maintenance schedule for every region

Time of India

time22-07-2025

  • Entertainment
  • Time of India

Wuthering Waves version 2.5 release date and server maintenance schedule for every region

Image via Kuro Games. Wuthering Waves fans are highly excited for the version 2.5 update. The recently held livestream had already revealed what is coming their way, and as a result, the excitement level is soaring even higher. Before the release of version 2.5 update, there will be a server downtime as well to implement the patch completely, but the timings of this server maintenance can vary in different regions. Let's delve into the release dates and maintenance timelines of Wuthering Waves version 2.5 for every region. Wuthering Waves version 2.5: Release date and server maintenance schedule Wuthering Waves version 2.5 is going to be released on July 23, 2025. | Image via Kuro Games. Kuro Games has recently confirmed that the version 2.5 update in Wuthering Waves is going to be launched on July 23, 2025. But this release date and timings will surely differ in different timezones as this patch is going to be a global release. So, here are the release timings of Wuthering Waves version 2.5 in different regions and timezones: Region Timezone Release Date Local Time Los Angeles PT (UTC –7) July 23, 2025 8:00 PM Denver MT (UTC –6) July 23, 2025 9:00 PM Chicago CT (UTC –5) July 23, 2025 10:00 PM New York ET (UTC –4) July 23, 2025 11:00 PM London BST (UTC +1) July 24, 2025 4:00 AM Berlin CEST (UTC +2) July 24, 2025 5:00 AM Delhi IST (UTC +5:30) July 24, 2025 8:30 AM Singapore SGT (UTC +8) July 24, 2025 11:00 AM Tokyo JST (UTC +9) July 24, 2025 12:00 PM Sydney AEST (UTC +10) July 24, 2025 1:00 PM Now coming to the maintenance schedule, the server downtime will begin on July 23, 2025, at 1:00 PM and will run for around 7 hours. So, players in different regions can easily calculate the server downtime end time as immediately after that, they can jump into the game to relish the version 2.5 contents. For an example: If the server downtime begins in New York on July 23, 2025, at 4:00 PM ET, then the maintenance will run until July 23 at 11:00 PM ET and version 2.5 will launch exactly on that time. As version 5.6 is a full-fledged update, this patch will end after six-week, as per the regular update cycle in Wuthering Waves. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like 15 most beautiful women in the world Undo That means, if this patch is released in Berlin on July 24 at 5 AM CEST, then version 2.5 will be available until September 2, 2025, at 10:00 PM CEST. The highlight of this update is going to be the introduction of the new 5 star Resonator Phrolova. She is going to be the first playable character from the main antagonist faction of the game, Fractsidus. Not only that, there will be 4 star units as well in the form of Lumi, Yuanwu, and Taoqi. Read More: Wuthering Waves 2.5 livestream codes for July 2025 Catch Rani Rampal's inspiring story on Game On, Episode 4. Watch Here!

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store