logo
Delhi to build 5-km tunnel from Shiv Murti to Nelson Mandela Road to ease traffic

Delhi to build 5-km tunnel from Shiv Murti to Nelson Mandela Road to ease traffic

NEW DELHI: The Delhi government on Sunday announced the construction of a tunnel from Shiv Murti–Mahipalpur to Nelson Mandela Road in Vasant Kunj to ease congestion in South Delhi and the NCR. The tunnel, featuring two underground tubes, is expected to streamline vehicular flow and significantly reduce traffic snarls.
CM Rekha Gupta said the Union Ministry of Road Transport and Highways has approved six major infrastructure projects for the capital. Among them, the 5-kilometre-long tunnel is a key initiative aimed at balancing traffic between South Delhi and NCR, curbing pollution, and enhancing the city's overall infrastructure. The project will be developed by the National Highways Authority of India (NHAI) at an estimated cost of Rs 3,500 crore.
According to the chief minister, the tunnel will include two underground tubes, one for each direction. Each tube will have three lanes, ensuring smooth traffic movement. The tunnel will also be equipped with advanced features such as electro-mechanical systems, ventilation, fire safety measures, CCTV surveillance, emergency exits, cross-passages, and control rooms.
Gupta stated that the decision came after a meeting with Union Minister Nitin Gadkari, during which infrastructure projects worth Rs 24,000 crore aimed at decongesting Delhi and its adjoining regions were cleared. She said, 'This tunnel will not only reduce the load on existing roads but will also transform the entire traffic scenario in South Delhi and surrounding areas.'
Government officials explained that the tunnel will decongest Nelson Mandela Road, Mahipalpur, and Rangpuri. It is also expected to reduce traffic on Dhaula Kuan, Rao Tula Ram Marg, and NH-48, offering a signal-free corridor connecting South Delhi with Dwarka and Gurugram.
In the long run, the tunnel will serve as a key link between Central/East Delhi and major highways including NH-44, NH-10, NH-48, NE-5, NH-709B, and the Delhi-Dehradun expressway, via the Urban Extension Road and Dwarka Expressway.
Calling it the 'foundation for the Delhi of the future,' CM Gupta said the project would commence early next year and reflects her government's commitment to a congestion-free and clean Delhi.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Market Wrap: D-Street ends higher as RBI easing, U.S. jobs data fuel rally; Sensex adds 256 pts, Nifty above 25,100
Market Wrap: D-Street ends higher as RBI easing, U.S. jobs data fuel rally; Sensex adds 256 pts, Nifty above 25,100

Economic Times

time14 minutes ago

  • Economic Times

Market Wrap: D-Street ends higher as RBI easing, U.S. jobs data fuel rally; Sensex adds 256 pts, Nifty above 25,100

Synopsis Indian benchmark indices ended Monday's session in the green, with the banking index surging to a record high during the day, lifted by the Reserve Bank of India's surprise policy easing, upbeat U.S. jobs data, and progress in U.S.-India trade talks. Indian benchmark indices ended Monday's session in the green, with the banking index surging to a record high during the day, lifted by the Reserve Bank of India's surprise policy easing, upbeat U.S. jobs data, and progress in U.S.-India trade talks. ADVERTISEMENT The BSE Sensex jumped 256.22 points, or 0.31%, to 82,445.21, while the NSE Nifty rose 100.15 points, or 0.40%, to close at 25,103.20. (You can now subscribe to our ETMarkets WhatsApp channel) SensexRBI easingNiftyU.S. jobs databanking index Nikita Papers IPO opens on May 27, price band set at Rs 95-104 per share Nikita Papers IPO opens on May 27, price band set at Rs 95-104 per share Why gold prices could surpass $4,000: JP Morgan's bullish outlook explained Why gold prices could surpass $4,000: JP Morgan's bullish outlook explained Cyient shares fall over 9% after Q4 profit declines, core business underperforms Cyient shares fall over 9% after Q4 profit declines, core business underperforms L&T Technology Services shares slide 7% after Q4 profit dips L&T Technology Services shares slide 7% after Q4 profit dips Trump-Powell standoff puts U.S. Rate policy in crosshairs: Who will blink first? Trump-Powell standoff puts U.S. Rate policy in crosshairs: Who will blink first? SEBI warns of securities market frauds via YouTube, Facebook, X and more SEBI warns of securities market frauds via YouTube, Facebook, X and more API Trading for All: Pi42 CTO Satish Mishra on How Pi42 is Empowering Retail Traders API Trading for All: Pi42 CTO Satish Mishra on How Pi42 is Empowering Retail Traders Security, transparency, and innovation: What sets Pi42 apart in crypto trading Security, transparency, and innovation: What sets Pi42 apart in crypto trading Bitcoin, Ethereum, or Altcoins? How investors are structuring their crypto portfolios, Avinash Shekhar explains Bitcoin, Ethereum, or Altcoins? How investors are structuring their crypto portfolios, Avinash Shekhar explains The rise of Crypto Futures in India: Leverage, tax efficiency, and market maturity, Avinash Shekhar of Pi42 explains NEXT STORY Business News › Markets › Stocks › News › Market Wrap: D-Street ends higher as RBI easing, U.S. jobs data fuel rally; Sensex adds 256 pts, Nifty above 25,100

SC declines urgent listing of Tamil Nadu's suit for Rs 2,291 crore education funds
SC declines urgent listing of Tamil Nadu's suit for Rs 2,291 crore education funds

United News of India

time24 minutes ago

  • United News of India

SC declines urgent listing of Tamil Nadu's suit for Rs 2,291 crore education funds

New Delhi, June 9 (UNI) The Supreme Court on Monday declined to urgently list a suit filed by the Tamil Nadu government against the Union Government, seeking the release of over Rs 2,291 crore under the Samagra Shiksha Scheme (SSS). A bench comprising Justices Prashant Kumar Mishra and Manmohan rejected the plea for early listing during the court's partial working days, observing that there was "no urgency" in the matter. Senior Advocate P. Wilson, representing the Tamil Nadu government, pressed for an urgent hearing, arguing that nearly 48 lakh students in the state were being deprived of essential education funds. 'All students in Tamil Nadu are being denied their right to education funds by the central government. The new academic year began on June 3, and admissions are underway,' Wilson submitted. When Justice Mishra enquired when the funds had stopped, Wilson responded that the funds had not been released since last year and that the original suit was filed on May 20, 2025. Despite this, the bench declined the urgent listing request. Tamil Nadu has approached the Supreme Court under Article 131 of the Constitution, accusing the Centre of unlawfully withholding funds under the SSS. The state contends that the denial is tied to its non-implementation of the National Education Policy (NEP) 2020 and the PM SHRI (Schools for Rising India) scheme. In its suit, Tamil Nadu seeks a direction for the Union Government to release the pending Rs 2,291 crore along with applicable interest. The state also seeks a declaration that making the release of SSS funds contingent upon the adoption of NEP 2020 and the PM SHRI scheme is 'unconstitutional, illegal, unreasonable, and arbitrary. UNI SNG ARN

Solar body urges govt to extend transmission fee waiver for delayed projects
Solar body urges govt to extend transmission fee waiver for delayed projects

Time of India

time26 minutes ago

  • Time of India

Solar body urges govt to extend transmission fee waiver for delayed projects

The National Solar Energy Federation of India ( NSEFI ) has urged the government to protect the viability of numerous renewable energy projects facing risks from delays beyond the control of developers, according to a person familiar with the matter. In the letter to the advisor to the Prime Minister's Office, the federation urged that the Inter-State Transmission System (ISTS) charges waiver be extended to projects getting commissioned by June 2026 and meeting a specific criterion relating to connectivity application status, financial closure, land acquisition beyond the 50 per cent threshold, and if orders for equipment have been made. The federation, representing a broad spectrum of stakeholders across the solar value chain, stated that while the ISTS waiver, originally announced by the Ministry of Power (MoP), has played a "pivotal role in making renewable power more competitive", its delayed implementation by the Central Electricity Regulatory Commission (CERC) in February 2023 left many developers in a limbo. Play Video Pause Skip Backward Skip Forward Unmute Current Time 0:00 / Duration 0:00 Loaded : 0% 0:00 Stream Type LIVE Seek to live, currently behind live LIVE Remaining Time - 0:00 1x Playback Rate Chapters Chapters Descriptions descriptions off , selected Captions captions settings , opens captions settings dialog captions off , selected Audio Track Picture-in-Picture Fullscreen This is a modal window. Beginning of dialog window. Escape will cancel and close the window. Text Color White Black Red Green Blue Yellow Magenta Cyan Opacity Opaque Semi-Transparent Text Background Color Black White Red Green Blue Yellow Magenta Cyan Opacity Opaque Semi-Transparent Transparent Caption Area Background Color Black White Red Green Blue Yellow Magenta Cyan Opacity Transparent Semi-Transparent Opaque Font Size 50% 75% 100% 125% 150% 175% 200% 300% 400% Text Edge Style None Raised Depressed Uniform Drop shadow Font Family Proportional Sans-Serif Monospace Sans-Serif Proportional Serif Monospace Serif Casual Script Small Caps Reset restore all settings to the default values Done Close Modal Dialog End of dialog window. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Unsold Container Homes in North Cotabato - Prices You Won't Believe! Shipping Container Homes | Search Ads Search Now Undo Also Read: NTPC Group starts Nokh Solar PV Project, total capacity reaches 80,708 MW ISTS charges are the fees levied for using the transmission infrastructure to move electricity between states. They are imposed to cover the costs relating to building and maintaining transmission lines and other infrastructure required for interstate electricity transfer. According to an energy expert, industry estimates state that renewable energy projects of nearly Rs 5 lakh crore would be impacted if the waiver of ISTS charges is not extended. Live Events "Several RE developers made early investments, securing land, achieving financial closure, and signing definitive agreements based on the original MoP notification," the federation said. However, due to aspects like the nearly two-year lag in CERC's ratification and other uncontrollable factors, these developers are now at risk of missing the commissioning deadline of June 30, 2025, making them ineligible for the waiver. The federation flagged multiple aspects, including prolonged approvals under Section 68(1) of the Electricity Act due to an ongoing Supreme Court case on Great Indian Bustard conservation, delay in transmission planning and connectivity effectiveness, and delayed commissioning of critical transmission infrastructure. "Several developers applied for ISTS connectivity well before June 2023, in line with the ISTS waiver policy timelines. However, the effectiveness dates for granted connectivity are being issued much later, often in 2026 or 2027, due to delays in transmission system planning and execution," the federation said. The federation has proposed a milestone-based eligibility framework for the waiver. It has recommended that projects that had applied for transmission connectivity on or before June 30, 2023, achieved financial closure, acquired at least 50 per cent of the land required for their development, and placed orders for wind turbine generators and/or inverters must be considered for the purpose of availing the ISTS waiver. It argued that the approach is consistent with CERC's regulations and recent Ministry of Power notifications granting waiver flexibility to pumped storage and battery storage projects. "The proposed eligibility criteria will ensure that only serious and committed renewable energy developers, who had factored the ISTS waiver into their project design and commercial commitments, benefit from this extension," the federation said.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store