26-05-2025
BART Green Line resumes after weeklong track fire disruption
OAKLAND, Calif. - Normal service on BART's Green Line resumed on Memorial Day after a nearly weeklong disruption due to an electrical fire on the San Leandro tracks.
Shortly before 9 a.m. Monday, BART officials said trains were once again running on the Green Line, six days after a fire near the San Leandro station suspended service.
The Green Line serves Berryessa in San Jose and Daly City.
That line has been stopped since May 20, when a fire at the BART station in San Leandro, sent sparks flying and stopped train service.
It turns out that a small feeder cable failed, which started a fire that took out communications and train control, BART officials said last week.
BART is operating on a Sunday schedule for the Memorial Day holiday on Monday, from 8 a.m. until about midnight.
All five lines will be in service until about 9 p.m., and after that BART will run three-line (Yellow, Blue, and Orange) service.