logo
Bad news for Shehbaz Sharif as Pakistan nears bankruptcy, will soon face Rs 650000000000 'bomb' due to....

Bad news for Shehbaz Sharif as Pakistan nears bankruptcy, will soon face Rs 650000000000 'bomb' due to....

India.com22-07-2025
Rs 7500 crore drones, intelligence and Jihad: Pakistan and this Muslim country planning big conspiracy against India, trying to…
New Delhi: Bankrupt Pakistan is likely to witness more financial crunch in the current financial year. According to the reports, if Pakistan fails to repay a debt of Rs 6.50 lakh crore (approximately USD 23 billion) during this period, a default is likely. Citing Pakistan's Economic Survey 2024–25, The News reported that the government is required to repay USD 23 billion in debt during 2025–26. Failure to do so could push the country to the brink of default.
The country's total public debt stood at Rs 76.01 trillion by the end of March 2025. This includes Rs 51.52 trillion in domestic borrowing (approximately USD 180 billion) and Rs 24.49 trillion (around USD 87.4 billion) in external loans.
The external debt is divided into two parts: funds borrowed directly by the government and loans received from the IMF. This debt has accumulated over years due to economic mismanagement, temporary funding solutions, and repeated bailouts.
However, the repayment demands for this year have exposed how little room the government has left to maneuver. USD 12 Billion in Temporary Deposits
The bankrupt Pakistan is required to repay USD 23 billion this year. To meet this obligation, USD 12 billion will be received as temporary deposit amounts from four of its friendly countries. These include USD 5 billion from Saudi Arabia, USD 4 billion from China, USD 2 billion from the United Arab Emirates, and USD 1 billion from Qatar. Here are some of the key details: Pakistan is required to repay USD 23 billion this year.
USD 12 billion will be received as temporary deposit amounts from China, UAE, Saudi Arabia and Qatar.
USD 5 billion from Saudi Arabia, USD 4 billion from China, USD 2 billion from the United Arab Emirates, and USD 1 billion from Qatar.
If any of these countries decide to withdraw their support, Pakistan will have to repay the entire amount within this year.
The News has warned that if these friendly nations refuse to extend the rollover of their deposits, the situation could deteriorate further.
This would make repayment unavoidable for the government, pushing it to rely more on diplomatic goodwill than on financial strength. And there are signs that even that goodwill is weakening. USD 11 Billion in Payments Still Pending
The Shehbaz Sharif government still has to pay around USD 11 billion to external creditors this year even if all its temporary deposits are rolled over. This includes USD 1.7 billion in international bonds, USD 2.3 billion in commercial loans, USD 2.8 billion to institutions like the World Bank, Asian Development Bank, Islamic Development Bank, and Asian Infrastructure Investment Bank, and $1.8 billion in bilateral loans.
This financial burden comes at a time when Pakistan's foreign exchange reserves are already under pressure. The country has limited sources of new income and is still awaiting a new extended programme from the IMF.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Trump announces Apple investing another USD 100 billion in US manufacturing
Trump announces Apple investing another USD 100 billion in US manufacturing

News18

time24 minutes ago

  • News18

Trump announces Apple investing another USD 100 billion in US manufacturing

Washington, Aug 6 (AP) Apple CEO Tim Cook joined President Donald Trump at the White House on Wednesday to announce a commitment by the tech company to increase its investment in US manufacturing by an additional USD 100 billion over the next four years. 'This is a significant step toward the ultimate goal of ensuring that iPhones sold in the United States of America also are made in America," Trump said at the press conference. 'Today's announcement is one of the largest commitments in what has become among the greatest investment booms in our nation's history." As part of the Apple announcement, the investments will be about bringing more of its supply chain and advanced manufacturing to the United States as part of an initiative called the American Manufacturing Programme, but it is not a full commitment to build its popular iPhone device domestically. 'This includes new and expanded work with 10 companies across America. They produce components — semiconductor chips included — that are used in Apple products sold all over the world, and we're grateful to the President for his support," Cook said in a statement announcing the investment. The new manufacturing partners include Corning, Coherent, Applied Materials, Texas Instruments and Broadcom among others. Apple had previously said it intended to invest USD 500 billion domestically, a figure it will now increase to USD 600 billion. Trump in recent months has criticised the tech company and Cook for efforts to shift iPhone production to India to avoid the tariffs his Republican administration had planned for China. While in Qatar earlier this year, Trump said there was 'a little problem" with the Cupertino, California, company and recalled a conversation with Cook in which he said he told the CEO, 'I do not want you building in India." India has incurred Trump's wrath, as the president signed an order on Wednesday to put an additional 25 per cent tariff on the world's most populous country for its use of Russian oil. The new import taxes to be imposed in 21 days could put the combined tariffs on Indian goods at 50 per cent. Apple's new pledge comes just a few weeks after it forged a USD 500 million deal with MP Materials, which runs the only rare earths producer in the country. That agreement will enable MP Materials to expand a factory in Texas to use recycled materials to produce magnets that make iPhones vibrate. Speaking on a recent investors call, Cook emphasised that 'there is a load of different things done in the United States". As examples, he cited some of the iPhone components made in the US such as the device's glass display and module for identifying people's faces and then indicated the company was gearing to expand its productions of other components in its home country. 'We are doing more in this country, and that is on top of having roughly 19 billion chips coming out of the US now, and we will do more," Cook told analysts last week, without elaborating. News of Apple's latest investment in the US caused the company's stock price to surge by 5 per cent in Wednesday's midday trading. That gain reflects investors' relief that Cook 'is extending an olive branch" to the Trump administration, said Nancy Tengler, CEO of money manager Laffer Tengler Investments, which owns Apple stock. Despite Wednesday's upturn, Apple's shares are still down by 15 per cent this year, a reversal of fortune that has also been driven by the company's botched start in the pivotal field of artificial intelligence. (AP) RC view comments First Published: August 07, 2025, 03:45 IST Disclaimer: Comments reflect users' views, not News18's. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.

Grid-linked solar panels may increase bills: KSEB
Grid-linked solar panels may increase bills: KSEB

Time of India

time28 minutes ago

  • Time of India

Grid-linked solar panels may increase bills: KSEB

T'puram: KSEB claims that grid-connected rooftop solar units are causing problems for consumers in state as they could trigger a substantial increase in power tariffs over the course of time. The power utility claimed that it sustained a loss of over Rs 500 crore in FY 2024-25 due to low daytime demand for power when these solar units produce electricity. Kerala ranks fourth nationally in terms of the installed capacity of rooftop solar units behind Gujarat, Maharashtra and Rajasthan. Despite lower overall demand, Kerala generates more solar power than Tamil Nadu, Andhra Pradesh and Karnataka. The state's installed solar capacity is twice that of Karnataka. Power demand in Kerala peaks between 6pm and 11pm. Solar prosumers—those who produce and use their own solar energy—consume only 36% of the power they generate. The rest goes into the grid. At night, they draw back 45% of the power they supplied to the grid. However, KSEB buys only 19% of the solar power produced daily. This system strains KSEB's finances because power costs more and is harder to get during peak hours. In FY 2024-25, the financial impact of this power banking arrangement exceeded Rs 500 crore. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like (1) Activate Antivirus License Now Click Here This in turn added a burden of 19 paise/unit to the electricity bills of Kerala's 1.3 crore consumers. If solar plants larger than 3 kilowatts are installed without battery storage, this additional cost will increase from the current 19 paise in coming years. KSEB estimates that by 2034-35, consumers could pay an additional 39 paise per unit. "This imposes an unnecessary financial burden on average consumers," the utility said. In a state like Kerala, where daytime usage is low, excess power produced and sent to the grid can cause high voltage on the grid, increasing the risk of damage to household appliances. In future, solar plants may need to be turned off at certain times to ensure the safety of the power distribution network. The situation highlights the challenge of balancing green energy growth with grid stability and affordable power for all consumers.

Kavi Subhash closure hits Orange Line rider count
Kavi Subhash closure hits Orange Line rider count

Time of India

time28 minutes ago

  • Time of India

Kavi Subhash closure hits Orange Line rider count

Kolkata: Since the closure of the Blue Line section at the Kavi Subhash station on July 28, the daily ridership of the Orange Line, which shares the terminal station at New Garia, has halved, sources said. The viability of the Orange Line's truncated 5.4km segment largely depended on its interface with the Blue Line at Kavi Subhash, which also has an interface with the Green Line (East-West Metro) at Esplanade. In the absence of the Blue Line, several passengers have stopped using the Orange Line. Before the shutdown, around 3,000 passengers travelled daily on the New Garia-Ruby corridor. The interface at Kavi Subhash enabled commuters to travel across Dakshineswar-New Garia (Blue Line) to Ruby (Orange Line) on a single token. They could also travel across East-West Metro or the Green Line's Howrah Maidan-Esplanade section via the Esplanade interchange, to Kavi Subhash (Blue Line) and onward to destinations on EM Bypass via the Orange Line. "After July 28, the Kavi Subhash interchange became non-functional. Barely 1,500 passengers are using the Orange Line daily now," a source said. Orange Line ticket sales at Kavi Subhash station have dropped from 1,000–1,100 to 500–600 daily, sources said. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like The Most Beautiful Women In The World Undo You Can Also Check: Kolkata AQI | Weather in Kolkata | Bank Holidays in Kolkata | Public Holidays in Kolkata "Metro Railway would earlier earn Rs 1 lakh from selling Blue Line tickets at Kavi Subhash station. For the Orange Line, the average daily ticket sales were between Rs 20,000 and Rs 22,000. Now, the average revenue from the Orange Line's ticket sales at Kavi Subhash has reduced to around Rs 10,000," a source said. The Orange Line (New Garia or Kavi Subhash)-Ruby (Hemanta Mukhopadhyay), will eventually span 30 km, along EM Bypass, Salt Lake Bypass, New Town, and VIP Road, terminating at the airport (Jai Hind Metro station). The 5.4km stretch was commissioned with 48 services in Mar 2024, running from 9 am to 4.40 pm. In Aug last year, services increased to 74. Operating duration extended to 12 hours, with the first and last trains departing at 8 am and 8 pm from both ends (Kavi Subhash and Ruby). Trains are available at 20-minute intervals as the superior signalling system or communication-based train control (CBTC) awaits the final safety approval. "Only five-day services are available. Still, around 3,000 people travelled on the Orange Line daily because they could avail of the Kavi Subhash and the Esplanade interchanges and zip across three corridors. The network has gone haywire now and the Orange Line is badly hit," an official said.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store