logo
Industrialised Building System use encouraged: Maslan

Industrialised Building System use encouraged: Maslan

Daily Express18-07-2025
Published on: Friday, July 18, 2025
Published on: Fri, Jul 18, 2025 Text Size: Ahmad Maslan said the move could help reduce costs and construction time, while also minimising the risk of damage to IBS materials. - Bernama pic for illustration only. TAWAU: Contractors using the Industrialised Building System (IBS) in government and major projects are encouraged to produce components in situ or adjacent to the project site. Deputy Works Minister Datuk Seri Ahmad Maslan said the move could help reduce costs and construction time, while also minimising the risk of damage to IBS materials.
Advertisement 'This came after I agreed to the proposal by the contractor for the Armed Forces Family Housing (RKAT) project at Kabota Camp here to establish a temporary site for IBS components. 'It is more economical if the IBS material moulds are made in situ. I believe this is a good solution for government projects. 'Otherwise, the materials would have to be transported by trailer from the Sedco factory in Kota Kinabalu,' he told reporters after inspecting the progress of the additional multi-class RKAT construction project, here, Thursday. According to him, transporting materials to Tawau by trailer took 12 hours and posed various risks, including possible damage to IBS poles. Meanwhile, Ahmad said the additional multi-class RKAT construction project at Kabota Camp, worth RM97 million, must be completed by Oct 31 next year, as scheduled. 'There will be no third extension of time (EOT). Two EOTs have already been granted. This is a very urgent and necessary project. Once completed, it will greatly benefit military personnel and their families by easing their burden of high rental costs outside,' he said. The project at Kabota Camp comprises nine blocks of Class G, C1, E and F apartment units, as well as bungalows, semi-detached houses, a multipurpose court and a playground.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

DBKL Targets 762,500 Housing Units Under PTKL2040
DBKL Targets 762,500 Housing Units Under PTKL2040

Barnama

time24 minutes ago

  • Barnama

DBKL Targets 762,500 Housing Units Under PTKL2040

GENERAL KUALA LUMPUR, Aug 5 (Bernama) – Kuala Lumpur City Hall (DBKL) aims to provide up to 762,500 housing units by 2040, in line with the direction of the Kuala Lumpur Local Plan 2040 (PTKL2040), which focuses on the well-being of urban residents. Kuala Lumpur Mayor Datuk Seri Dr Maimunah Mohd Sharif said the housing stock as of 2020 stood at 500,803 units, comprising both open market housing and affordable housing. "Over the next 15 years, new housing development will be planned based on the increasing number of residents and households in the capital. 'Housing planning will emphasise the needs of various groups, including youth, B40 and M40 families, senior citizens and other vulnerable communities,' she told Bernama. She said the plan also introduces the provision of micro and transit units for newly working youths, compact housing for dual-income, no-kids (DINK) couples and young professionals, as well as age-friendly housing for the elderly. Maimunah said DBKL has also allocated several specific land-use zones for housing, including Residential Zone 4 (R4), designated for affordable and public housing. She said PTKL2040 emphasises the principle of inclusive development by maintaining a balance between the need for housing, access to public transportation and environmental sustainability. She added that the housing target also takes into account the potential for redevelopment of existing areas and the provision of government land in strategic locations within the city. 'The pricing of affordable housing is subject to the National Affordable Housing Policy, with a maximum price set at RM300,000 per unit, in line with initiatives such as Residensi Wilayah.

13MP reflects government's commitment to fiscal discipline
13MP reflects government's commitment to fiscal discipline

The Star

time24 minutes ago

  • The Star

13MP reflects government's commitment to fiscal discipline

A new course: Civil servants watching the live broadcast of the 13MP presentation by Anwar in Putrajaya. — Bernama KUALA LUMPUR: The recent tabling of the 13th Malaysia Plan (13MP) reflects the government's commitment to charting a sustainable development path while exercising fiscal prudence to help reduce the national deficit, said Universiti Kebangsaan Malaysia economic analyst, Associate Professor Dr Mustazar Mansur. He said Prime Minister Datuk Seri Anwar Ibrahim is taking the country's debt situation seriously, with a clear focus on curbing new borrowings and narrowing the fiscal deficit. "When the deficit declines, debt levels also fall. We've heard the Prime Minister previously speak about limiting new borrowings, and he is clearly committed to avoiding excessive debt,' he said. Mustazar was speaking as a guest on Bernama TV's Ruang Bicara programme yesterday, in an episode titled '13MP: The People's Socioeconomic Agenda and Hopes'. According to the 13MP blueprint, ongoing fiscal consolidation efforts are expected to narrow the fiscal deficit to below three per cent of gross domestic product (GDP) and keep the federal debt level under 60 per cent of GDP. Commenting on the development allocation for Kota MADANI, Mustazar said the initiative reflects a public-private partnership model. "The government will not spend directly but instead grant concessions to qualified private firms. Hence, not everything announced by the government will involve direct fiscal commitments. "The government will leverage private sector expertise-firms that are more experienced, willing to take risks, and capable of assessing the viability of projects,' he added. 13MP, tabled by the Prime Minister in the Dewan Rakyat, outlines the country's development agenda for 2026-2030, with a total allocation of RM611 billion. - Bernama

DBKL targets 762,500 housing units by 2040 under KL plan
DBKL targets 762,500 housing units by 2040 under KL plan

New Straits Times

timean hour ago

  • New Straits Times

DBKL targets 762,500 housing units by 2040 under KL plan

KUALA LUMPUR: Kuala Lumpur City Hall (DBKL) aims to provide up to 762,500 housing units by 2040, in line with the direction of the Kuala Lumpur Local Plan 2040 (PTKL2040), which focuses on the well-being of urban residents. Kuala Lumpur Mayor Datuk Seri Dr Maimunah Mohd Sharif said the housing stock as of 2020 stood at 500,803 units, comprising both open market housing and affordable housing. "Over the next 15 years, new housing development will be planned based on the increasing number of residents and households in the capital. "Housing planning will focus on the needs of various groups, including youth, B40 and M40 families, senior citizens and other vulnerable communities," she told Bernama. She said the plan also introduces the provision of micro and transit units for newly working youths, compact housing for dual-income, no-kids (DINK) couples and young professionals, as well as age-friendly housing for the elderly. Maimunah said DBKL has also allocated several specific land-use zones for housing, including Residential Zone 4 (R4), designated for affordable and public housing. She said PTKL2040 emphasises the principle of inclusive development by maintaining a balance between the need for housing, access to public transportation and environmental sustainability. She added that the housing target also takes into account the potential for redevelopment of existing areas and the provision of government land in strategic locations within the city. "The pricing of affordable housing is subject to the National Affordable Housing Policy, with a maximum price set at RM300,000 per unit, in line with initiatives such as Residensi Wilayah. "For the Residensi Madani scheme, the maximum selling price is set at RM200,000 with a standard size of 800 square feet, while other units will be developed to meet the diverse needs of the urban community," she said. Maimunah said PTKL2040 targets at least 40 per cent of all new housing units by 2040 to be affordable homes. The long-term plan also outlines the definition of affordable housing under two categories: rental units such as the People's Housing Project (PPR), Public Housing and Subsidised Rental Housing (PASS); and ownership units covering projects like Residensi Wilayah, Residensi Madani, the Malaysia Civil Servants Housing Programme (PPAM), PR1MA and One Staff Member One Home (SASaR).

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store