
Infrastructure must also safeguard health of people: Ahsan
The minister stated that the launch of this report is both timely and deeply relevant to Pakistan's national and global development goals.
Speaking to a distinguished audience comprising experts from PIDE, representatives of AIIB, development partners, and leaders from across sectors, the minister emphasised that Pakistan is standing at a critical moment, a point where infrastructure must not only support economic growth but also safeguard the health of its people and the health of the planet.
Iqbal underlined that infrastructure today encompasses much more than roads, buildings, or power plants. It is equally about the air quality, the water nation drinks, and the healthcare systems that protect its people. He said this broader definition of infrastructure touches the idea of planetary health, where human health is intrinsically linked to the health of nature and the planet.
Iqbal made clear that the Government of Pakistan is not allowing any infrastructure project to move forward unless it takes into account climate resilience, public health, and environmental protection. He affirmed that working in silos has ended, as every sector and system, be it hospitals, schools, transport systems, sewage networks, or electricity grids, must be integrated and climate-ready to remain functional and safe during natural disasters.
The minister added that the government recognises the need to reduce dependence on fossil fuels and is actively investing in solar, wind, and green hydrogen technologies as part of its transition to cleaner energy.
He stated that Pakistan is embracing nature-based solutions, highlighting ongoing initiatives such as planting mangroves along the country's coastal areas and developing green parks in cities, calling these smart, cost-effective, and equitable methods to enhance resilience.
Iqbal pointed out that the data in the AIIB report echoes Pakistan's lived reality, diseases are rising due to floods and substandard water systems, food insecurity is worsening due to changing rainfall patterns, erratic rains are contributing to higher infant mortality, and lead pollution from industries and batteries is damaging children's health and brain development.
He stressed that these phenomena are not abstract projections but are unfolding across Pakistan in real time. From floods and heatwaves to smog and water shortages, the impacts of climate inaction have become embedded in daily life. Iqbal assured that Pakistan is not beginning from scratch. The government has already started aligning national plans with the concept of planetary health.
He specifically cited the 'Uraan Pakistan' initiative and the government's Five Es Framework as part of a comprehensive national agenda to promote climate-smart, health-responsive, and inclusive infrastructure. Under Uraan Pakistan, the government has begun transitioning to zero-emission electric buses in public transport, restoring riverbanks and wetlands to reduce flooding risks and promote green tourism, and upgrading healthcare centres to make them energy-efficient and resilient in the face of disasters.
He highlighted that these efforts are well-aligned with the principles highlighted in AIIB's report, which promotes a transformative model of infrastructure that links sustainability with biodiversity conservation, public health outcomes, and climate resilience.
Citing findings from the Global Commission on Adaptation, Prof Iqbal noted that every dollar invested in climate-resilient infrastructure can generate a fourfold return by avoiding future losses. He said Pakistan is incorporating urban green infrastructure solutions, including green belts, permeable surfaces, and climate-sensitive zoning regulations, which are proven to reduce urban temperatures by up to 4°C and mitigate extreme heat, particularly in cities like Jacobabad and Lahore.
He added that the restoration of mangroves in coastal areas, already underway in Pakistan, is reducing storm damage by up to 30 to 50 percent while simultaneously improving fish livelihoods.
Concluding his address, Prof Iqbal stated that historically, infrastructure planning in Pakistan has prioritized quantity over quality and expansion over resilience. He affirmed that the government is turning this page decisively and is committed to a new era of planning grounded in the principles of climate-smart, health-protective, inclusive, and sustainable infrastructure development.
Copyright Business Recorder, 2025
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Business Recorder
14 hours ago
- Business Recorder
NHA informs Senate panel: Construction of all 5 M-6 sections to start at once
ISLAMABAD: Construction work on all five sections of Hyderabad-Sukkur Motorway (M-6) will start simultaneously in this financial year. This was stated by National Highways Authority (NHA) Chairman Muhammad Shehryar Sultan in his presentation to the Senate Standing Committee on Communications. To a query that only Rs15 billion were allocated in the Public Sector Development Programme (PSDP) for M-6, he said this amount is for overall supervision of all five sections of this project. 'Our discussions with multilateral agencies and other investors are in final stages and hopefully by March or April next year, work on all the five sections will start simultaneously,' he remarked. He clarified that that the allocated Rs15 billion could not be spend on one section because the donor agencies do not finance ongoing projects. He said for this 306km long project, the revised Rs363.70 billion cost recommended by the Central Development Working Party (CDWP), whereas, its construction period is 30months. He said sections 1 and 2 to be taken up under Public-Private Partnership (PPP) mode. Whereas, discussions held with International Finance Corporation (IFC) and Asian Infrastructure Investment Bank (AIIB), whereby, the IFC will provide transaction advisory and AIIB to provide the required Viability Gap Fund (VGF). He said fruitful discussions made under the auspices of Economic Affairs Division with OPEC Fund and SFD (Saudi Fund for Development) for taking up jointly Section 3. In parallel, Islamic Development Bank (IsDB) has indicated financing of $475 million for 4 and 5 sections. Shehryar Sultan pointed out that request for allowing advance procurement has been discussed with the IsDB and formal approval is being processed. The committee was apprised regarding the possibility of funds availability for the construction of the Sehwan Bypass under the CAREC Tranche-1 Project. The NHA chairman said the PC-1 of the CAREC Tranche-1 Project was approved by ECNEC on 26th July 2017 at a cost of Rs21 billion. Subsequently, the 1st Revised PC-I was approved by ECNEC on 30th December 2024, with an updated cost of Rs29.97billion. For the fiscal year 2025-26, an allocation of Rs1.32 billion. The project is financed by the ADB under loan amounting to $80 million, which is scheduled to close on 31st December 2025. Moreover, M/s DONGIL Engineering (Joint Venture), South Korea, has been engaged as the Design Review and Supervisory Consultant for the project. The committee was informed that Sehwan Bypass cannot be included in the ADB-funded CAREC Tranche-1 project, which is at the closing stage. The revised PC-I has been approved with a completion date of 31st December 2025, and no additional scope can be accommodated. It was noted that ADB approval and policy compliance would be required for any new works, while land acquisition funds are not available. With two sections completed and the third near completion, it was suggested that the Sehwan Bypass be taken up through a separate PC-I in the upcoming PSDP. The committee was briefed by the NHA regarding the flood-affected portion of the Indus Highway, damaged during the Manchar Lake Floods of 2022. It was informed that the segment has been restored as two-lane road. Committee members also referred to the recent Babusar Top incident, questioning why the NHA did not take preventive measures to stop tourists from entering the area despite being aware of the risks. Members pointed out that on the motorways, if a vehicle is found overspeeding, the driver is immediately detained, the family is left behind, and in some cases, rudebehaviour is reported from motorway officials. They questioned why similar strict actions could not be taken to stop tourists from heading towards hazardous areas such asBabusar Top. Furthermore, the committee directed that Motorway Police officials should be instructed to avoid misconduct with the public. In response, the chairman of the committee recommended summoning the IG Motorway Police for a detailed briefing on the matter. The committee sought a comprehensive list of 43 deputationists (BS-16 and above) serving in the National Institute of Health (NIH), including details such as names, designations, qualifications, parent departments, duration of deputation, and number of extensions granted. The NHA chairman informed that out of 20,900 employees, 43 were initially on deputation, now reduced to 39. A member termed the situation alarming, highlighting that as per court directives, deputation should not exceed three years, whereas, several officers at NHA have exceeded this limit. Concerns were raised about irrelevant postings, including MBBS/BDS doctors and officials from NDMA, whose qualifications do not align with NHA's mandate. It was questioned why such non-competitive appointments were made instead of hiring professionals through a merit-based process. Following this, the chairman committee recommended that the detailed discussion will be held in the next meeting. Copyright Business Recorder, 2025


Business Recorder
2 days ago
- Business Recorder
Ahsan for tapping mineral resources of Gwadar
ISLAMABAD: Federal Minister for Planning and Development Ahsan Iqbal emphasised on Sunday that Gwadar's vast mineral resources hold significant potential for exploration, which with the development of modern infrastructure can be fully leveraged for economic growth. During a meeting with Chinese Ambassador to Pakistan Jiang Zaidong, Iqbal reviewed the progress of the China-Pakistan Economic Corridor (CPEC) projects and discussed preparations for the forthcoming Joint Cooperation Committee (JCC) meeting, where critical decisions are expected to further enhance bilateral ties between the two countries. Iqbal noted that the first phase of CPEC had been successfully completed, with the second phase now focused on industrial cooperation, agriculture, information technology, and social development. 'Connecting CPEC to Central Asia will foster regional economic stability and broaden opportunities for economic cooperation,' he remarked. Minister urges early commencement of transshipment operations between Gwadar, Persian Gulf The minister reiterated the government's strong commitment to ensuring the security of CPEC projects, underlining that the development of Gwadar and the establishment of Special Economic Zones remain top priorities. He further stressed that Pakistan is determined to optimize the full potential of Gwadar port, particularly in terms of trade. He also highlighted ongoing collaboration with China in the agricultural sector, emphasising that agriculture graduates trained in China will be pivotal in mitigating the challenges posed by climate change in Pakistan. He added that the establishment of the Pakistan Space Centre was a project of national importance and acknowledged China's critical role in ensuring its timely completion. Ambassador Zaidong reaffirmed China's unwavering support for Pakistan's development initiatives and assured that bilateral cooperation would continue to deepen in the coming years. Federal Minister for Maritime Affairs, Muhammad Junaid Anwar Chaudhry, also participated in the meeting, which was attended by senior officials from both countries. Copyright Business Recorder, 2025


Express Tribune
2 days ago
- Express Tribune
Pakistan, China gear up for JCC talks
Pakistan and China on Sunday discussed the progress of ongoing China-Pakistan Economic Corridor (CPEC) projects and preparations for the upcoming Joint Cooperation Committee (JCC) meeting, where key decisions are expected to further strengthen bilateral ties. The development took place as Federal Minister for Planning, Development and Special Initiatives, Ahsan Iqbal met with Chinese Ambassador to Pakistan Jiang Zaidong in the federal capital. Federal Minister for Maritime Affairs Muhammad Junaid Anwar Chaudhry also attended the meeting, which was joined by senior officials from both countries, a statement said. The two sides discussed the progress of CPEC projects and preparations for the upcoming JCC meeting. Iqbal said the first phase of CPEC has been successfully completed, highlighting that the second phase focused on industrial cooperation, agriculture, information technology and social development. "Connecting CPEC to Central Asian states will contribute to regional economic stability and economic cooperation," he noted, reiterating the government's commitment to improving and ensuring the security of CPEC projects. The minister asserted that the development of Gwadar and the establishment of special economic zones remained top government priorities, adding that Pakistan was fully committed to utilising optimally the port's full capacity. He stressed that the government was committed to fully capitalising on the deep seaport's trade potential while pointing out the vast potential for mineral exploration in and around Gwadar. "With the development of modern infrastructure, its mineral resources can be fully capitalised," he said. Iqbal also discussed continued collaboration with China in the agriculture sector, observing that agriculture graduates trained in China would play a vital role in helping Pakistan address the impacts of climate change. He said the establishment of the Pakistan Space Centre was of national importance, and that China would play a pivotal role in ensuring the timely completion of this strategic project. Ambassador Zaidong reaffirmed China's commitment to supporting Pakistan's development efforts. He assured that bilateral cooperation would continue to expand in the coming years.