
Ghaziabad: NCRTC plans new FOB to link ISBT Kaushambi to RRTS Anand Vihar station
A foot overbridge (FOB) will be built to connect the RRTS station in Anand Vihar, Delhi with the Kaushambi ISBT across the road in Ghaziabad, officials said on Thursday.
The proposed FOB will be 200-250 metres long with travelators, which are moving walkways or autowalks. Currently the two stations are separated by the Inner Ring Road, and the stretch also gets congested during peak hours.
'Anand Vihar has a high footfall. An FOB will better connect the Namo Bharat station in Anand Vihar with the ISBT in Kaushambi. It will be equipped with travelators. We have also floated a tender for the project,' said Puneet Vats, chief public relations officer of NCR transport corporation (NCRTC), the agency executing the Regional Rapid Transit System (RRTS) project.
The 82km-long RRTS project is in its final stages and scheduled for completion in June. It will connect Delhi, Ghaziabad and Meerut with the Namo Bharat trains. At present, 55km of the total corridor is operational, with Anand Vihar station emerging as a major multi-modal hub with connectivity to Metro trains, railways and ISBTs.
'The ISBT at Kaushambi and Anand Vihar are located on the Delhi-Ghaziabad border get a large footfall of passengers, including senior citizens, children, women, differently abled people and those with a lot of luggage. So an FOB with facilities is needed. With many transport systems in place at Anand Vihar, people need to get easy access,' said VK Mittal, former president of Kaushambi apartments resident welfare association.
A major redevelopment is planned for the ISBT at Kaushambi in Ghaziabad, with modern facilities built over an area of 24,284sqm at a cost of ₹261 crore. NCRTC has begun construction work on another FOB near its Ghaziabad station, which is near the existing New Bus Adda station of Ghaziabad Metro's Red Line. The two stations are located near the Meerut tri-intersection roundabout, which get footfall of thousands of passengers and commuters per day. But the link between the Metro and Namo Bharat station is devoid of any FOB at present.
'The work is speeding fast for the FOB connecting Namo Bharat's Ghaziabad and metro station. The FOB will be 300 metres long with travelators. The construction work will get complete in the next three-four months but all facilities such as travelators will be built by the end of 2025,' Vats added.
On Wednesday, NCRTC also announced the completion of civil construction of 280-metre long FOB connecting Namo Bharat's Sarai Kale Khan to Hazrat Nizamuddin railway station in Delhi.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Hindustan Times
2 days ago
- Hindustan Times
Lucknow-Kanpur rapid rail clears final hurdle, promises sub-hour commute
Now that Lucknow Development Authority has approved the proposed rapid rail corridor between Lucknow and Kanpur, decks have been cleared for the project to move into the implementation phase. The corridor, dubbed 'NaMo Corridor', will enable high-speed trains to operate at 160 km per hour, bringing down the travel time between the two cities to just 40 to 50 minutes. National Capital Region Transport Corporation (NCRTC) had proposed the rapid rail in 2015, but the progress was hampered by multiple delays, including disruptions during the Covid-19 pandemic. Authorities in Kanpur and Unnao had already granted necessary clearances to the project. With LDA issuing its no-objection certificate (NOC) on Wednesday, the project has crossed its final administrative hurdle. The project will mirror the ongoing Delhi-Meerut RRTS, which is already in advanced stages of development. High-speed trains, smart ticketing, automatic train doors, and advanced safety systems are expected to be the standard on the Lucknow-Kanpur line as well. Additionally, the development will follow a transit-oriented approach, ensuring that stations act as hubs for commercial and residential growth. 'LDA has approved the project under the condition that it aligns with Lucknow's master plan. The work is expected to be completed within five years,' said Prathamesh Kumar, vice-chairman, LDA. With the NOC now in place, NCRTC is expected to finalise the detailed project report (DPR), followed by tendering, land acquisition, and the beginning of the construction work. If completed on schedule, the Lucknow-Kanpur rapid rail would become Uttar Pradesh's first regional rapid transit system. All-weather op, impetus to infra The proposed route will start from the Amausi airport in Lucknow and pass through Bani, Unnao, Jaitipur, Ajgain, and Magarwara before reaching Ganga Barrage in Kanpur. Plans include its integration with the metro systems in both Lucknow and Kanpur. Designed to operate in foggy, rainy, and adverse weather conditions, the rapid rail will be equipped with state-of-the-art systems. Officials say that the service will not be affected by seasonal disruptions, a key factor in a region known for winter fog and erratic monsoons. Apart from improving intercity travel, the corridor is expected to provide a major boost to regional infrastructure, particularly in Unnao, where warehousing zones and industrial hubs are being planned along the route. The alignment also supports planned residential zones closer to Kanpur's outskirts, opening new opportunities for housing and real estate development.


Hans India
5 days ago
- Hans India
Tamil Nadu Approves New Chennai Metro Line from Poonamallee to Parandur
The Tamil Nadu government has given permission to build a new metro train line. This means they have agreed to start the project. The new train will travel from a place called Poonamallee to another place called Parandur. On the way, the train will stop at a town named Sunguvarchatram. This new train line is part of a bigger metro project. The bigger project connects from a place called Light House to Poonamallee. First Step of the Plan The first phase will cover the route from Poonamallee to Sunguvarchatram. It will be 27.9 km long. The estimated cost is ₹8,779 crore. This route will provide easy access to the Kuthambakkam Bus Station. The state government has submitted the plan to the Central Government to seek approval and assistance. Metro Stations in the First Phase There will be 14 metro stations along this route: Nazarathpet Chembarambakkam Kuthambakkam Bus Station Samathuvapuram Chettipedu Thandalam SIPCOT Irungattukottai Pennalur Sriperumbudur Pattunool Chatram Irungulam Industrial Area Mambakkam Thirumangalam Sunguvarchatram Full Metro Plan The entire metro route from Poonamallee to Parandur will span 52.94 km. The total cost is estimated at ₹15,906 crore. The project will be implemented in two phases: Phase 1: From Poonamallee to Sunguvarchatram Phase 2: From Sunguvarchatram to Parandur Next Steps The government will soon begin the following activities: Relocating utility lines such as wires and pipes Acquiring land for the metro construction Work will start first on Phase 1 Fast Train Proposal Chennai Metro is also considering building a fast train to connect to the new airport at Parandur. This train could be similar to the Regional Rapid Transit System (RRTS), offering faster travel than the regular metro.


News18
6 days ago
- News18
Dharuhera: An Emerging Real Estate Hub Moving From Periphery To Prominence
Last Updated: Dharuhera in Haryana's Rewari district is evolving from a manufacturing hub to a prime real estate corridor, attracting investors with its strategic location, say realty players. Dharuhera, which is located in Haryana's Rewari district, is gaining substantial recognition among investors. Previously seen as a manufacturing zone, the area is quickly transforming into a high-potential real estate growth corridor. Strategically positioned along the Delhi-Jaipur corridor (NH-48), Dharuhera enjoys seamless road connectivity to Gurugram, Delhi, and beyond, making it a vital junction for both industrial logistics and residential migration. Enhancing its appeal is the upcoming Delhi-Alwar Regional Rapid Transit System (RRTS), expected to be operational by April. The RRTS will significantly reduce commute times between Delhi and Dharuhera, with a dedicated station planned in the city. This transformative connectivity is set to turn Dharuhera into a true commuter suburb and investment hotspot within the NCR ecosystem. The area's real estate momentum is deeply anchored in its booming industrial ecosystem. With over 1,800 industries operating in and around the region, Dharuhera serves as a major employment hub, supporting a workforce of more than 1.6 million people. Global and domestic giants like Hero MotoCorp, Honda, Carlsberg, Gillette, Amul, and Jaquar have significant operations here, driving sustained demand for both rental and owned housing. The steady influx of industrial workers, professionals, and service providers ensures a reliable, end-user-driven real estate market, offering long-term stability for developers and investors. The region has seen one of the most compelling appreciation stories in NCR's periphery. According to data from 99 acres, residential plot prices have surged from Rs 20,000 per sq yard in 2019 to Rs 65,000-Rs 70,000 per square yard in 2025, reflecting a near threefold increase in just five years. The 2024 average stood at Rs 42,912 per sq yard, with select localities even breaching the Rs 57,000 mark. Despite this sharp rise, Dharuhera remains considerably more affordable than Gurugram, positioning it as a high-upside investment destination for early movers seeking both capital appreciation and long-term growth potential. Vishesh Rawat, vice-president & head of marketing, sales and CRM, M2K Group, said, 'From an industry standpoint, it's clear that infrastructure is the ultimate catalyst, and Dharuhera is proving that in real time. With the Delhi-Alwar RRTS construction work commencing early 2026 and NH-48 offering seamless access to Gurugram and Delhi, this region is no longer peripheral; it's pivotal." There is a classic pattern that where connectivity goes up, investor interest surges, and real estate values follow. What makes Dharuhera exceptional is that it offers all the right ingredients from mobility and affordability to industrial depth, at a reasonable price just next to Gurugram. This is not a wait-and-watch market; Dharuhera is entering its breakout phase, he added. Dharuhera's growth is driven by a balanced mix of affordability, location, and employment proximity. Residential properties yield between 2.2% and 3% annually, with consistent demand from industrial workers, young professionals, and budget-conscious families. On the commercial front, rental yields range from 6% to 8%, especially for properties located near highways and industrial clusters where footfall and utility are high. The tenant base is diverse, ranging from blue- and grey-collar workers employed in manufacturing units to IT and service professionals commuting from Gurugram, all seeking cost-effective yet well-connected rental options. Ankit Kansal, managing director of 360 realtors, said, 'From our lens, Dharuhera checks all boxes: affordability, connectivity, and growth potential. In the last five years, plot prices have more than doubled, yet remain far more accessible than Gurugram or Manesar. The RRTS and DMIC projects are not just infrastructural add-ons. Besides, investor sentiment has never been stronger, and with institutional developers entering, the region is evolving from speculative interest to end-user preference. Thus, we foresee that the market dynamics here point to sustained growth." Vineet Chellani, founder and CEO of Asset Deals, said, 'We are seeing a paradigm shift in buyer profiles in Dharuhera. Earlier dominated by blue-collar rental demand, the region is now attracting upwardly mobile families and first-time homeowners. Enhanced road and rail connectivity, policy reforms, and improved social infrastructure have pushed Dharuhera into the investment spotlight. From budget apartments to plotted developments, demand is surging across segments." With yields averaging 6-8% in commercial spaces, even small-ticket investors are actively entering the market. 'Hence, Dharuhera's growth is not speculative, it's structural, and the next five years will define Dharuhera's leap into the NCR's big league," he added. tags : real estate Location : New Delhi, India, India First Published: June 02, 2025, 17:58 IST News business » real-estate Dharuhera: An Emerging Real Estate Hub Moving From Periphery To Prominence