logo
Tanzania, Burundi launch construction of $2bln joint SGR project

Tanzania, Burundi launch construction of $2bln joint SGR project

Zawya3 days ago
Burundi and Tanzania on Saturday kicked off the construction of the cross-border standard gauge railway line, marking a milestone in the countries' infrastructure development.
President Burundi Evariste Ndayishimiye and Tanzanian Prime Minister Kassim Majaliwa officially launched the construction of the line from Uvinza in Tanzania to Musongati in Burundi, which will cover 282km and cost $2.154 billion.
This project marks a key step in regional integration and economic development for both countries. Once completed, the line will give Burundi direct access to the Port of Dar es Salaam and enhance export of minerals as well as ease importation of goods.
It aligns with the Central Corridor project, whose main goal is to boost East and Central Africa integration through modern infrastructure, linking landlocked countries such as Burundi, Rwanda, Uganda, Democratic Republic of Congo (DRC) and Zambia to the port of Dar es Salaam.
Mr Majaliwa said the project would enhance trade and investment in the region, delivering goods in a single day. It currently takes more than a week to move from the Port of Dar es Salaam to Bujumbura.
Currently, the port of Dar es salaam handles 80 percent of the Central Corridor cargo.
President Ndayishimiye termed it a dream come true, saying the project aligns with his government's Vision 2040-2060.
The railway will be crucial in moving Burundi's nickel, lithium, and cobalt, whose export will generate significant revenues for the economy.
The Uvinza-Musongati railway project is being executed in two phases: The first will stretch 180km connecting Uvinza to Malagarazi in Tanzania and the second will stretch 102km linking Malagarazi to Musongati in Burundi, and later extend to Uvira and Kindu in the DRC.
The Burundi stretch is funded by the African Development Bank (AfDB).
The completion of the railway will see the country move away from road transport, reducing transport time and costs, road accidents and road maintenance costs.
The six-year construction contract was signed in January in Dar es salaam by the government of Burundi and the government of Tanzania represented by ministers of infrastructure; the China Railways Engineering Group Limited (CREGC); and the China Railway Engineering Consulting group Co Ltd (CREDC).
© Copyright 2022 Nation Media Group. All Rights Reserved. Provided by SyndiGate Media Inc. (Syndigate.info).
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Azizi completes 70% work on Riviera Beachfront I project
Azizi completes 70% work on Riviera Beachfront I project

Zawya

time10 hours ago

  • Zawya

Azizi completes 70% work on Riviera Beachfront I project

UAE-based Azizi Developments has announced that 70 per cent of the work has been completed on its premium Beachfront I project in Riviera, its French Mediterranean-inspired waterfront community in MBR City, Dubai. Giving a project update, Azizi said the project's structure is fully ready, with blockwork and internal plastering standing at 98 per cent completion. Tiling works have reached 50 per cent, while HVAC and MEP installations stand at 83 per cent and 68 per cent, respectively. Façade works are at 29 per cent, external works are at 15 per cent, and overall finishes have progressed to 49%, it stated. Supported by a workforce of 3,200, construction remains firmly on track for completion in Q4 2025, it added. Group CEO Farhad Azizi said: "Beachfront in Riviera is rapidly taking shape, showcasing our dedication to delivering communities that perfectly blend sophistication with functionality." "As we move closer to completion, our focus remains on surpassing the expectations of our valued investors and end-users, while further enriching Dubai's skyline with developments that will stand the test of time," he added. On completion, the Riviera Beachfront will boast three 20-storey developments offering 555 units across studios, one- and two-bedroom homes, and retail spaces. Each building, set on the shores of Azizi's 2.7-km-long swimmable crystal lagoon, features direct beach access, swimming pools, landscaped surroundings, fully equipped gyms, barbeque areas, children's playgrounds and games, and yoga spaces, among other carefully thought-out amenities, it added. Copyright 2025 Al Hilal Publishing and Marketing Group Provided by SyndiGate Media Inc. (

Oman: 14km coastal road for Duqm Tourism Zone
Oman: 14km coastal road for Duqm Tourism Zone

Zawya

time13 hours ago

  • Zawya

Oman: 14km coastal road for Duqm Tourism Zone

DUQM: The Public Authority for Special Economic Zones and Free Zones (OPAZ) has awarded a contract for the construction of a dual carriage coastal road in the tourism zone of the Special Economic Zone at Duqm (SEZAD). The road will extend 14 kilometers, connecting the tourism area with the fishing port and the fisheries and food industries complex. The project consists of two lanes in each direction and includes four main roundabouts, surface water drainage systems with modern infrastructure, as well as signage, concrete and steel barriers, and service facilities. This comes as part of an integrated plan to develop the transport system within the master plan of the zone. Eng. Ahmed bin Ali Akaak, CEO of the Special Economic Zone at Duqm, stated that the coastal road project represents a qualitative addition to the infrastructure of the tourism zone in Duqm, adhering to the highest engineering standards in quality and traffic safety. He added that the project enhances the area's attractiveness for tourism investments and related economic activities. The road will pass through scenic landscapes varying between seashores, natural hills, and future development projects, offering visitors a unique experience and boosting the vitality of the tourism sector. The tourism zone spans around 30 square kilometers, of which 15 square kilometers directly overlook an 18-kilometer waterfront, while the remaining area lies on nearby highlands, offering distinctive diversity for tourism activities. Work is underway to develop the detailed master plan, ensuring the distribution of tourism activities, defining architectural façade requirements, and establishing artificial development projects that enhance the zone's beauty and capacity to attract domestic and international tourism. The project has strategic significance, directly linking the tourism zone with the fishing port and Duqm Airport. The road provides direct access between hotels, resorts, and leisure facilities, supporting current and future tourism investments, reinforcing Duqm's position as a promising tourism destination, contributing to the national economy, and supporting Oman's economic diversification plans. 2025 © All right reserved for Oman Establishment for Press, Publication and Advertising (OEPPA) Provided by SyndiGate Media Inc. (

Ghana: Mahama meets Japanese PM; discusses 3 key issues to deepen cooperation
Ghana: Mahama meets Japanese PM; discusses 3 key issues to deepen cooperation

Zawya

time15 hours ago

  • Zawya

Ghana: Mahama meets Japanese PM; discusses 3 key issues to deepen cooperation

Ghana and Japan have signalled a new push to deepen economic cooperation and accelerate priority infrastructure projects during a bilateral meeting between President John Dramani Mahama and the Prime Minister Shigeru Ishiba of Japan on the sidelines of TICAD 9 in Yokohama. President Mahama acknowledged Ghana's central role in Japan's cocoa supply, noting that Ghana accounts for about 70% of Japan's cocoa imports. He encouraged Japanese firms to expand investments in Ghana's cocoa value chain, including a public–private partnership with the Cocoa Processing Company to revamp the plant and boost value addition. The President also highlighted upcoming milestones in Ghana–Japan relations, including the centenary of Dr. Hideyo Noguchi's arrival in Ghana and the 50th anniversary of the Japan Overseas Cooperation Volunteers (JOCV) in 2027—anniversaries he previously discussed with H.E. Hiroshi Yoshimoto, Japan's Ambassador to Ghana. On infrastructure, President Mahama stressed the strategic importance of the Volivo Bridge over the Volta River, a critical component of Ghana's Eastern Corridor that links Accra and Tema to the north and onward to Burkina Faso and Niger. He emphasised the bridge's role in moving agricultural produce such as yams and maize from northern Ghana to markets in the south. Mr Mahama also expressed appreciation to the Government of Japan for the JPY 11.239 billion loan signed on 5 December 2016 for the project and reaffirmed Ghana's request for additional support—especially grants—to close the remaining 64% procurement gap. Prime Minister Shigeru Ishiba welcomed closer collaboration with Ghana to expand infrastructure development and recalled the long-standing partnership that helped establish the Noguchi Memorial Institute for Medical Research. He acknowledged that Japanese chocolate lovers depend largely on Ghanaian cocoa. Reiterating Japan's commitment to Ghana's development priorities, the Prime Minister gave an assurance that Tokyo would work to expedite solutions to funding gaps to ensure the successful completion of key projects. He also sought Ghana's support for Japan's candidate, Masahiko Metoki, for the position of Director General of the Universal Postal Union's International Bureau and Ghana's backing for Japan's positions on reforms to make the United Nations Security Council more democratic. The Tokyo International Conference on African Development brings together African leaders, Japan, and international partners to advance sustainable development and investment across the continent. Distributed by APO Group on behalf of The Presidency, Republic of Ghana.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store