logo
Tshwane boosted with nuclear safety equipment worth millions

Tshwane boosted with nuclear safety equipment worth millions

The Citizen09-07-2025
Tshwane recently received a much-needed gift from the United States that will see it respond more efficiently to radiological emergency needs.
The metro's Emergency Services Department received a significant boost in its emergency response capabilities with the donation of advanced radiation detection equipment.
The equipment, valued at approximately R5-million, will enhance the city's capacity to respond to chemical, biological, radiological and nuclear incidents.
MMC for Community Safety, Alderman Hannes Coetzee, welcomed the donation, noting that Tshwane, as the capital of South Africa, hosts 138 embassies, national government headquarters, and strategic infrastructure, making well-equipped emergency response essential.
'Tshwane's proximity to the Pelindaba Nuclear Facility further emphasises the need for radiological preparedness,' Coetzee said.
He added that the donation from the United States includes personal radiation detectors, backpack detectors, a VeriFinder radiation identification device, and a specialised computer system for the South African Nuclear Energy Corporation (NECSA).
'This equipment fills a critical gap, as the emergency department previously had no radiation detection tools, and lacked the budget to procure them.'
He added that in June, 16 officials from the emergency services and four NECSA representatives received hands-on training with the new equipment.
'This follows more than four years of capacity-building partnerships with local and international stakeholders, including Interpol, the South African Military Health Service, and the US Department of Energy.'
Coetzee said the initiative was conducted in line with diplomatic protocols and collaboration with the Department of International Relations and Cooperation and the Department of Mineral Resources and Energy.
'This donation is a testament to the strong collaboration between national, local, and international partners in safeguarding our communities,' said Coetzee.
'It also aligns with our administration's strategic focus on strengthening internal capacity.'
He expressed gratitude to the US government for its donation to public safety.
Do you have more information about the story?
Please send us an email to [email protected] or phone us on 083 625 4114.
For free breaking and community news, visit Rekord's websites: Rekord East
For more news and interesting articles, like Rekord on Facebook, follow us on Twitter or Instagram or TikTok.
At Caxton, we employ humans to generate daily fresh news, not AI intervention. Happy reading!
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Kalafong: A Crisis of Filth, Neglect, and Government Failure
Kalafong: A Crisis of Filth, Neglect, and Government Failure

IOL News

time4 days ago

  • IOL News

Kalafong: A Crisis of Filth, Neglect, and Government Failure

As Gauteng Health announces plans to curb hospital-acquired infections, my recent visit to the Kalafong Provincial Hospital was humbling yet stressful, given the conditions under which the medical staff work, says the writer. Despite strained facilities, there are some public hospitals where staff defy the odds to offer a professional, dedicated service. Against over-crowding, being overworked and poorly maintained hospitals, the professional staff continue to do what they can to attend to patients with various ailments. As Gauteng Health announces plans to curb hospital-acquired infections, my recent visit to the Kalafong Provincial Hospital was humbling yet stressful, given the conditions under which the medical staff work. The hospital might be the dirtiest, filthiest, and most unhygienic hospital I have ever visited in my life, but the service I received from capable, professional, and dedicated doctors there spoke volumes. After a week of feeling unwell, with unbearable fatigue and persistent chest pains, I decided to consult my GP. I couldn't properly articulate what I was feeling, but my doctor suggested X-rays and blood tests, which my medical insurance covered. Two days later, the results came back normal. He then recommended that I see a cardiologist. I started calling around, only to find that consultations were priced between R5 000 and R8 000, and the earliest appointments were only available in October. While my chest pain persisted, I continued searching for more affordable specialists. One clinic quoted R8 000 for a full check-up, excluding potential treatment costs. When I contacted my medical insurance, I was told they could only cover R1 300 of the R8 000. I had to humble myself; even with a 10% discount, I couldn't afford the specialist's services. I then visited a local clinic, which referred me to Kalafong Provincial Hospital in Pretoria. I wasn't prepared to go to a government hospital, but since it had become a matter of life and death, I had no choice. I arrived around 7 a.m. and, although the receptionist didn't give much direction, I approached a doctor who was checking the queue. I explained my symptoms and handed over the referral letter from the clinic. She directed me to the emergency queue, noting that chest pain is treated as a serious matter. After two hours of waiting, I finally saw a doctor. His humility and the way he lightened the moment with a few jokes during the consultation were truly comforting. The nurses who attended to me showed an incredible level of care. I was taken for an ECG to check my heart's functionality, and blood samples were drawn to rule out any suspicions. They also recommended I undergo an ultrasound. Despite telling them I could walk, I had driven myself there, after all, they insisted, I remained in a hospital bed as a precaution. They informed me that I could only be released once my lab results were back. They clearly explained the risks of leaving without knowing what could be wrong. I appreciated their honesty and dedication. At some point, I asked one of the doctors why the hospital was so filthy. She told me they hadn't had running water for almost two weeks unthinkable for a tertiary hospital. To paint a picture: As I entered, I was greeted by a filthy security passage. I brushed it off, thinking maybe it was just because it was outside. I was wrong. When I was asked to provide a urine sample, I was told the toilets inside weren't working, a fact confirmed by the overpowering stench coming from the bathrooms near the waiting area. I was directed to the outdoor mobile toilets. The sight and smell were nauseating. I still can't forget what I saw, but I had no choice. When I was later told I might need to be admitted if the blood results didn't come through that day, I prayed hard that they would. I couldn't imagine spending the night in those conditions. Even though I was just a visitor for the day, I couldn't stop thinking about the doctors and nurses who work under such conditions every single day. It's truly inhumane. After spending 12 hours there, my results came back with no alarming findings. I was told to return to see a specialist and also to get a sonar scan. The truth is, everything they checked from the X-rays, ultrasound, blood tests, and the recommended sonar are things I wouldn't have been able to afford privately. This experience showed me just how capable our healthcare practitioners and public resources are when it comes to helping the poor. I saved myself a whopping R10 000, including the medication I received. But deep down, the thought of having to go back for further check-ups makes me uneasy. I'm not ready to face that grimy environment again, like I did over the past few days. I fully support ActionSA's Dr. Kgosi Letlape, who, during the Health Department's budget vote address, called on all leaders to use public healthcare services. 'All of us should use public services — from the president to MPs, to members of the executive… all public servants. If we do this, we can fix the public healthcare system,' said Dr. Letlape. I am calling on the City of Tshwane and the National Department of Health to intervene urgently at Kalafong Hospital. With dedicated doctors and nurses doing their best under such conditions, the government must do better. If accountability is needed, then those responsible must be held accountable. We cannot continue to accept this state of neglect simply because top politicians don't use public hospitals. Nathi singabantu. We are human too. Opinion by Zingiswa Mndayi, a Communication Specialist, writing this in her capacity.

Rethinking HIV treatment with tailored solutions for improved patient engagement and outcomes
Rethinking HIV treatment with tailored solutions for improved patient engagement and outcomes

Daily Maverick

time6 days ago

  • Daily Maverick

Rethinking HIV treatment with tailored solutions for improved patient engagement and outcomes

The health department has R622-million extra to prop up South Africa's HIV treatment programme in the wake of foreign aid cuts. But it's only about a fifth of the total gap. We look at how data can help drive decisions to make the most of this lifebuoy. Just over two weeks ago, Health Minister Aaron Motsoaledi announced that the Treasury had given R622-million of emergency funding to his department to prop up South Africa's HIV treatment programme, with about R590-million for provinces' HIV budgets and R32-million for the chronic medicine distribution system, which allows people to fetch their antiretroviral treatment from pick-up points other than clinics, closer to their homes. This extra budget is just over a fifth of the roughly R2.8-billion funding gap that the health department says the country needed after US President Donald Trump's administration pulled the plug on financial support for HIV in February. (The Pepfar/Aids relief budget for this financial year was just under R8-billion, but the health department calculated that it could fill the void with R2.8-billion if it trimmed extras and ruled out duplicate positions.) So, how to get the best bang for these limited bucks — especially with the health department wanting to get 1.1-million people with HIV on treatment before the end of the year and so reach the United Nations targets for ending Aids as a public health threat by 2030? By getting really serious about giving people more than one way of getting their repeat prescriptions for antiretroviral (ARV) medicine (so-called differentiated service delivery), said Kate Rees, the co-chairperson of the 12th South African Aids Conference to be held later this year, from Kigali last week, where she attended the 13th IAS Conference on HIV Science. At another Kigali session, Lynne Wilkinson, a public health expert working with the health department on public health approaches to help people stay on treatment, said: 'People who interrupt their antiretroviral treatment are increasingly common, but so are people who re-engage, or in other words start their treatment again after having stopped for a short period.' A big part of South Africa's problem in getting 95% of people who know they have HIV on ARVs (the second target of the UN's 95-95-95 set of cascading goals) is that people — sometimes repeatedly — stop and restart treatment. For the UN goals to be reached, South Africa needs to have 95% of people diagnosed with HIV on treatment. Right now, the health department says, we stand at 79%. But the way many health facilities are run makes the system too rigid to accommodate real life stop-and-start behaviour, says Rees. This not only means that extra time and money are spent every time someone seemingly drops out of line and then comes back in, but also makes people unwilling to get back on board because the process is so inconvenient and unwelcoming. Rees and Wilkinson were the co-authors of a study published in the Journal of the International Aids Society in 2024, whose results helped the health department update the steps health workers should follow when someone has missed an appointment for picking up their medicine or getting a health check-up — and could possibly have stopped treatment. 'We often have excellent guidelines in place, built on solid scientific evidence,' says Rees, 'but they're not necessarily implemented well on the ground.' To make sure we track the second 95 of the UN goals accurately, we need a health system that acknowledges people will come late to collect their treatment and sometimes miss appointments. This doesn't necessarily mean they've stopped their treatment; rather that how they take and collect their treatment changes over time. 'The standard ways in which the public health system works mostly doesn't provide the type of support these patients need, as the resources required to provide such support is not available,' says Yogan Pillay, the health department's former deputy director-general for HIV and now the head of HIV delivery at the Gates Foundation. 'But with AI-supported digital health solutions and the high penetration of mobile phones, such support now can — and should — be provided at low cost and without the need to hire additional human resources.' We dived into the numbers to see what the study showed — and what they can teach us about making the system for HIV treatment more flexible. Does late equal stopped? Not necessarily. Data from three health facilities in Johannesburg that the researchers tracked showed that of the 2,342 people who came back to care after missing a clinic appointment for collection medication or a health check, 72% — almost three-quarters — showed up within 28 days of the planned date. In fact, most (65%) weren't more than two weeks late. Of those who showed up at their clinic more than four weeks after they were due, 13% made it within 90 days (12 weeks). Only one in 14 people in the study came back later than this, a period by which the health department would have recorded them as having fallen out of care. (Some incomplete records meant the researchers could not work out by how much 8% of the sample had missed their appointment date.) The data for the study was collected in the second half of 2022, and at the time national guidelines said that a medicine parcel not collected within two weeks of the scheduled appointment had to be sent back to the depot. 'But it's important to distinguish between showing up late and interrupting treatment,' notes Rees. Just because someone was late for their appointment doesn't necessarily mean they stopped taking their medication. Many people in the study said they either still had pills on hand or managed to get some, despite not showing up for their scheduled collection. Pepfar definitions say that a window of up to 28 days (that is, four weeks) can be tolerated for late ARV pick-ups. Pepfar is the US HIV programme that funds projects in countries like South Africa, but most of them were cut in February. Research has also shown that for many people who have been on treatment for a long time already, viral loads (how much HIV they have in their blood) start to pass 1,000 copies/mL — the point at which someone could start being infectious again — about 28 days after treatment has truly stopped. Sending back a parcel of uncollected medicine after just two weeks — as was the case at the time of the study — would therefore add an unnecessary administration load and cost into the system. (Current health department guidelines, updated since the study and in part because of the results, say that a medicine pick-up point can hold on to someone's medicine for four weeks after their scheduled appointment.) Does late equal unwell? Not always. In fact, seven out of 10 people who collected their next batch of medication four weeks or more late had no worrying signs, such as possible symptoms of tuberculosis, high blood pressure, weight loss or a low CD4 cell count, when checked by a health worker. (A low CD4 count means that someone's immune system has become weaker, which is usually a sign of the virus replicating in their body.) Moreover, given the large number of people without worrying health signs in the group for whom data was available, it's possible that many of those in the group with incomplete data were well too. When the researchers looked at the patients' last viral load results on file (some more than 12 months ago at the time of returning to the clinic), 71% had fewer than 1,000 copies/mL in their blood. A viral count of fewer than 1,000 copies/mL tells a health worker that the medicine is keeping most of the virus from replicating. It is usually a sign of someone being diligent about taking their pills and managing their condition well. Yet clinic staff often assume that people who collect their medicine late are not good at taking their pills regularly, and so they get routed to extra counselling about staying on the programme. 'Most people don't need more adherence counselling; they need more convenience,' says Rees. Offering services that aren't necessary because of an inflexible process wastes resources, she says — something a system under pressure can ill afford. Rees says: 'With funding in crisis, we really have to prioritise [where money is spent].' Does late equal indifferent? Rarely. Close to three-quarters of people who turned up four weeks or more after their scheduled medicine collection date said they had missed their appointment because of travelling, work commitments or family obligations. Only about a quarter of the sample missed their appointment because they forgot, misplaced their clinic card or for some other reason that would suggest they weren't managing their condition well. Part of making cost-effective decisions about how to use budgets best is to offer 'differentiated care', meaning that not every patient coming back after a missed appointment is treated the same way, says Rees. Health workers should look at by how much the appointment date was missed, as well as a patient's health status to decide what service they need, she says. Giving people who've been managing their condition well enough medicine to last them six months at a time can go a long way, Wilkinson told Bhekisisa's Health Beat team in July. 'Getting 180 pills in one go reduces the number of clinic visits [only twice a year], which eases the workload on staff. But it also helps patients to stay on their treatment by cutting down on their transport costs and time off work,' Wilkinson said. Zambia, Malawi, Lesotho and Namibia have all rolled out six-month dispensing — and have already reached the UN's target of having 95% of people on medicine at a virally suppressed level. According to the health department, South Africa will start rolling out six-month dispensing in August. 'But not everyone wants this,' said Wilkinson, pointing out that experiences from other countries showed that 50 to 60% of people choose six-monthly pick-ups. It speaks to tailoring service delivery to patients' needs, says Rees, rather than enforcing a one-size-fits-all system when more than one size is needed. Says Rees: 'Facing funding constraints, we really need tailored service delivery to keep the [HIV treatment] programme where it is.' DM

Fake licence and ballooned budget: PwC report places IDT seniors at centre of R800m oxygen tender
Fake licence and ballooned budget: PwC report places IDT seniors at centre of R800m oxygen tender

The Citizen

time29-07-2025

  • The Citizen

Fake licence and ballooned budget: PwC report places IDT seniors at centre of R800m oxygen tender

A forensic report has found that the IDT awarded a major oxygen plant contract to an unqualified company using a fraudulent Sahpra licence. The Independent Development Trust (IDT) awarded a multi-million oxygen plant project tender to a company that did not have a valid South African Health Products Regulatory Authority (Sahpra) license. This is according to a report by auditing firm PricewaterhouseCoopers (PwC), which looked into the R836-million oxygen plant tender to supply oxygen systems to 60 state hospital facilities across the country. Fraudulent license submission exposed The report was released by Public Works and Infrastructure Minister Dean MacPherson at a media briefing in Pretoria on Tuesday. It revealed that Bulkeng Pty Ltd fraudulently submitted a Sahpra license that belonged to a different company. IDT, the government's built environment project management agency, awarded Bulkeng a R428 million tender on behalf of the Department of Health to install pressure swing adsorption (PSA) oxygen plants. 'Bulkeng Pty Ltd submitted a Sahpra license belonging to Atlas Copco Industrial SA without the knowledge or consent of Atlas Copco. This was a clear misrepresentation. In simple language, it's called fraud,' MacPherson said. Furthermore, Bulkeng has a Construction Industry Development Board grading threshold of R200 million, which means it did not qualify to be awarded a project of that value. Additional contractors lacked Sahpra approval MacPherson said the report also revealed that seven other companies were awarded contracts without valid Sahpra licences. ALSO READ: Macpherson suspends all EPWP funds to municipality 'The service providers that were appointed on the panel were, however, not required to provide evidence that they meet the Sahpra requirements as set out in the Infrastructure Programme Implementation Plan,' the minister said. Project costs soared without explanation Another alarming finding was that a R216 million budget ballooned to R592 million without justification. MacPherson said the Department of Health requested to approve increased funding for the rollout and implementation of the plant projects to R590 million—more than double what the original starting estimate was. 'This project was therefore increased by a staggering 174% from the initial estimated budget.' He said the international financing organisation Global Fund and the health department approved the increased budget, despite one of the initial conditions in 2022 being that the total cost of the project would not exceed R216 million. The report also singled out Dr Molebedi Sisi, IDT's general manager of supply chain management, for his 'role in misleading internal stakeholders and failing to act in accordance with his responsibilities'. MacPherson said Sisi advised against cancelling the Request for Quotation Process of the tender bidding, despite clear warnings from the Department of Health. 'He assured the [IDT] CEO and evaluation committees that the procurement process was compliant, when in fact key regulatory requirements such as valid Sahpra licences had not been enforced.' ALSO READ: 'Extend that apology to black South Africans,' says ActionSA over Macpherson's hobo comment Instead, both the CEO, Tebogo Malaka, and Sisi approved contracts, he said. IDT executives named for misleading and inaction The report revealed that Malaka failed to exercise oversight and relied entirely on internal supply chain management staff to assure her that the processes had followed proper procurement protocol. 'She did not verify any of the documentation. She did not act on any of the red flags raised by the Department of Health.' PwC investigation followed media exposé As a result of these findings, the minister said disciplinary action was recommended against the senior officials involved. The Department of Public Works appointed PwC to conduct a full independent forensic investigation into the PSA oxygen plant on 15 January, following a related exposé by the Daily Maverick three months prior. MacPherson said investigators conducted over 40 interviews with departmental officials, IDT executives, contractors and oversight stakeholders over six months. They reviewed more than 90 procurement documents and analysed financial records. The minister said he was already aware of the long-standing and serious allegations of financial misconduct and corruption at the IDT from the moment he stepped into his role. NOW READ: Minister hails SIU's R67 million recovery from 'corrupt' state contractor

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store