logo
NLC wins bid for two mineral blocks in Chattisgarh

NLC wins bid for two mineral blocks in Chattisgarh

The Hindu7 days ago

NLC India Limited (NLCIL) has won the bid for two critical and strategic mineral blocks in the recently concluded Tranche V auction conducted by the Ministry of Mines.
A press note said the two blocks — Raipura and Semhardih, both located in Chhattisgarh — contained reserves of phosphorite and limestone, essential minerals in India's fertilizer and industrial sectors. It was worthy to note that, with production of phosphorite from these mines, the huge dependence on import could be reduced and it would contribute significantly towards sustainability and growth of agriculture sector in the country, it added.
The Raipura Block was won with a final price offer of 8.6%, while the Semhardih Block was secured with a final offer of 11.05%. These acquisitions were aligned with NLCIL's long-term strategy to expand its presence in the mining of critical minerals, which were increasingly vital for clean energy technologies, fertilizers, electronics, and industrial processes.
The acquisition of new mineral assets to complement NLCIL's portfolio — thermal power, lignite mining, renewable energy, and upcoming green hydrogen projects — comes amid NLCIL's strategic push to diversify its resource base and play a vital role in reducing India's dependency on imports and in strengthening the country's industrial and agricultural infrastructure, the company said.
Prasanna Kumar Motupalli, CMD of NLC India Limited, stated that the acquisition of these critical mineral blocks was a significant step in supporting the government's vision of ensuring a resilient and sustainable mineral ecosystem.
Noting that phosphorite was crucial for food security and the fertilizer industry, the CMD said critical minerals would be the building blocks of new-age technologies, green energy solutions, and national prosperity in the journey towards a sustainable and decarbonised future.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Appointment orders handed over to 39 students from Project-Affected Villages
Appointment orders handed over to 39 students from Project-Affected Villages

The Hindu

time14 hours ago

  • The Hindu

Appointment orders handed over to 39 students from Project-Affected Villages

NLC India Limited (NLCIL) on Tuesday handed over appointment orders to 39 students, who had completed diploma courses in Mining Engineering from Annamalai University. The students are from Project Affected Villages (PAP) in Cuddalore district. According to a press release, the university had signed a memorandum of understanding with NLCIL for a two-year apprenticeship training with a stipend to the students completing the course at the company besides extending employment for the deserving candidates. C.G. Saravanan, Director, Mining Engineering programme, Annamalai University said that as many as 220 students have completed industrial training at NLCIL and more than 100 have got permanent placements in various posts like Surveyor, Overman and Sirdar. NLCIL also inaugurated the newly-established engineering lab and link road on the university premises under its Corporate Social Responsibility (CSR) programme. NLCIL Chairman-cum-Managing Director Prasanna Kumar Motupalli and Director (Human Resources) Samir Swarup were present.

PM Modi inaugurates Unit I of Neyveli Uttar Pradesh Power Limited's Ghatampur Thermal Power Project
PM Modi inaugurates Unit I of Neyveli Uttar Pradesh Power Limited's Ghatampur Thermal Power Project

The Hindu

time4 days ago

  • The Hindu

PM Modi inaugurates Unit I of Neyveli Uttar Pradesh Power Limited's Ghatampur Thermal Power Project

Prime Minister Narendra Modi on Friday (May 30, 2025) dedicated Unit I of the Ghatampur Thermal Power Project in Kanpur Nagar district of Uttar Pradesh to the nation. The project, inaugurated by the Prime Minister on Friday, was developed by Neyveli Uttar Pradesh Power Limited (NUPPL), a joint venture of NLC India Limited (51%) and Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL) (49%). According to a NLCIL press release, the project comprises three supercritical thermal power units of 660 MW each, adding up to a substantial 1,980 MW of installed capacity. This initiative aims to meet the growing electricity demand in Uttar Pradesh and other States, enhancing energy security, while aligning with the nation's commitment to sustainable and reliable power generation. The project cost is ₹21,780.94 crore, and the remaining two units of the Ghatampur Thermal Power Project are expected to be commissioned in 2025-26. A total of 998.81 hectares of land was acquired for its development. Project features According to NLCIL, the project has several advanced environmental technologies, including Selective Catalytic Reduction (SCR) and Flue Gas Desulphurization (FGD) technologies for reducing NOx and (SOx) emissions, respectively. The project also includes a Zero Liquid Discharge (ZLD) system in place to ensure no water is discharged from the plant. A total of 288 km of canal lining works are being undertaken to conserve 195 MLD of water by preventing seepage losses. The project is equipped with sophisticated monitoring devices, including Ambient Air Quality Monitoring Stations (AAQMS) and Continuous Emissions Monitoring Systems (CEMS).

Ghatampur thermal power project a landmark achievement: PM
Ghatampur thermal power project a landmark achievement: PM

Time of India

time4 days ago

  • Time of India

Ghatampur thermal power project a landmark achievement: PM

1 2 Kanpur: Prime Minister Narendra Modi on Friday dedicated Unit-1 (660MW) of Ghatampur Thermal Power Project and termed it as a landmark achievement. The project is a flagship initiative by Neyveli Uttar Pradesh Power Ltd (NUPPL), a collaboration of NLC India Limited (51%) and UP Rajya Vidyut Utpadan Nigam Limited (UPRVUNL) (49%). Chairman, MD NUPPL Prasanna Kumar Motupalli stated that the project has three units of 660 MW each of which, the first operating unit, commissioned in Dec 2024, was dedicated on Friday. Remaining two units are likely to be commissioned by Dec 2025. The power purchase agreement (PPA) has been made for 1487.28 MW, i.e. 75.12% of the power generated with Uttar Pradesh and 492.72 MW, i.e. 24.88% with Assam subject to actual transfer of 20% equity share of UPRVUNL in NUPPL in favour of Assam govt. With advanced technologies like Selective Catalytic Reduction (SCR) and Flue Gas Desulphurisation (FGD) for reducing NOx and (SOx) emissions, respectively and zero liquid discharge (ZLD) system, the plant would play a significant role in power production in the state, he said. It also has sophisticated monitoring devices, including Ambient Air Quality Monitoring Stations (AAQMS) and Continuous Emissions Monitoring Systems (CEMS), he added. CEO NUPPL S Durai Kumar and chief financial officer Ashok Kumar Mani were also present.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store