
Uttarakhand Rain Havoc: Rockfall Damages Canopy On Haridwar-Dehradun Train Track, Services Suspended
In a statement, Himanshu Shekhar, CPRO, Northern Railways, confirmed that the damage is not major and that no loss of life has been reported
Indian Railways suspended train operations on the Haridwar-Dehradun section in Uttarakhand on Tuesday evening after a large chunk of rock fell on the track canopy near tunnel T2.
Speaking to News18, a ministry official said that the incident occurred around 6.45 pm in the single-line electrified section between Haridwar and Motichur, under the Moradabad Division. Motichur is about 50 km from Dehradun.
'The tunnel watchman reported the rockfall by phone at 6.45 pm to the Haridwar Station Master, following which engineering personnel, including the Assistant Divisional Engineer (ADEN) and Permanent Way Inspector (PWI), rushed to the site. The team reached the location by 7.30 pm to assess the damage," the official said.
The rockfall damaged a canopy structure on one vertical support, prompting authorities to suspend train movement in the section as a precautionary measure. Senior divisional officers headed to the site.
In a statement, Himanshu Shekhar, CPRO, Northern Railways, confirmed that the damage is not major and that no loss of life has been reported.
Parts of Uttarakhand on Tuesday received massive rainfall, leading to reports of damage across the state.
A massive mudslide caused by a cloudburst in Uttarkashi washed away high-altitude villages in Dharali. Four people were killed, and at least 130 people, who were initially feared trapped or missing, have been rescued. Several buildings, including 20 hotels, were washed away. The Indian Army has confirmed that nine soldiers are feared missing from a camp in the lower Harsil area.
The India Meteorological Department has predicted heavy rainfall over Uttarakhand during the next three days.
The state has been under heavy rainfall, with several people killed in the last two days. The Rudraprayag district also faced a landslide that buried two shops under boulders and debris falling from the hillside.
A man was swept away by the strong currents of the Bhakhra stream near Haldwani on Monday. On Sunday, two people drowned in a swollen stream near Bhujiyaghat on Haldwani Road.
view comments
First Published:
Disclaimer: Comments reflect users' views, not News18's. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
an hour ago
- Time of India
Heavy rainfall causes waterlogging in several parts of Haridwar; Police urges people to stay away from ghats
Heavy rainfall has caused severe waterlogging in various parts of Haridwar on Tuesday. Due to the rising water level of the Ganga River, police appeal to people to stay away from the ghats and exercise caution. Meanwhile, Northern Railways said that a boulder came on the track between the Haridwar-Motichur section on the Haridwar-Dehradun route, and traffic will be restored as early as possible. Productivity Tool Zero to Hero in Microsoft Excel: Complete Excel guide By Metla Sudha Sekhar View Program Finance Introduction to Technical Analysis & Candlestick Theory By Dinesh Nagpal View Program Finance Financial Literacy i e Lets Crack the Billionaire Code By CA Rahul Gupta View Program Digital Marketing Digital Marketing Masterclass by Neil Patel By Neil Patel View Program Finance Technical Analysis Demystified- A Complete Guide to Trading By Kunal Patel View Program Productivity Tool Excel Essentials to Expert: Your Complete Guide By Study at home View Program Artificial Intelligence AI For Business Professionals Batch 2 By Ansh Mehra View Program Northern Railways issued a statement, "Between the Haridwar-Motichur section on the Haridwar-Dehradun route, a boulder came on the track. Since the Railways had already made a canopy, no major damage took place. No injury or casualty reported. Restoration work started, and the sectional officers have reached the site. Traffic will be restored as early as possible."Northern Railways said that train number 12369 and train number 12370 (Kumbh Express between Howrah and Dehradun) and train number 12055 Jan Shatabdi Express were short-terminated at Haridwar. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like The Simple Morning Habit for a Flatter Belly After 50! Lulutox Undo Railway SP Aruna Bharti said that the work is underway on the track."At around 6.30-6.45 pm, debris and small boulders fell (on the track). Some wires broke. There have been no casualties or injuries. Janta Express is halted at Harrawala, and police are at the spot. Work is going on in the track. The scheduled trains are asked not to commence the journey. It may take 4-5 hours more to clear the track. Four to five trains are affected. Different wings of the railway department are here for rescue operations. RPF and police are here." Meanwhile, Cloudburst-triggered flash floods in Uttarakhand's Uttarkashi district on Tuesday wreaked havoc, sweeping away homes, shops, and roads, with several people feared missing. Two cloudbursts, one in Dharali and another in the Sukhi Top area, caused widespread destruction, with Dharali bearing the brunt. Reportedly, the region also suffered from mudslides and flash floods. Live Events Rescue and relief efforts are ongoing, led by the Indian Army, Indo-Tibetan Border Police (ITBP), National Disaster Response Force (NDRF), and State Disaster Response Force (SDRF). Over 130 people have been rescued so far, according to the Uttarakhand government officials. The State Emergency Operation Centre is in constant touch with the District Magistrate and SSP. The weather department has issued warnings for heavy rainfall across the state, especially in the hill districts.


News18
3 hours ago
- News18
Uttarakhand Rain Havoc: Rockfall Damages Canopy On Haridwar-Dehradun Train Track, Services Suspended
Last Updated: In a statement, Himanshu Shekhar, CPRO, Northern Railways, confirmed that the damage is not major and that no loss of life has been reported Indian Railways suspended train operations on the Haridwar-Dehradun section in Uttarakhand on Tuesday evening after a large chunk of rock fell on the track canopy near tunnel T2. Speaking to News18, a ministry official said that the incident occurred around 6.45 pm in the single-line electrified section between Haridwar and Motichur, under the Moradabad Division. Motichur is about 50 km from Dehradun. 'The tunnel watchman reported the rockfall by phone at 6.45 pm to the Haridwar Station Master, following which engineering personnel, including the Assistant Divisional Engineer (ADEN) and Permanent Way Inspector (PWI), rushed to the site. The team reached the location by 7.30 pm to assess the damage," the official said. The rockfall damaged a canopy structure on one vertical support, prompting authorities to suspend train movement in the section as a precautionary measure. Senior divisional officers headed to the site. In a statement, Himanshu Shekhar, CPRO, Northern Railways, confirmed that the damage is not major and that no loss of life has been reported. Parts of Uttarakhand on Tuesday received massive rainfall, leading to reports of damage across the state. A massive mudslide caused by a cloudburst in Uttarkashi washed away high-altitude villages in Dharali. Four people were killed, and at least 130 people, who were initially feared trapped or missing, have been rescued. Several buildings, including 20 hotels, were washed away. The Indian Army has confirmed that nine soldiers are feared missing from a camp in the lower Harsil area. The India Meteorological Department has predicted heavy rainfall over Uttarakhand during the next three days. The state has been under heavy rainfall, with several people killed in the last two days. The Rudraprayag district also faced a landslide that buried two shops under boulders and debris falling from the hillside. A man was swept away by the strong currents of the Bhakhra stream near Haldwani on Monday. On Sunday, two people drowned in a swollen stream near Bhujiyaghat on Haldwani Road. view comments First Published: Disclaimer: Comments reflect users' views, not News18's. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.


India.com
7 hours ago
- India.com
This is the last railway station of Western Railway; no train can go beyond it because..., it is...
New Delhi: The history of Indian Railways is more than 160 years old. The first passenger train in India ran from Mumbai to Thane on April 16, 1853. This marked the beginning of India's extensive railway network, which is now the fourth-largest rail network in the world. It manages a very heavy railway traffic and millions of passengers daily. The Indian Railways manages more than 7,308 stations that cater to about 13,000 trains daily, carrying upwards of 20 million passengers. Which is the last railway station of the Western Railway? Today, we will tell you one interesting fact. Do you know which is the last railway station of the Western Railway? From there, the train does not go further. The last station of the Western Railway is Churchgate Railway Station. After this, the train does not go further, because the track ends there and the sea starts ahead. Churchgate Station is named after Church Gate, a major gate of Fort St. George, a British fort built in the 17th century. This gate was demolished in the 1860s for the expansion of Mumbai, and the station was established in 1870 near the same place. When did the Indian Railway start service from this station? The Indian Railways' service started here in 1855. Churchgate station was first mentioned as a station in 1870. Earlier, Colaba station was the terminus, but in 1931, the railway line was removed and Churchgate was made the last station. The station has a total of 4 platforms. By 2010, these were extended to accommodate a 15-coach train. There are four electric tracks here, which handle the high frequency of Mumbai's local train service. What are the features of the Churchgate Station? No long-distance trains start from or end at Churchgate station, but it is the terminus of local trains on the Western Line. More than 819 trains pass through here every day. The first train from here leaves for Virar at 04:15 am, and the last train leaves for Borivali at 1:00 am. It is a major railway station, and many facilities for passengers are available here. People can sit and wait here. Proper toilets and food stalls have been set up. A big food court was also opened here in 2019. Nariman Point, Fort and Mantralaya are near this station. Marine Drive is only 400 meters away. Gateway of India, Colaba Market, Flora Fountain and Fashion Street are within a radius of 2-3 kilometers.