logo
FREEMAN GOLD COMMENCES 34 HOLE 3,000 M RESOURCE UPGRADE AND EXPANSION DRILL PROGRAM AT THE LEMHI GOLD PROJECT

FREEMAN GOLD COMMENCES 34 HOLE 3,000 M RESOURCE UPGRADE AND EXPANSION DRILL PROGRAM AT THE LEMHI GOLD PROJECT

Cision Canada15-05-2025

VANCOUVER, BC, May 15, 2025 /CNW/ - Freeman Gold Corp. (TSXV: FMAN) (OTCQB: FMANF) (FSE: 3WU) (" Freeman" or the " Company") is pleased to announce that it has commenced resource upgrade and expansion drilling at the Lemhi Gold Project (" Lemhi", the " Project", or the " Property").
The 2025 reverse circulation (" RC") drill program is targeting 3,000 metres (approximately 34 holes) of drilling designed to:
Convert the inferred ounces from the current mineral resource estimate (" MRE") to measured or indicated (approximately 1,740 metres over 24 holes). This portion will increase the drill density within the inferred resource that is contained within the pit shell as designed as part of Freeman's Preliminary Economic Assessment (" PEA") (see Freeman's news release dated October 16, 2023); and
Complete further exploration at the open north and south extensions of the main Lemhi deposit and at the Beauty zone (approximately 1,300 metres over 10 holes). These areas give the Company the greatest chance to add near surface ounces to the existing mineral resource within and/or near the existing pit designed as part of the PEA.
There is an additional exploration target to the west, however, the high-grade mineralized zones are known to dip shallowly that direction. These targets are thus deeper than those being assessed now and will likely be part of a subsequent program that will also explore numerous regional exploration targets that are part of a filed plan of operations.
Bassam Moubarak, CEO, stated, "The 2025 RC drill program aims to both upgrade the confidence of the pit constrained resource and expand it with high-confidence exploration holes. Accomplishing these two objectives will further improve the scale and economics of the feasibility study currently being prepared by Ausenco. We will report results as they become available."
The Project is comprised of 10 patented mining claims (placer and lode), one patented mill site claim, and 332 unpatented mining claims, totaling 2,727 hectares of mineral rights and 249 hectares of surface rights. Freeman controls a 100% interest in all 11 patented claims and all 332 unpatented mining claims outright or through its wholly-owned subsidiary company. The Project is located in Lemhi County, Idaho, USA.
The 2025 drilling campaign aims to upgrade and increase the existing 2023 MRE (see Table 1). The underlying database contains a total of 525 drill holes with collar information, and assays covering 92,696m of drilling with 64,299 drill hole sample intervals. The sample database contains a total of 62,670 samples assayed for gold. The 2023 Lemhi MRE utilized 442 drill holes that intersected the estimation domains of which 284 drill holes were completed between 1983 and 1995, and 158 drill holes were completed between 2012 and 2022. Inside the mineralized domains, there is a total of 16,234 samples analyzed for gold. Freeman has incurred approximately $26 million on drilling and drilling related costs since 2019.
The 2023 Lemhi PEA outlined a high-grade, low-cost, open pit operation with an average annual production of 80,100 ounces (" oz") of gold (" Au") in the first eight years. The production strategy envisions a phased development with an increase in throughput during the fifth year of operation, with a flowsheet utilizing a carbon-in-leach processing facility.
Table 1: 2023 Lemhi Gold Project Mineral Resource Estimate
Notes:
1.
The constraining pit optimization parameters assumed US$1,750/oz Au sale price, NSR Royalty of 1%, US$2.10/t mineralized and US$2.00/t waste material mining cost, 50° pit slopes, a VAT process cost of US$8.00/t, HL process cost of US$2.40/t and a general and administration (G&A) cost of US$2.00/t.
2.
The effective date of the mineral resources estimate is March 15, 2023.
3.
See "Lemhi Gold Project NI 43-101 Technical Report and Preliminary Economic Assessment – Effective Date October 13, 2023" (https://freemangoldcorp.com/wp-content/uploads/2024/07/Preliminary-Economic-Assessment_24.08.15.pdf) for additional information.
About the Company and Project
Freeman Gold Corp. is a mineral exploration company focused on the development of its 100% owned Lemhi Gold property. The Project comprises 30 square kilometres of highly prospective land, hosting a near-surface oxide gold resource. The pit constrained National Instrument 43-101 (" NI 43- 101") compliant mineral resource estimate is comprised of 988,100 ounces gold (" oz Au") at 1.0 gram per tonne (" g/t") in 30.02 million tonnes (4.7 million tonnes Measured (168,800 oz) & 25.5 million tonnes Indicated (819,300 oz)) and 256,000 oz Au at 1.04 g/t Au in 7.63 million tonnes (Inferred). The Company is focused on growing and advancing the Project towards a production decision. To date, 525 drill holes and 92,696 m of drilling has historically been completed (Murray K., Elfen, S.C., Mehrfert, P., Millard, J., Cooper, Schulte, M., Dufresne, M., NI 43-101 Technical Report and Preliminary Economic Assessment, dated November 20, 2023; www.sedarplus.ca).
The recently updated price sensitivity analysis (see Freeman's news release dated April 9, 2025) shows a PEA with an after-tax net present value (5%) of US$329 million and an internal rate of return of 28.2% using a base case gold price of US$2,200/oz; Average annual gold production of 75,900 oz Au for a total life-of-mine of 11.2 years payable output of 851,900 oz Au; life-of-mine cash costs of US$925/oz Au; and, all-in sustaining costs of US$1,105/oz Au using an initial capital expenditure of US$215 million*.
*Note: Mineral resources that are not mineral reserves do not have demonstrated economic viability. The preliminary economic assessment is preliminary in nature, that it includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the preliminary economic assessment will be realized.
The technical content of this release has been reviewed and approved by Dean Besserer, P. Geo.,VP Exploration of the Company and a Qualified Person as defined by the NI 43-101.
On Behalf of the Company
Bassam Moubarak
Chief Executive Officer
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Cautionary Statements Regarding Forward Looking Information
This news release contains certain "forward-looking information" and "forward-looking statements" (collectively "forward-looking statements") within the meaning of applicable securities legislation. All statements, other than statements of historical fact, included herein, without limitation, statements relating to the future operations and activities of Freeman, are forward-looking statements. Forward-looking statements are frequently, but not always, identified by words such as "expects", "anticipates", "believes", "intends", "estimates", "potential", "possible", and similar expressions, or statements that events, conditions, or results "will", "may", "could", or "should" occur or be achieved. Forward-looking statements in this news release relate to, among other things, the Company's 2025 drill program, and the results therefrom, including the Company's ability to upgrade inferred resources to the measured and indicated category and potentially expand mineral resources and the impact thereon. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements reflect beliefs, opinions and projections on the date the statements are made and are based upon a number of assumptions and estimates that, while considered reasonable by Freeman, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements and the parties have made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation, the ability to complete proposed exploration work, the results of exploration, continued availability of capital, and changes in general economic, market and business conditions. Readers should not place undue reliance on the forward-looking statements and information contained in this news release concerning these items. Freeman does not assume any obligation to update the forward-looking statements or beliefs, opinions, projections, or other factors, should they change, except as required by applicable securities laws.
SOURCE Freeman Gold Corp.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Government of Canada introduces legislation to build One Canadian Economy
Government of Canada introduces legislation to build One Canadian Economy

Cision Canada

time28 minutes ago

  • Cision Canada

Government of Canada introduces legislation to build One Canadian Economy

OTTAWA, ON, June 6, 2025 /CNW/ - Today, the Honourable Dominic LeBlanc, President of the King's Privy Council for Canada and Minister responsible for Canada-U.S. Trade, Intergovernmental Affairs and One Canadian Economy, introduced new legislation to build a stronger, more competitive, and more resilient Canadian economy. One Canadian Economy: An Act to enact the Free Trade and Labour Mobility in Canada Act and the Building Canada Act, will remove federal barriers to internal trade and labour mobility, and advance nation-building projects crucial for driving Canadian productivity growth, energy security, and economic competitiveness. Advancing Major Projects The proposed legislation will accelerate the realization of major, nation-building projects that will help Canada become the strongest economy in the G7, deepen our trade relationships with reliable partners, and create good Canadian jobs. The federal government will determine whether a major project is in the national interest based on consultations with provinces, territories and Indigenous Peoples. Projects will be evaluated in accordance with the following criteria: Strengthen Canada's autonomy, resilience and security; Provide economic or other benefits to Canada; Have a high likelihood of successful execution; Advance the interests of Indigenous Peoples; and Contribute to clean growth and to Canada's objectives with respect to climate change. Projects will only be designated following full consultation with affected Indigenous Peoples. When a project is designated, it is conditionally approved upfront. The project will go through existing review processes, with a focus on "how" the project will be built as opposed to "whether" it can be. The federal major projects office will coordinate and expedite these reviews. The results, along with consultation with Indigenous Peoples, will inform a single set of binding federal conditions for the project. These conditions would include mitigation and accommodation measures to protect the environment and to respect the rights of Indigenous Peoples. The federal major projects office will include an Indigenous Advisory Council with First Nation, Inuit, and Métis representatives. The federal government will also allocate capacity funding to strengthen Indigenous Peoples' participation in this process. This legislation aligns with the Government of Canada's commitment to a 'one project, one review' approach, which means realizing a single assessment for projects and better coordination of permitting processes with the provinces and territories. The ultimate objective is to reduce decision timelines on major projects from five years down to two years. Canada will uphold its constitutional obligations to consult Indigenous groups to ensure projects proceed in ways that respect and protect Indigenous rights. We are committed to working in a way that respects our commitments to the implementation of the United Nations Declaration on the Rights of Indigenous Peoples Act and the principles of reconciliation, including economic reconciliation. Removing Internal Trade and Labour Mobility Barriers This new legislation builds one economy out of thirteen. It removes federal barriers to free trade within our borders while protecting workers, the environment and the health and safety of all Canadians. In cases where there is a federal barrier, the legislation will allow a good or service that meets comparable provincial or territorial rules to be considered to have met federal requirements for internal trade. For Canadian businesses, this will make it easier to buy, sell and transport goods and services across the country. On labour mobility, the new legislation will provide a framework to recognize provincial and territorial licenses and certifications for workers. This means that a worker authorized in provincial or territorial jurisdiction can more quickly and easily work in the same occupation in federal jurisdiction. This new legislation will make it easier to do business across Canada by removing regulatory duplication and cutting federal red tape. It will also reduce costs or delays for Canadian businesses who follow comparable provincial and territorial rules. Quotes "Canada's new government is building one Canadian economy. Today's legislation will remove federal barriers to internal trade, unleash Canada's economic potential, and get major, nation-building projects built faster across the country. It's time to build big, build bold, and build now." —The Rt. Hon. Mark Carney, Prime Minister of Canada "Our country thrives when we unite around a common purpose. In response to the evolving global trade landscape, the Government of Canada is taking decisive action to strengthen Canada's economy for generations to come. Through this legislation, we are giving ourselves the means to lift obstacles to economic growth and productivity, realize nation-building projects, create jobs and allow businesses to expand. Together with provinces and territories and Indigenous communities, we will make Canada the strongest economy in the G7." —The Honourable Dominic LeBlanc, President of the King's Privy Council for Canada and Minister responsible for Canada-U.S. Trade, Intergovernmental Affairs and One Canadian Economy "Trade within Canada is an essential driver of the Canadian economy, creating jobs, helping businesses expand, and enhancing consumer choice. Every year, more than $530 billion worth of goods and services move across provincial and territorial borders. This is equal to almost 20% of Canada's gross domestic product. That is with internal barriers holding us back. Imagine what we could achieve if people and goods flowed freely across borders in a truly unified Canadian market." —The Honourable Chrystia Freeland, Minister of Transport and Internal Trade "This new legislation is about building a stronger, more connected Canada—by making it easier to trade, faster to build big projects, and better at creating good opportunities for people, businesses, and Indigenous communities from coast to coast to coast. Energy and natural resources are Canada's power, and we will deliver projects that leverage these assets in order to strengthen our security, sovereignty, and economy." Associated Links Internal Trade Clean Growth Office First Ministers' statement on building a strong Canadian economy and advancing major projects Prime Minister Carney meets with premiers and shares his plan to build one strong Canadian economy Stay Connected SOURCE President of the King's Privy Council for Canada and Minister responsible for Canada-U.S. Trade, Intergovernmental Affairs and One Canadian Economy Contact : For more information (media only), please contact: Gabriel Brunet, Office of the Honourable Dominic LeBlanc, President of the King's Privy Council for Canada and Minister responsible for Canada-U.S. Trade, Intergovernmental Affairs and One Canadian Economy, 819-665-6527, [email protected]; Laura Scaffidi, Office of the Honourable Chrystia Freeland, Minister of Transport and Internal Trade, 613-993-0055, [email protected]; Carolyn Svonkin, Office of the Honourable Tim Hodgson, 343-597-1725, [email protected]; Media Relations, Privy Council Office, 613-957-5420, [email protected]

AI-Powered Vehicle Inspection Company iNeedaPPi Expands Across Canada, Offering Fast, Affordable, and Transparent Used Car Evaluations
AI-Powered Vehicle Inspection Company iNeedaPPi Expands Across Canada, Offering Fast, Affordable, and Transparent Used Car Evaluations

Cision Canada

timean hour ago

  • Cision Canada

AI-Powered Vehicle Inspection Company iNeedaPPi Expands Across Canada, Offering Fast, Affordable, and Transparent Used Car Evaluations

TORONTO, June 6, 2025 /CNW/ -- iNeedaPPi Mobile Car Inspectors, a Canada-based company known for its technology-driven approach to used vehicle inspections, has expanded across the Canadian market with operations available in and around Toronto, Vancouver, Calgary, and Edmonton. The service addresses long-standing concerns among used car buyers—namely, how to confidently evaluate a vehicle's condition without relying on the seller or traditional, often inconsistent inspection processes. "Our mission is simple," said CEO Joseph O'Reilley. "To save people from junk cars by bringing transparency and trust to an industry where buyers often feel left in the dark. We're proving that buying a used car doesn't have to be scary." Post this The company leverages AI technology, machine learning, and proprietary tools to ensure every inspection is thorough, consistent, and unbiased, regardless of who performs it or where. This data-centric model aims to improve trust and transparency in an area of the automotive industry where both are often lacking. Mobile, Same-Day Car Inspections for Only $169.99 iNeedaPPi offers on-location pre-purchase inspections that are typically completed within the same day, priced at $169.99. Once a buyer places an order through the website, iNeedaPPi coordinates directly with the seller to schedule the inspection. The buyer then receives a comprehensive report via email—no coordination or in-person meetings required. Visual, Evidence-Based Reporting Inspection reports are built for clarity and visual understanding. Each includes: Over 50 high-resolution photos Video documentation showing the vehicle in action A detailed condition score out of 100 Objective summaries and visual evidence of any issues These features are designed to reduce ambiguity and give buyers the ability to make fully informed decisions without relying solely on trust or vague descriptions. Added Tools for Buyer Confidence Customers can add a $25 Market Price Appraisal at checkout to learn what a vehicle is really worth in today's market. For additional peace of mind, iNeedaPPi now also offers optional post-purchase warranty coverage, with plans starting at just $49 for 90 days. A Smarter Way to Buy Used By combining speed, affordability, and technological innovation, iNeedaPPi aims to transform how Canadians shop for used vehicles. With fast service, unbiased results, and no pressure to buy, it offers a modern alternative to the traditional, often stressful, car-buying experience. As more buyers turn to private sellers and online marketplaces, iNeedaPPi arrives at a critical time—making it easier than ever to buy used with clarity, protection, and confidence.

Net income and investments increased more than 25% in the first quarter of 2025 Français
Net income and investments increased more than 25% in the first quarter of 2025 Français

Cision Canada

timean hour ago

  • Cision Canada

Net income and investments increased more than 25% in the first quarter of 2025 Français

MONTRÉAL, June 6, 2025 /CNW/ - Hydro-Québec reported net income of $2,056 million for the first quarter of 2025, up $480 million compared to the same period in 2024. This is mainly due to favourable weather conditions in all of its markets. In addition, Hydro-Québec continues to invest in the rollout of the Action Plan 2035. An amount of $1.4 billion was invested in the first three months of 2025, an increase of more than 25% compared to last year. These investments are aimed specifically at improving the quality of service offered to customers. "The solid financial performance in the first quarter of 2025 is mainly due to a colder winter than last year," said Maxime Aucoin, Executive Vice President and Chief Financial Officer. "In Québec, winter temperatures greatly contributed to an increase in sales, while on external markets, they allowed us to benefit from high export prices. To ensure the best possible use of our water resources, we continue to take a cautious approach to managing our energy reserves." Financial highlights for the first three months Hydro-Québec's plan: Milestones for early 2025 Positive progress in negotiations on an agreement with Newfoundland and Labrador Launch of the most ambitious energy efficiency pathway in Hydro-Québec's history Investments of $10 billion by 2035 Smart thermostats at $0 for residential customers Signing of several new agreements Partnership announced for wind power development in the Nutinamu-Chauvin area (Saguenay–Lac-Saint-Jean) for a project of up to 1,000 MW of capacity by 2035 Collaborative agreement signed with Makivvik Corporation to promote economic development in Nunavik First electricity supply contracts signed for two wind power projects in Quaqtaq and Puvirnituq (with Tarquti Energy) Unveiling of a scalable approach to solar development Goal of developing 3,000 MW of solar power by 2035 First call for tenders for solar farms (300 MW) announced in Hydro-Québec's history For more information on Hydro-Québec's results for the first quarter of 2025, visit .

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store