
UAE Lottery: 7 residents bag Dh100,000 each in 13th lucky chance draw
The 13th draw of the Lucky Day, Lucky Chance draw at the UAE Lottery brought life-changing news to seven participants on Saturday, May 31, with each winning Dh100,000 in the weekly Lucky Chance raffle.
The jackpot-winning numbers — days 3, 8, 18, 22, 25, and 31 followed by the month 7.
Lucky Chance Draw Nunber 250531 announced the following winning ticket numbers:
BH3282182
CH5863285
CH5844534
BJ3445984
CL6274201
BE2929558
DC7937029
Each of these ticket holders is now Dh100,000 richer, a reward that could help fulfill long-held dreams, cover family expenses, or support education and savings goals.
The UAE's first and only regulated lottery was launched in December last year, offering a Dh100-million jackpot. Depending on how many numbers are matched, players can take home prizes ranging between Dh100 and Dh100 million.
While the odds of winning the jackpot are one in over 8 million, "someone in the UAE will win the Dh100 million for sure," Bishop Woosley, director of Lottery Operations at The Game, which operates UAE Lottery, had earlier told Khaleej Times.
Asked if the company was working to better the odds, Woosley had said they were looking at 'player preferences, what they play, how much they play and what games they like.'
The lottery is for residents aged 18 and above in the UAE. Players are not allowed to participate in the games unless they are physically present in the country at the time of playing.
As of now, the prizes are not subject to any taxes.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Zawya
15 minutes ago
- Zawya
Scientific and Medical Equipment renews $76mln credit facility with BSF
Scientific and Medical Equipment House Company has renewed a Shariah-compliant credit facility of 284 million Saudi riyals ($75.70 million) with Banque Saudi Fransi (BSF). The facility will be used to finance ongoing and future projects, issue bank guarantees, and cover letters of credit, the company said in a statement to the Saudi stock exchange. The collateral includes contract proceeds and promissory notes worth SAR 284 million. The facility will mature on April 30, 2026, the statement said. (Editing by Seban Scaria


Zawya
15 minutes ago
- Zawya
Oman's HyDuqm expects FID in 2027
Hydrogen Duqm (HyDuqm), one of nine large-scale green hydrogen and ammonia projects currently in early development in Oman, anticipates a Final Investment Decision (FID) in 2027, with production slated to commence in 2030. HyDuqm is a joint venture comprising POSCO Holdings, Samsung Engineering , Korea East-West Power Company, Korea Southern Power Company , MESCAT Middle East DMCC (a subsidiary of ENGIE from France), and FutureTech Energy Ventures (FTEV) - the clean energy arm of Thai energy conglomerate PTTEP. In 2023, the JV partners won a concession from Hydrom, the master-planner of Oman's green hydrogen economy, to develop a GH2 project in Block Z1-02 in Al Wusta Governorate. The project targets an annual capacity of 1.2 million tonnes of green ammonia, focusing on clean energy production from green hydrogen. According to PTTEP subsidiary FTEV, the partners of HyDuqm are currently 'in the process of assessing wind and solar energy potential (Renewable Resource Assessment) and conducting a feasibility study to evaluate the investment value and profitability of the project prior to starting engineering design'. FTEV's role as a JV partner in HyDuqm is the latest addition to parent organisation PTTEP's expanding presence in Oman's energy industry. 'This investment supports the growth of new businesses aligning with the Company's business plan and provides an opportunity to apply knowledge and experience in green hydrogen production in Thailand, in line with future energy policies,' PTTEP noted in its recently issued 2024 Annual Report. 'PTTEP completed the installation of wind and solar potential measurement stations and has begun collecting data to support the project operations. The ongoing feasibility study phase includes geographical, geotechnical, and hydrological assessments, as well as a Preliminary Environmental and Social Impact Assessment (Pre-ESIA),' it said. The feasibility study, according to the Thai state-owned energy giant, will also help determine the amount of required capital expenditure and economic return before proceeding to the engineering design phase in 2025. (Writing by Nadim Kawach; Editing by Anoop Menon)


Zawya
15 minutes ago
- Zawya
Abu Dhabi's Al Seer Marine sets up tanker JV, secures $57mln ADCB term loan
Abu Dhabi's Al Seer Marine, a subsidiary of International Holding Company (IHC), has set up a joint venture (JV) with B International Shipping & Logistics that will own and operate liquefied petroleum gas (LPG) and product tankers. The JV, ASBI Shipping, acquired two LPG tankers backed by a 10-year charter with BGN INT DMCC, a subsidiary of BGN, in a deal that guarantees 660 million dirhams ($180 million) in revenue through 2035, the ADX-listed shipper said. Abu Dhabi Commercial Bank (ADCB) has provided AED 210 million in senior secured term financing with a seven-year tenor, secured against the vessels and their cash flows. Al Seer Marine's portfolio includes commercial shipping, yachting, boat building, unmanned vessel platforms and capabilities, and cutting-edge technological innovations. (Writing by Brinda Darasha; editing by Seban Scaria)