
GR Silver Mining Reports Initial High-Grade Results from Plomosas Mine Sampling Program
To model the recently mapped high-grade silver zones in the interior of the historic Plomosas Mine, post completion of the March 2023 NI 43-101 mineral resource estimate ("MRE");
To collect metallurgical test work samples essential to define key parameters for implementation of a Bulk Sampling Test Mining Program (" BSTM") at the Plomosas Mine (Table 1); and
To enhance the existing database of underground samples for improved reconciliation between the MRE and areas identified for a BSTM.
Sampling Highlights
Initial highlights of the Phase I Plomosas Mine underground sampling program include:
Chip Mine Face Sample – Level 883 - 2,423 g/t Ag Eq*, consisting of 675 g/t Ag, 46.9% Pb, 4.5% Zn and 0.54 g/t Au (Polymetallic Hydrothermal Breccia – Massive Sulphide)
Channel Sample – Level 833 – 0.8 m @ 2,019 g/t Ag Eq, consisting of 137 g/t Ag, 5.74 g/t Au, 16.7% Pb, and 18.2% Zn (Polymetallic Hydrothermal Breccia – Massive Sulphide)
Channel Sample – Level 950 – 0.6 m @ 3,993 g/t Ag Eq, 310 g/t Ag, 15.20 g/t Au, 26.2% Pb and 10.2% Zn (Polymetallic Hydrothermal Breccia – Massive Sulphide)
GR Silver Mining's President and CEO, Marcio Fonseca, commented "The success of our new geological model at the Plomosas Mine, completed during the last 6 months, combined with detailed underground sampling, will be fundamental for the future development of engineering parameters to assess implementation of a Bulk Sampling Test Mining program in the underground mine. The current site has initial infrastructure and key permits in place, which can assist in any future mine and processing plant developments at the historic Plomosas Mine."
The Program will consist of two phases over the next four months, whereby Phase I assesses metallurgical data collected to support engineering studies as part of the BSTM, and Phase II will complete a much larger dataset to help refine basic mining engineering and planning. Both phases of the Program will support a decision to potentially implement a BSTM at the Plomosas Mine before year-end.
The Program leverages existing permits to operate at the Plomosas Mine, providing full access to the 7.4 km of underground development. Access to multiple areas for sampling, as shown in Figure 1, has enabled a better identification of unmined regions with high-grade, continuous silver, gold, and base metal mineralization at various levels of the underground mine. Assay results from 21 samples collected at the chosen sites (Table 1) have returned high-grade results, with values of up to 3,993 g/t Ag Eq. Multiple high-grade results indicate potential areas to advance Phase II, targeting the collection of additional metallurgical data and progress towards the implementation of a BSTM in the Plomosas Mine.
Table 1 - Phase I Underground Sampling Assay Results, Plomosas Mine
Sample
Sample ID
Underground Level
Sample
Ag Eq*
Ag
Au
Pb
Zn
Cu
Rocktype
Type
Length(m)
g/t
g/t
g/t
%
%
%
80458
815
877
127
2.07
1.0
2.7
2.9
Stockwork - Veins
80489
825
211
63
0.04
1.6
1.9
0.1
Polymetallic Veins
80494
862
910
90
0.99
11.5
8.5
0.1
Polymetallic Hydrothermal Breccia
80468
883
2,423
675
0.54
46.9
4.5
0.1
Polymetallic Hydrothermal Breccia
Chip
80478
975
370
308
0.06
0.4
0.7
0.1
Polymetallic Hydrothermal Breccia
Mine Face
80460
975
365
297
0.09
0.4
0.7
0.1
Polymetallic Veins
Sample
80491
975
805
50
0.69
12.4
5.9
0.4
Polymetallic Veins
80474
1000
822
71
1.13
13.4
4.1
0.3
Stockwork - Veins
80466
1000
587
36
0.48
2.1
6.9
1.1
Polymetallic Hydrothermal Breccia
80479
1000
170
51
0.02
1.8
1.1
0.1
Polymetallic Hydrothermal Breccia - Massive Sulphide
80472
1000
1,000
174
1.52
10.5
7.7
0.3
Stockwork - Veins
80498
833
0.8
2,019
137
5.74
16.7
18.2
0.5
Polymetallic Hydrothermal Breccia - Massive Sulphide
Channel
80499
833
1
909
71
2.32
6.7
8.8
0.3
Polymetallic Hydrothermal Breccia - Massive Sulphide
Mine Face
80500
833
0.75
386
34
0.09
8.1
1.9
0.0
Polymetallic Hydrothermal Breccia
Sample
80503
862
1.2
1,870
96
0.54
29.8
16.8
0.6
Polymetallic Veins
80504
950
0.8
1,192
28
0.18
29.5
5.0
0.0
Polymetallic Veins
80505
950
0.6
15
8
0.01
0.0
0.1
0.0
Polymetallic Hydrothermal Breccia
80507
950
0.9
64
11
0.16
0.1
0.6
0.1
Polymetallic Veins
80508
950
0.6
3,993
310
15.20
26.2
10.2
7.2
Polymetallic Hydrothermal Breccia - Massive Sulphide
80509
1000
1
421
68
0.55
2.5
5.1
0.1
Polymetallic Hydrothermal Breccia
80512
1000
1
899
864
0.07
0.1
0.2
0.1
Stockwork - Veins
Note:
Numbers may be rounded. Results are uncut and undiluted. True width not estimated as the Company does not have sufficient data from the new mineralized zones to determine the true widths of the intervals with any confidence.
* Ag Eq calculations using US$20.00/oz Ag, US$1,600/oz Au, US$0.90/lb Pb, US$1.10/lb Zn and US$3.00/lb Cu, with metallurgical recoveries of Ag – 74%, Au – 86%, Pb – 69%, Zn – 75% and Cu – 80%. Ag Eq = ((Ag grade x Ag Price x Ag recovery) + (Au grade x Au price x Au recovery) + (Pb grade x Pb price x Pb recovery) + (Zn grade x Zn price x Zn recovery) + (Cu grade x Cu price x Cu recovery)/(Ag price x Ag recovery)
The areas selected for Phases I and II of the Program consist of material where mineralization is continuous, with evidence of silver, gold and base metal mineralization at concentrations attractive for a potential BSTM in early 2026. The BSTM will also require the construction of a demonstration processing plant on site, with details to be defined after the completion of Phase II and associated engineering studies.
The Company plans to continue investigating opportunities at the Plomosas Mine, based on recent success, targeting the higher-grade silver zones in the MRE, which may support the implementation of a BSTM.
Note: Purple shapes are potential stopes blocks for BSTM. Pale grey represents existing underground developments of varying sizes, ramps and historical stopes.
About the Plomosas Project
The Plomosas Project, including the recent high-grade silver discovery in the San Marcial SE Area, is progressing in 2025 as an emerging high-grade silver district located in southern Sinaloa, Mexico. The Plomosas Project, covering 43,187 ha, benefits from mine infrastructure, road access and existing permits associated with past-producing historical mining sites. The district contains intermediate to low-sulfidation epithermal silver and gold mineralization, hosted in hydrothermal breccias and veins. Recent success in exploration and drilling has delineated wide, high-grade, shallow hydrothermal breccias in the San Marcial Area, including the SE Area discovery, where step-out drilling is progressing in 2025, aiming for continuous resource growth. At the historical Plomosas Mine, where a subsidiary of Grupo Mexico operated the underground mine from 1985 to 2000, exploratory and metallurgical programs are being conducted to support future decisions regarding the implementation of a BSTM.
QA/QC Procedures
The Company has implemented QA/QC procedures, which include the insertion of blank, duplicate, and standard samples in all sample lots sent to SGS de México, S.A. de C.V. laboratory facilities in Durango, Mexico, for sample preparation and assaying. For every sample with results above Ag >100 ppm (over limits), these samples are submitted directly by SGS de Mexico to SGS Canada Inc. at Burnaby, BC. The analytical methods include four acid Digestion and Inductively Coupled Plasma Optical Emission Spectrometry, with Lead Fusion Fire Assay and a gravimetric finish for silver above over limits. For gold assays, the analytical methods are Lead Fusion and Atomic Absorption Spectrometry, Lead Fusion Fire Assay, and gravimetric finish for gold above over limits (>10 ppm).
Qualified Person
The Qualified Person under National Instrument 43-101 Standards of Disclosure for Mineral Projects for this news release is Marcio Fonseca, P. Geo., President & CEO for GR Silver Mining, who has reviewed and approved its contents.
About GR Silver Mining Ltd.
GR Silver Mining is a Canadian-based, Mexico-focused junior mineral exploration company engaged in cost-effective silver-gold resource expansion on its 100%-owned assets, located on the eastern edge of the Rosario Mining District, in the southeast of Sinaloa State, Mexico. GR Silver Mining controls 100% of the Plomosas Project, including the former Plomosas underground mine and wide, high-grade silver mineralized zones at the San Marcial Area. Recent discoveries in the 78 km² of highly prospective, advanced-stage exploration concessions position the Company well for resource expansion at the Plomosas Project.
GR Silver Mining Ltd.
Márcio Fonseca, President & CEO
Cautionary Statement Regarding Forward-Looking Information
This press release contains "forward-looking statements" within the meaning of applicable Canadian securities legislation and information that are based on the beliefs of management and reflect the Company's current expectations. When used in this press release, the words "estimate", "project", "belief", "anticipate", "intend", "expect", "plan", "predict", "may" or "should" and the negative of these words or such variations thereon or comparable terminology are intended to identify forward-looking statements and information. Such statements and information reflect the current view of the Company. Risks and uncertainties may cause actual results to differ materially from those contemplated in those forward-looking statements and information. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.
SOURCE GR Silver Mining Ltd.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Cision Canada
2 minutes ago
- Cision Canada
Alexander's Fudge brand Cookies n' Cream Fudge recalled due to undeclared wheat
OTTAWA, ON, Aug. 1, 2025 /CNW/ - Product: Cookies n' Cream Fudge Issue: Food - Allergen - Wheat Food - Allergen - Gluten Distribution: Ontario See the affected products and product photos for this recall SOURCE Canadian Food Inspection Agency (CFIA)


Cision Canada
2 hours ago
- Cision Canada
CFIB statement on Canada Post workers rejecting final offer
TORONTO, Aug. 1, 2025 /CNW/ - It's extremely disappointing that the members of the Canadian Union of Postal Workers (CUPW) have rejected Canada Post's final offer. This just brings more uncertainty at a time when small businesses are already struggling to plan ahead. We can't keep doing this. If there's another strike, two in three businesses may walk away from Canada Post permanently. We're calling on government to prevent another strike from happening by extending the current collective bargaining agreement for the foreseeable future. Government also needs to immediately give Canada Post the full authority to make the major reforms needed to ensure it is financially sustainable. This will likely require tough decisions, including back-to-work legislation orders. CFIB is calling on all political parties to support the reforms suggested in the Industrial Inquiry report to allow this important service to continue for the long term. - Dan Kelly, President, CFIB About CFIB The Canadian Federation of Independent Business (CFIB) is Canada's largest association of small and medium-sized businesses with 100,000 members across every industry and region. CFIB is dedicated to increasing business owners' chances of success by driving policy change at all levels of government, providing expert advice and tools, and negotiating exclusive savings. Learn more at cfi


Cision Canada
2 hours ago
- Cision Canada
Majority of CUPW-represented employees reject Canada Post's final offers Français
Corporation evaluating next steps following vote outcome OTTAWA, ON, Aug. 1, 2025 /CNW/ - The Canada Industrial Relations Board (CIRB) has informed Canada Post that a majority of employees represented by the Canadian Union of Postal Workers (CUPW) have voted to reject the Corporation's final offers to both the Urban and RSMC (Rural and Suburban Mail Carriers) bargaining units. This means negotiations between the parties remain unresolved. While we are disappointed in the results, we want to thank employees for participating in the process. We would also like to thank the CIRB for administering the vote. This result does not lessen the urgent need to modernize and protect this vital national service. However, it does mean the uncertainty that has been significantly impacting our business – and the many Canadians and Canadian businesses who depend on Canada Post – will continue. We are evaluating our next steps. TM Trademark of Canada Post Corporation.