
Feature: Chinese solution helps ease water shortage in Mauritanian capital
In front of her, six sets of high-density sedimentation tanks entered trial operation as data flickered across the control screens. When the turbidity level finally dropped to a clear 113 nephelometric turbidity units, she breathed a sigh of relief. With a smile, she turned to the technicians beside her and raised a thumbs-up.
The Beni Nadji pretreatment project, built by a subsidiary of Power Construction Corporation of China (PowerChina), was officially accepted by the Mauritanian authorities in early August.
"This project is an optimal water treatment solution, implemented by a Chinese enterprise team after thorough evaluation," Maouloud told Xinhua. "By delivering efficiently under extreme conditions, they have shown true professionalism and responsibility. The project's operation will fundamentally ease summer water shortages in Nouakchott."
Mauritania, located in northwest Africa, is approximately 80 percent covered by the Sahara Desert and experiences an arid climate. Its capital, Nouakchott, home to more than 1.5 million people, relies on the Senegal River for water. The raw water is treated at the Beni Nadji water plant before being piped into the city.
Every rainy season, however, the river's silt and mud levels spike, overwhelming the plant's capacity and leaving residents facing severe water shortages. To address the issue, the government decided to build a raw water pretreatment system at the Beni Nadji plant and entrusted the project to a Chinese company.
The new station, with a designed daily capacity of 255,000 cubic meters, is equipped with six sets of high-density sedimentation tanks, a central control room, and intake and outflow structures. From groundbreaking in January to full operation in July, the project was completed in just seven months.
"This is a project that ensures, even during the rainy season when the Senegal River's turbidity fluctuates dramatically, the government can still guarantee safe drinking water for Nouakchott and surrounding areas," said Sidi Lemine, adviser to the minister, adding that Mauritania plans to promote the experience nationwide.
Construction was not without challenges. Scorching heat and sandstorms accelerated equipment wear and caused frequent malfunctions.
"To adapt to the local environment, the project used corrosion-resistant stainless steel impellers and durable pump components. The control systems were also equipped with higher protection grades," said Chang Yunfei, PowerChina's country representative in Mauritania, noting that key equipment was airlifted and logistics streamlined to ensure construction progress and project quality.
On Aug. 7, the sluice gate was opened. Muddy water from the Senegal River surged through welded steel pipes into the intake basin, then into treatment units. Most entered the high-density sedimentation system, where they went through mixing, flocculation, and settling. Gradually, turbid yellow water turned clear. Monitoring confirmed a significant improvement in water quality.
"This pretreatment station, built to world-class standards in such a short time, is a miracle," said Hadrami Mohamed, a technical expert with the National Water Company.
Project coordinator Kane Mamadou said that Nouakchott will now have a stable supply of clean water even during the most difficult rainy season. "This has greatly eased dispatching pressure and significantly improved people's well-being," he noted.
So far, the project has raised the stability of the drinking water supply in the capital region to 90 percent, created around 80 local jobs, and is expected to significantly reduce waterborne diseases such as cholera and dysentery.
Local daily Al-Akhbar reported that the project will benefit more than 1.5 million people, calling it a "milestone for securing livelihoods and strengthening urban water resilience."
"This pretreatment plant not only demonstrates the engineering strength of Chinese enterprises but also provides a replicable model for treating highly turbid raw water in Africa's arid regions," said Chang. "It delivers clean water and leaves behind a footprint of trust and cooperation."
Chinese Ambassador to Mauritania Tang Zhongdong said the project stands as another testament to the high-quality cooperation between China and Mauritania under the Belt and Road Initiative.
"By deepening pragmatic cooperation and advancing together, our two countries will bring greater benefits to their peoples and inject strong momentum into China-Africa cooperation in the new era," Tang said.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


The Star
35 minutes ago
- The Star
Russia's Transport Ministry aims for 50 pct driverless vehicles by 2050
MOSCOW, Aug. 21 (Xinhua) -- Russia's Ministry of Transport expects that half of all vehicles will be driverless by 2050, Deputy Transport Minister Vladimir Poteshkin said Thursday. "Looking ahead to 2050, our projections indicate that around 50 percent of all transport vehicles will operate without drivers. Efforts are currently underway to create the necessary conditions for this," Poteshkin said at a press conference. Previously, an unmanned truck completed its first journey from St. Petersburg to Kazan in western Russia, operating autonomously with engineers present in the cab covering the 1,600-kilometer route in 24 hours via expressways. In early April, fully autonomous freight vehicle operations were launched on the Central Ring Road in the Moscow region. Such operations have been in place on the M-11 Neva highway since 2023. Poteshkin added that about 90 driverless trucks are currently transporting freight on toll roads. "To date, these vehicles have traveled over 6 million kilometers," he said. "For further advancement, we aim to achieve Level 5 autonomy, where vehicles operate completely without drivers. We are currently developing the necessary regulatory framework and adapting road infrastructure to support this," Poteshkin added. Russian Transport Minister Andrey Nikitin stated on Aug. 14 that the development of unmanned transport in Russia through 2028 is based on a comprehensive strategy. The starting point for this process will be the federal law on highly automated transport vehicles, which is expected to be adopted in 2026 and come into force in the third quarter of 2027, he said.


The Star
3 hours ago
- The Star
African Energy Chamber opens int'l office in China's Shanghai
CAPE TOWN, Aug. 21 (Xinhua) -- The African Energy Chamber (AEC) has officially opened an international office in Shanghai, China, aimed at strengthening cooperation between African governments, energy companies, and their counterparts in the Asian country. According to a statement issued by the AEC on Thursday, the Shanghai office will be led by Bieni Da, chief representative of the AEC in China, who is tasked with ensuring that the chamber plays a pivotal role in connecting Chinese businesses and government entities with African stakeholders. "The objective is clear: to drive impactful, long-term collaboration across strategic sectors of the economy, enabling investments that are mutually beneficial and aligned with both continents' development goals," it said. The AEC, an energy advocacy group based in South Africa, was founded in 2018 with the mandate to promote sustainable investment and best practices within the energy sector in Africa. In the statement, the AEC noted that despite the continent's high energy demand, many African energy firms struggle to access the capital needed to scale operations and boost production. The chamber added that its Shanghai office will play an instrumental part in connecting Chinese companies with African projects, facilitating partnerships, and bringing African opportunities to the Chinese market. "The AEC wants to see greater Chinese investment across the entire African oil and gas value chain -- from upstream projects to downstream infrastructure to manufacturing, power, and technology. China offers significant expertise in these areas, and the Shanghai office will unlock new collaborative opportunities in artificial intelligence, electric vehicles, renewable energy, and more," NJ Ayuk, executive chairman of the AEC, said in the statement. The AEC will also organize high-level investment forums in Shanghai to foster continued dialogue and engagement. "Africa and China have a common goal: to eradicate energy poverty. It is time to walk the walk and bring Chinese expertise and capital to African projects... This office is a testament to making sure we leave our footprint," Ayuk added.


The Star
3 hours ago
- The Star
Feature: Chinese solution helps ease water shortage in Mauritanian capital
NOUAKCHOTT, Aug. 21 (Xinhua) -- Late into the night, Mauritanian Minister of Hydraulics and Sanitation Amal Mint Maouloud stood quietly on the operation platform of the Beni Nadji water pretreatment station in the southwestern Trarza region. In front of her, six sets of high-density sedimentation tanks entered trial operation as data flickered across the control screens. When the turbidity level finally dropped to a clear 113 nephelometric turbidity units, she breathed a sigh of relief. With a smile, she turned to the technicians beside her and raised a thumbs-up. The Beni Nadji pretreatment project, built by a subsidiary of Power Construction Corporation of China (PowerChina), was officially accepted by the Mauritanian authorities in early August. "This project is an optimal water treatment solution, implemented by a Chinese enterprise team after thorough evaluation," Maouloud told Xinhua. "By delivering efficiently under extreme conditions, they have shown true professionalism and responsibility. The project's operation will fundamentally ease summer water shortages in Nouakchott." Mauritania, located in northwest Africa, is approximately 80 percent covered by the Sahara Desert and experiences an arid climate. Its capital, Nouakchott, home to more than 1.5 million people, relies on the Senegal River for water. The raw water is treated at the Beni Nadji water plant before being piped into the city. Every rainy season, however, the river's silt and mud levels spike, overwhelming the plant's capacity and leaving residents facing severe water shortages. To address the issue, the government decided to build a raw water pretreatment system at the Beni Nadji plant and entrusted the project to a Chinese company. The new station, with a designed daily capacity of 255,000 cubic meters, is equipped with six sets of high-density sedimentation tanks, a central control room, and intake and outflow structures. From groundbreaking in January to full operation in July, the project was completed in just seven months. "This is a project that ensures, even during the rainy season when the Senegal River's turbidity fluctuates dramatically, the government can still guarantee safe drinking water for Nouakchott and surrounding areas," said Sidi Lemine, adviser to the minister, adding that Mauritania plans to promote the experience nationwide. Construction was not without challenges. Scorching heat and sandstorms accelerated equipment wear and caused frequent malfunctions. "To adapt to the local environment, the project used corrosion-resistant stainless steel impellers and durable pump components. The control systems were also equipped with higher protection grades," said Chang Yunfei, PowerChina's country representative in Mauritania, noting that key equipment was airlifted and logistics streamlined to ensure construction progress and project quality. On Aug. 7, the sluice gate was opened. Muddy water from the Senegal River surged through welded steel pipes into the intake basin, then into treatment units. Most entered the high-density sedimentation system, where they went through mixing, flocculation, and settling. Gradually, turbid yellow water turned clear. Monitoring confirmed a significant improvement in water quality. "This pretreatment station, built to world-class standards in such a short time, is a miracle," said Hadrami Mohamed, a technical expert with the National Water Company. Project coordinator Kane Mamadou said that Nouakchott will now have a stable supply of clean water even during the most difficult rainy season. "This has greatly eased dispatching pressure and significantly improved people's well-being," he noted. So far, the project has raised the stability of the drinking water supply in the capital region to 90 percent, created around 80 local jobs, and is expected to significantly reduce waterborne diseases such as cholera and dysentery. Local daily Al-Akhbar reported that the project will benefit more than 1.5 million people, calling it a "milestone for securing livelihoods and strengthening urban water resilience." "This pretreatment plant not only demonstrates the engineering strength of Chinese enterprises but also provides a replicable model for treating highly turbid raw water in Africa's arid regions," said Chang. "It delivers clean water and leaves behind a footprint of trust and cooperation." Chinese Ambassador to Mauritania Tang Zhongdong said the project stands as another testament to the high-quality cooperation between China and Mauritania under the Belt and Road Initiative. "By deepening pragmatic cooperation and advancing together, our two countries will bring greater benefits to their peoples and inject strong momentum into China-Africa cooperation in the new era," Tang said.