logo
Besraya, NPE to be closed for IJM Allianz race

Besraya, NPE to be closed for IJM Allianz race

KUALA LUMPUR: The Sungai Besi Expressway (Besraya) and New Pantai Expressway (NPE) will be closed and traffic diverted this Sunday for the IJM Allianz Duo Highway Challenge 2025.
Acting city police chief Mohamed Usuf Jan Mohamad said the event, now in its seventh edition, will begin on the NPE and involve over 13,000 runners.
The main event is the full marathon, covering 42.195km. This year's race will use both the NPE and Besraya highways.
"In addition to the full marathon, there will be 21km, 10km and 5km races. All categories will start and finish in front of Sunway Pyramid, Petaling Jaya. Runners will head towards Templer and Kuchai Lama before returning to the starting point," Usuf said in a statement today.
Usuf added that only full marathon participants will run across both highways.
"The public is advised to plan their journeys, use alternative routes, and follow traffic personnel instructions. Police and highway marshals will ensure smooth traffic flow and safety throughout the event. We apologise for any inconvenience and appreciate the public's cooperation," he said.
Affected routes on the Besraya:
Kuchai Lama (KM11.5 southbound)
U-turn to Nirvana (KM11.5 northbound)
Shell Besraya to Sungai Besi (KM13.7 southbound)
Taman Salak Jaya to Sungai Besi (KM14.4 southbound)
Salak Selatan to Sungai Besi (KM14.8 southbound)
U-turn KM15.2 southbound to Razak City
U-turn KM15.6 northbound (Median)
Loke Yew Toll Plaza to Salak Selatan (KM16.0 southbound)
City Centre to Loke Yew Toll Plaza (KMB0.4 southbound)
Jalan Istana to Loke Yew Toll Plaza (KMS2.0 eastbound)
Loke Yew Toll Plaza to Jalan Istana (KMS2.0 eastbound)
Jalan Loke Yew to Loke Yew Toll Plaza (KM19.4 westbound)
Jalan Cheras to Loke Yew Toll Plaza (KM19.4 westbound)
Loke Yew Toll Plaza to Jalan Cheras (KM19.4 eastbound)
Loke Yew Toll Plaza to Pandan Indah (KMP0.04)
Pandan Indah to Loke Yew Toll Plaza (KMP0.04)
Loke Yew Toll Plaza to Jalan Pandan 1 (KM21.2)
Loke Yew Toll Plaza to Maluri (KM21.2)
Pandan 1 to Loke Yew Toll Plaza (KM21.2)
Persiaran Pandan to Loke Yew Toll Plaza (KM21.2)
Loke Yew Toll Plaza to MRR2 (KM21.8)
MRR2 to Loke Yew Toll Plaza (KM21.8)
Affected routes on the NPE:
Kampung Pasir entrance ramp to NPE
Kampung Pasir exit ramp from NPE
Ramp from NPE to Pantai Sentral Park
Ramp from Pantai Sentral Park to NPE
NPE / Pantai Sentral Park ramp / Pantai Dalam ramp
Simpang Kuchai Maju / NPE
NPE / Kuchai Lama ramp / Sungai Besi (KM16.9 northbound)
NPE / Kuchai Lama ramp
Kuchai U-turn
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

IJM Allianz Duo Highway Challenge goes sustainable in hosting 13,000 runners
IJM Allianz Duo Highway Challenge goes sustainable in hosting 13,000 runners

New Straits Times

time2 days ago

  • New Straits Times

IJM Allianz Duo Highway Challenge goes sustainable in hosting 13,000 runners

KUALA LUMPUR: More than 13,000 runners took over the closed highways of New Pantai Expressway (NPE) and Lebuhraya Sungai Besi (Besraya) earlier today for the IJM Allianz Duo Highway Challenge 2025. Malaysians made up 80 per cent of the participants, with the remaining 20 per cent hailing from about 30 countries. The seventh edition of the running event featured multiple a 42.195km full marathon, 21km half marathon, and 10km and 5km runs. Organised in collaboration with IJM Corporation Bhd and Allianz Malaysia Bhd, this year's edition also introduced several sustainability initiatives, namely a bottle collection and recycling effort; sustainable race apparel and paperless race experience. Over 16,000 plastic bottles used during the race were collected and sent to an authorised recycling facility, ensuring zero plastic waste. Paper cups were also separated and collected for recycling. This initiative was carried out in collaboration with Trash4Cash and with the support of 286 volunteers at the water stations. This year's race apparel was made from biodegradable, high-performance recycled fabrics, a first for the event, combining eco-consciousness with athletic function. The event also adopted digital registration, race packs details and e-certificates to reduce paper consumption while improving convenience for participants IJM Corporation Bhd group chief executive officer and managing director Datuk Lee Chun Fai said the event challenged them each year to raise the bar, not just in terms of race distance, but also in how they activate their highways for the community. "Now, World Athletics-certified and with strong support from our partners, the event delivers a race that meets international standards while staying rooted in the local spirit. "From recycled race apparel to paperless race experiences, we are proud to see how the event has become a platform for healthier living, environmental responsibility and shared momentum year after year," he said. Allianz Malaysia Bhd chief executive officer Sean Wang said" "We are proud to continue our support for the IJM Allianz Duo Highway Challenge, an event that epitomises the essence of healthy living and sustainable lifestyles. "This year's edition has not only clearly reflected those values but also fostered positive change within the community as well as on the environment." Race director and managing director of EC Pixels Asia Eugene Chan said: "Seeing 13,000 runners cross the finish line is a powerful testament to our vision.

Road closures for IJM Allianz Duo Highway Run on Aug 3
Road closures for IJM Allianz Duo Highway Run on Aug 3

The Sun

time6 days ago

  • The Sun

Road closures for IJM Allianz Duo Highway Run on Aug 3

KUALA LUMPUR: Several routes along the New Pantai Expressway (NEP) and Sungai Besi Expressway (BESRAYA) will be temporarily closed from early Sunday morning for the IJM Allianz Duo Highway Challenge 2025 run. Kuala Lumpur acting police chief Datuk Mohamed Usuf Jan Mohamad said an estimated 13,000 runners will compete in the seventh edition of the race, which will start and end in front of the Sunway Pyramid shopping centre. The Aug 3 race comprises four categories - 42.195 kilometres (km) full marathon; 21km half-marathon; 10km and 5km. He added that full marathon participants will race along both major expressways, beginning by heading towards Templer and Kuchai Lama before turning back to the starting point at Sunway Pyramid. 'The affected routes on BESRAYA include Kuchai Lama, Sungai Besi, Salak Selatan, Plaza Tol Loke Yew, Jalan Istana, Jalan Cheras, Pandan Indah, Maluri, Jalan Pandan 1 and the Middle Ring Road 2 (MRR2). 'The affected routes on the NPE include the Kampung Pasir interchange, Pantai Sentral Park, Kuchai Maju, Sungai Besi and the Kuchai U-turn,' he said in a statement today. Muhamed Usuf Jan advised the public to plan their journey, use alternative routes and comply with instructions from police personnel on duty along the race route. 'Police personnel and highway traffic staff will ensure smooth traffic flow and safety during the event. Any inconvenience caused is regretted, and the cooperation from all parties is appreciated,' he said. Meanwhile, according to the race website the 42km run is slated to begin at 3 am; the 21km run at 5 am; the 10km run at 5.30 am; and the 5km run at 6.50 am. - Bernama

Several Routes Temporarily Closed For IJM Allianz Duo Highway Challenge 2025 Run
Several Routes Temporarily Closed For IJM Allianz Duo Highway Challenge 2025 Run

Barnama

time6 days ago

  • Barnama

Several Routes Temporarily Closed For IJM Allianz Duo Highway Challenge 2025 Run

KUALA LUMPUR, July 30 (Bernama) -- Several routes along the New Pantai Expressway (NEP) and Sungai Besi Expressway (BESRAYA) will be temporarily closed from early Sunday morning for the IJM Allianz Duo Highway Challenge 2025 run. Kuala Lumpur acting police chief Datuk Mohamed Usuf Jan Mohamad said an estimated 13,000 runners will compete in the seventh edition of the race, which will start and end in front of the Sunway Pyramid shopping centre. The Aug 3 race comprises four categories - 42.195 kilometres (km) full marathon; 21km half-marathon; 10km and 5km. He added that full marathon participants will race along both major expressways, beginning by heading towards Templer and Kuchai Lama before turning back to the starting point at Sunway Pyramid. "The affected routes on BESRAYA include Kuchai Lama, Sungai Besi, Salak Selatan, Plaza Tol Loke Yew, Jalan Istana, Jalan Cheras, Pandan Indah, Maluri, Jalan Pandan 1 and the Middle Ring Road 2 (MRR2). "The affected routes on the NPE include the Kampung Pasir interchange, Pantai Sentral Park, Kuchai Maju, Sungai Besi and the Kuchai U-turn,' he said in a statement today. Mohamed Usuf Jan advised the public to plan their journey, use alternative routes and comply with instructions from police personnel on duty along the race route. "Police personnel and highway traffic staff will ensure smooth traffic flow and safety during the event. Any inconvenience caused is regretted, and the cooperation from all parties is appreciated,' he said. Meanwhile, according to the race website the 42km run is slated to begin at 3 am; the 21km run at 5 am; the 10km run at 5.30 am; and the 5km run at 6.50 am.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store