logo
Aura Minerals Agrees to Acquire the Mineração Serra Grande Gold Mine in Goiás, Brazil

Aura Minerals Agrees to Acquire the Mineração Serra Grande Gold Mine in Goiás, Brazil

ROAD TOWN, British Virgin Islands, June 02, 2025 (GLOBE NEWSWIRE) — Aura Minerals Inc. (TSX: ORA, B3: AURA33 and OTCQX: ORAAF) ('Aura' or the 'Company') is pleased to announce that Aura, AngloGold Ashanti plc ('AngloGold') and a wholly owned subsidiary of Aura have entered into a Share Purchase Agreement (the 'SPA') pursuant to which Aura's wholly owned subsidiary will acquire from AngloGold all of the issued and outstanding securities of Mineração Serra Grande S.A. ('MSG'), owner of the Mineração Serra Grande gold mine located in Crixás, in the state of Goiás, Brazil (the 'Transaction').
Transaction Highlights:
The closing of the Transaction is expected to happen by Q3 2025, and no later than Q4 2025.
Rodrigo Barbosa, President and CEO of Aura, stated: 'AngloGold has built a strong reputation for developing and operating world-class mines. Serra Grande, located in one of Brazil's most prominent greenstone belts, has, according to AngloGold, produced over 3 million Oz since 1998 with a peak production of 193,000 Oz in 2006, underscoring its significant potential. As a nimble company with a proven turnaround track record (e.g., Apoena and Aranzazu) and a team with significant previous knowledge of Serra Grande, Aura is well positioned to unlock the mine's potential. Through our disciplined capital allocation, Aura 360 culture, and a targeted exploration program, we believe we can significantly enhance performance, boost production, reduce costs, and extend the Life of Mine at Serra Grande, which could result in Serra Grande becoming a cornerstone of our portfolio.'
ABOUT MSG
MSG is located in the northwest of the state of Goiás, central Brazil about 5km from the city of Crixás. The MSG operation comprises three mechanised underground mines and an open pit, with one dedicated metallurgical plant with an annual capacity of 1.5 Mt.
AngloGold's existing Mineral Resource and Mineral Reserve Report dated as of December 31, 2024, filed on AngloGold's website, disclosed total Measured and Indicated Resource of 10.75 Mt gold, at an average grade of 3.14 g/t gold for 1.08 Moz of gold, along with Inferred Mineral Resource of 12.95 Mt gold at an average grade of 3.39 g/t for 1.4 Moz of gold. Aura considers the reported mineral resources as 'historical estimates' and does not treat such mineral resources as current. A qualified person has not done sufficient work to classify the historical estimates as current mineral resources under 43-101 –
Standard of Disclosure for Mineral Projects
('NI 43-101') or comment on the reliability of the historic resources or what work needs to be done to upgrade or verify the historical estimates as current. In addition, Aura cannot confirm if such classifications are compatible with, or directly comparable to, the requirements of NI 43-101.
According to AngloGold, in 2024, MSG produced 80 kOz of gold (2023: 86 kOz).
Advisers and Counsel
BofA Securities is acting as exclusive financial adviser to Aura, and Demarest Advogados is acting as Brazilian law adviser and Gowling WLG (UK) LLP is acting as English law adviser to Aura.
Qualified Person
The scientific and technical information contained within this news release has been reviewed and approved by Farshid Ghazanfari, P.Geo., a qualified person as defined in NI 43-101.
About Aura 360° Mining
Aura is focused on mining in complete terms – thinking holistically about how its business impacts and benefits every one of our stakeholders: our company, our shareholders, our employees, and the countries and communities we serve. We call this 360° Mining.
Aura is a company focused on the development and operation of gold and base metal projects in the Americas. The company's five operating assets include the Minosa gold mine in Honduras; the Almas, Apoena, and Borborema gold mines in Brazil; and the Aranzazu copper, gold, and silver mine in Mexico. Additionally, the company owns Era Dorada, a gold project in Guatemala; Tolda Fria, a gold project in Colombia; and three projects in Brazil: Matupá, which is under development; São Francisco, which is in care and maintenance; and the Carajás copper project in the Carajás region, in the exploration phase.
Forward-Looking Information
This press release contains 'forward-looking information' and 'forward-looking statements', as defined in applicable securities laws (collectively, 'forward-looking statements') which may include, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future. Often, but not always, forward-looking statements can be identified by the use of words and phrases such as 'plans,' 'expects,' 'is expected,' 'budget,' 'scheduled,' 'estimates,' 'forecasts,' 'intends,' 'anticipates,' or 'believes' or variations (including negative variations) of such words and phrases, or state that certain actions, events or results 'may,' 'could,' 'would,' 'might' or 'will' be taken, occur or be achieved. Known and unknown risks, uncertainties and other factors, many of which are beyond the Company's ability to predict or control, could cause actual results to differ materially from those contained in the forward-looking statements and all forward-looking statements herein are qualified by this cautionary statement. Accordingly, readers should not place undue reliance on forward-looking statements. Forward-looking statements contained in the press release include, but are not limited to, statements relating to: the completion of the Transaction; timing for the completion of the Transaction; consideration payable under the Transaction; entry into the net smelter returns deferred consideration agreement; completion of the MSG Subsidiaries Transfer; fulfillment of the conditions precedent to the Transaction; enhancing performance, boosting production, reducing costs, and extending the Life of Mine at Serra Grande and the potential for Serra Grande to become a cornerstone of Aura's portfolio. The Company undertakes no obligation to update publicly or otherwise revise any forward-looking statements whether as a result of new information or future events or otherwise, except as may be required by law. If the Company does update one or more forward-looking statements, no inference should be drawn that it will make additional updates with respect to those or other forward-looking statements.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Aura Releases 2024 Sustainability Report
Aura Releases 2024 Sustainability Report

Business Upturn

time44 minutes ago

  • Business Upturn

Aura Releases 2024 Sustainability Report

By GlobeNewswire Published on June 6, 2025, 03:19 IST ROAD TOWN, British Virgin Islands, June 05, 2025 (GLOBE NEWSWIRE) — Aura Minerals Inc. (TSX: ORA, B3: AURA33 and OTCQX: ORAAF) ('Aura' or the 'Company') is pleased to release its 5th Annual Sustainability Report showcasing the Company's progress in promoting safety, responsibility, sustainability, and innovation. This year's report highlights the Company's strategic efforts across eight core environmental, social and governance ('ESG') pillars. Prepared accordance with Global Reporting Initiative (GRI) standards, the report ensures clear and transparent disclosure of Aura's financial, environmental, and social performance. The full report can be found Sustainability – Aura Minerals on Aura's website. 2024 Sustainability Report Highlights Driving Digital Transformation: Strengthened data and cybersecurity infrastructure to enable a connected AI-driven future. Almas and Borborema, are now fully integrated with Aura Analytics, a corporate business intelligence platform with 40K+ monthly accesses and 4M+ records. Strengthened data and cybersecurity infrastructure to enable a connected AI-driven future. Almas and Borborema, are now fully integrated with Aura Analytics, a corporate business intelligence platform with 40K+ monthly accesses and 4M+ records. Empowering Neighboring Communities: Invested R$6.1 million in targeted economic and social development initiatives to create lasting regional impact. Projects include water supply improvements at Minosa and free medical care at Aranzazu. Invested R$6.1 million in targeted economic and social development initiatives to create lasting regional impact. Projects include water supply improvements at Minosa and free medical care at Aranzazu. GHG Protocol : Aura reassessed the emissions inventories of our units between 2020 and 2024, based on the guidelines of the GHG Protocol, with the aim of enhancing our management strategy on this topic. : Aura reassessed the emissions inventories of our units between 2020 and 2024, based on the guidelines of the GHG Protocol, with the aim of enhancing our management strategy on this topic. Achieved a strong safety milestone with Zero Lost Time Incidents in Borborema construction and only one lost time incident across all operations, highlighting a culture of safety excellence. and only one lost time incident across all operations, highlighting a culture of safety excellence. Strengthening ESG Leadership: Successfully completed compliance with the Responsible Gold Mining Principles and the Conflict Free Gold Standards , established by the World Gold Council , and Empresa Socialmente Responsable seal in Honduras and Mexico for the second year running, reaffirming commitment to responsible mining and global sustainability standards. Successfully completed compliance with the and the , established by the , and seal in Honduras and Mexico for the second year running, reaffirming commitment to responsible mining and global sustainability standards. Boosted Local Economies Through Procurement: Stimulated regional economic growth by sourcing an average of 40% of purchases from local suppliers, creating shared value and strengthening supply chains. Stimulated regional economic growth by sourcing an average of 40% of purchases from local suppliers, creating shared value and strengthening supply chains. Recognized for Diversity: Honored for the second consecutive year by Conexão Salto Alto for advancing gender equity and supporting female talent at our Apoena unit. Honored for the second consecutive year by Conexão Salto Alto for advancing gender equity and supporting female talent at our Apoena unit. GPTW: Aura conducted our first organizational climate survey across all our units, using the Great Place to Work (GPTW) methodology. With a 78% favourability score, we earned the GPTW certification for all the units where we operate. Rodrigo Barbosa, President & CEO commented, 'It is with great honor that we reflect on the execution of the vision we set out in 2018, from implementing our Aura 360 culture to now seeing its results across sustainability, operational excellence, and financial growth. In 2024, Aura solidified its trajectory of sustainable growth, increasing production from 236,000 to 267,000 gold equivalent ounces, driven by operational excellence at Almas and Minosa, and strategic expansions like Borborema and the acquisition of Bluestone Resources. Committed to ESG principles, we achieved a 90% adherence to the World Gold Council's Responsible Mining Principles, implemented innovative environmental practices such as grey water treatment at Borborema, and maintained an exemplary safety record with only one lost-time accident in 24 months. Our Aura 360 culture, recognized by Great Place to Work certifications across all operations, fosters diversity, continuous training, and community development, ensuring a positive legacy through responsible mining About Aura 360° Mining Aura is focused on mining in complete terms – thinking holistically about how its business impacts and benefits every one of our stakeholders: our company, our shareholders, our employees, and the countries and communities we serve. We call this 360° Mining. Aura is a company focused on the development and operation of gold and base metal projects in the Americas. The company's five operating assets include the Minosa gold mine in Honduras; the Almas, Apoena, and Borborema gold mines in Brazil; and the Aranzazu copper, gold, and silver mine in Mexico. Additionally, the company owns Era Dorada, a gold project in Guatemala; Tolda Fria, a gold project in Colombia; and three projects in Brazil: Matupá, which is under development; São Francisco, which is in care and maintenance; and the Carajás copper project in the Carajás region, in the exploration phase. Forward-Looking Information This press release contains 'forward-looking information' and 'forward-looking statements', as defined in applicable securities laws (collectively, 'forward-looking statements') which may include, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future. Often, but not always, forward-looking statements can be identified by the use of words and phrases such as 'plans,' 'expects,' 'is expected,' 'budget,' 'scheduled,' 'estimates,' 'forecasts,' 'intends,' 'anticipates,' or 'believes' or variations (including negative variations) of such words and phrases, or state that certain actions, events or results 'may,' 'could,' 'would,' 'might' or 'will' be taken, occur or be achieved. – 6 – Known and unknown risks, uncertainties and other factors, many of which are beyond the Company's ability to predict or control, could cause actual results to differ materially from those contained in the forward-looking statements. Specific reference is made to the most recent Annual Information Form on file with certain Canadian provincial securities regulatory authorities for a discussion of some of the factors underlying forward-looking statements, which include, without limitation, volatility in the prices of gold, copper and certain other commodities, changes in debt and equity markets, the uncertainties involved in interpreting geological data, increases in costs, environmental compliance and changes in environmental legislation and regulation, interest rate and exchange rate fluctuations, general economic conditions and other risks involved in the mineral exploration and development industry. Readers are cautioned that the foregoing list of factors is not exhaustive of the factors that may affect the forward-looking statements. All forward-looking statements herein are qualified by this cautionary statement. Accordingly, readers should not place undue reliance on forward-looking statements. The Company undertakes no obligation to update publicly or otherwise revise any forward-looking statements whether as a result of new information or future events or otherwise, except as may be required by law. If the Company does update one or more forward-looking statements, no inference should be drawn that it will make additional updates with respect to those or other forward-looking statements. Disclaimer: The above press release comes to you under an arrangement with GlobeNewswire. Business Upturn takes no editorial responsibility for the same. GlobeNewswire provides press release distribution services globally, with substantial operations in North America and Europe.

Starting a New Chapter of Growth
Starting a New Chapter of Growth

Business Upturn

time44 minutes ago

  • Business Upturn

Starting a New Chapter of Growth

TORONTO, June 05, 2025 (GLOBE NEWSWIRE) — McEwen Mining Inc. (NYSE: MUX) (TSX: MUX) is pleased to announce a significant development at our Fox Complex's Stock Mine that will usher in a new chapter of growth. Construction of the ramp system is now underway to provide access to future lower-cost-per-ounce gold production. Rob McEwen, CEO and Chief Owner of McEwen Mining states: 'As a long-term gold bull, I am always excited to break ground on a new gold mine, especially today, with gold trading at record highs and strong fundamentals for further upside. As we transition production from the Froome Mine to the Stock Mine, the timing is ideal for bringing Stock Mine into production. Moreover, it is important to understand that the Stock Mine will help us increase our near-term gold production and decrease our cost per ounce for three reasons: One, it will eliminate the onerous metal stream from prior owners on the Froome mine, which obligated us to sell 8% of our production at $605 per ounce; Two, the Stock material is softer than that currently processed from Froome, which will enable greater mill throughput and gold output; and Three, with the mill on site, we eliminate the cost of hauling material 35 kilometers from Froome, as you can see further below in Image 1.' Part of our Fox Complex, the Stock Mine will be the newest gold mine to come online in the prolific Timmins gold mining district, at a time when gold is trading at record highs against fiat currencies. The mine is located along the Destor-Porcupine fault, known as the 'Golden Highway', which hosts many of the richest gold mines in Ontario and Quebec, Canada. This prime location benefits from a robust mining workforce and a regional economy for which mining is an important driver. McEwen Mining thanks our team and the local communities, First Nations and the provincial government, all of whom helped to make this milestone a reality. Stock Mine Overview Construction has begun on the Stock Mine portal, pictured below, that will provide both underground access to Stock's three gold zones, West, Main and East, and a cost-effective platform for underground drilling to test the depth extensions of these zones. The Stock Property hosts the Stock Mill and the former Stock Mine. It was a small mine that produced 137,000 ounces of gold at a 5.5 g/t average grade from an underground operation between 1989 and 2005. Extensive drilling has successfully defined three gold deposits at Stock – the West, Main and East zones that are laying the groundwork to confidently begin mining in the second half of 2025. Gold mineralization at the Stock Mine has been delineated on a three-kilometer-long mineralized trend along the prolific Destor-Porcupine Fault, with current gold resources of 281,000 ounces at average grade 3.12 g/t Indicated and 181,000 ounces at average grade 2.87 g/t Inferred. Figure 1 is a project-wide longitudinal section at Stock, illustrating the proposed ramp development (shown as green straight lines) and mining horizons (shapes in purple) associated with the West, Main and East Zones. Figure 1. Longitudinal Section at Stock Mine, Showing the West, Main and East Zones with Highlights of Published Drill Results, Together with the Planned Development Works and Mining Blocks Stock Ramp to Access Gold Production in 2025 The Stock Ramp will connect the West Zone and the East Zone to the existing historical underground workings of the Main Zone. Stock is expected to provide increased gold production at a lower cost per ounce than our current output from the Froome Mine. The advantages of mining at Stock compared to Froome are significant and can be summarized in three key points: Minimal royalty: The bulk of the Stock deposit is royalty-free, whereas Froome is fully subject to an onerous metal stream that obligates us to sell 8% of our production in this area at $605 per ounce – great to see this come to an end; Higher mill throughput: The material at Stock has a lower (softer) work index compared to the material currently processed from the Froome Mine. This is expected to result in increased throughput and gold production; and Lower haulage costs: The Froome Mine is deeper and located 35 kilometers from the Stock Mill, while the gold mineralization at Stock is at shallower depths and located right next to the mill, significantly reducing transportation costs. Mining will start in the East Zone, which had a recent increase in the resource (see press release dated June 20, 2024), and will provide early production and cash flow. Our development plan for the Stock Ramp is to drive the ramp to the East Zone concurrently with the ramps to the Main and West zones. This approach will enable simultaneous access to multiple sources of mineralization from the Stock Ramp. Image 1. The New Stock Mine Portal, with the Nearby Mill in the Background Image 2. Looking Out of the Stock Portal Toward the Jumbo Drill Technical Information The technical content of this news release related to mining and development has been reviewed and approved by William (Bill) Shaver, COO of McEwen Mining and a Qualified Person as defined by SEC S-K 1300 and the Canadian Securities Administrators National Instrument 43-101 'Standards of Disclosure for Mineral Projects.' CONCERNING FORWARD-LOOKING STATEMENTS This news release contains certain forward-looking statements and information, including 'forward-looking statements' within the meaning of the Private Securities Litigation Reform Act of 1995. The forward-looking statements and information expressed, as at the date of this news release, McEwen Mining Inc.'s (the 'Company') estimates, forecasts, projections, expectations or beliefs as to future events and results. Forward-looking statements and information are necessarily based upon a number of estimates and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties, risks and contingencies, and there can be no assurance that such statements and information will prove to be accurate. Therefore, actual results and future events could differ materially from those anticipated in such statements and information. Risks and uncertainties that could cause results or future events to differ materially from current expectations expressed or implied by the forward-looking statements and information include, but are not limited to, fluctuations in the market price of precious metals, mining industry risks, political, economic, social and security risks associated with foreign operations, the ability of the Company to receive or receive in a timely manner permits or other approvals required in connection with operations, risks associated with the construction of mining operations and commencement of production and the projected costs thereof, risks related to litigation, the state of the capital markets, environmental risks and hazards, uncertainty as to calculation of mineral resources and reserves, foreign exchange volatility, foreign exchange controls, foreign currency risk, and other risks. Readers should not place undue reliance on forward-looking statements or information included herein, which speak only as of the date hereof. The Company undertakes no obligation to reissue or update forward-looking statements or information as a result of new information or events after the date hereof except as may be required by law. See McEwen Mining's Annual Report on Form 10-K for the fiscal year ended December 31, 2024, and other filings with the Securities and Exchange Commission, under the caption 'Risk Factors', for additional information on risks, uncertainties and other factors relating to the forward-looking statements and information regarding the Company. All forward-looking statements and information made in this news release are qualified by this cautionary statement. The NYSE and TSX have not reviewed and do not accept responsibility for the adequacy or accuracy of the contents of this news release, which has been prepared by the management of McEwen Mining Inc. ABOUT MCEWEN MINING McEwen Mining Inc. provides its shareholders with exposure to gold, copper and silver in the Americas by way of its three mines located in the United States of America, Canada and Argentina and its large advanced-stage copper development project in Argentina. It also has a gold and silver mine on care and maintenance in Mexico. Its Los Azules copper project aims to be one of the world's first regenerative copper mines and is committed to achieving carbon neutrality by 2038. Rob McEwen, Chairman and Chief Owner, has a personal investment in the companies of US$205 million and takes a salary of $1/year. He is a recipient of the Order of Canada and a member of the Canadian Mining Hall of Fame. His objective for MUX is to build its share value and establish a dividend, as he did while building Goldcorp Inc. McEwen Mining's shares are publicly traded on the New York Stock Exchange (NYSE) and the Toronto Stock Exchange (TSX) under the symbol 'MUX'. Want News Fast? Subscribe to our email list by clicking here: and receive news as it happens! Photos accompanying this announcement are available at: Disclaimer: The above press release comes to you under an arrangement with GlobeNewswire. Business Upturn takes no editorial responsibility for the same.

Taseko, Tŝilhqot'in Nation & Province of BC Reach Historic Agreement Concerning the New Prosperity Project
Taseko, Tŝilhqot'in Nation & Province of BC Reach Historic Agreement Concerning the New Prosperity Project

Business Upturn

time44 minutes ago

  • Business Upturn

Taseko, Tŝilhqot'in Nation & Province of BC Reach Historic Agreement Concerning the New Prosperity Project

By GlobeNewswire Published on June 6, 2025, 02:19 IST VANCOUVER, British Columbia, June 05, 2025 (GLOBE NEWSWIRE) — Taseko Mines Limited (TSX: TKO; NYSE American: TGB; LSE: TKO) ('Taseko' or the 'Company'), the Tŝilhqot'in Nation and the Province of British Columbia ('BC') today announced the signing of an agreement (the 'Agreement') to resolve a complex, long-standing conflict concerning Taseko's New Prosperity mineral tenures, located approximately 125 kilometers southwest of Williams Lake, British Columbia in the Teẑtan Biny (Fish Lake) area of Tŝilhqot'in territory. New Prosperity is one of the largest copper-gold deposits in Canada, with a measured and indicated mineral resource containing 5.3 billion pounds of copper and 13.3 million ounces of gold1. Negotiated over a period of years, the Agreement ends litigation among the three parties, while providing certainty with respect to how the significant copper-gold resource at New Prosperity may be developed in the future. In resolving a high-profile conflict between the rights of resource developers and First Nations, the Agreement meaningfully advances the goals of reconciliation in British Columbia. Stuart McDonald, President & CEO commented, ' This Agreement resolves a damaging and value-destructive dispute, and acknowledges Taseko's commercial interests in the New Prosperity property and the cultural significance of the area to the Tŝilhqot'in Nation. Taseko will retain a majority interest (77.5%) in the mineral tenures, while any future development at New Prosperity will benefit the Tŝilhqot'in people, and will only occur with their free, prior and informed consent . 'We thank all the parties for their contributions at the negotiating table and their commitment to the multi-year dialogue that has led to this historic agreement. ' Key elements of the Agreement include: Taseko will receive a payment of $75 million from the Province of BC on closing. Taseko will contribute a 22.5% equity interest in the New Prosperity mineral tenures to a trust for the future benefit of the Tŝilhqot'in Nation. The trust will transfer the property interest to the Tŝilhqot'in Nation when and if it consents to a proposal to pursue mineral development in the project area. Taseko retains a majority interest (77.5%) in the New Prosperity mineral tenures and can divest some or all of its interest at any time, including to other mining companies that could advance a project with the consent of the Tŝilhqot'in Nation. However, Taseko has committed not to be the proponent (operator) of mineral exploration and development activities at New Prosperity, nor the owner of a future mine development. Taseko has entered into a consent agreement with the Tŝilhqot'in Nation, whereby no mineral exploration or development activity can proceed in the New Prosperity project area without the free, prior and informed consent of the Tŝilhqot'in Nation. BC and the Tŝilhqot'in Nation have agreed to negotiate the process by which the consent of the Tŝilhqot'in Nation will be sought for any proposed mining project to proceed through an environmental assessment process. The Tŝilhqot'in Nation and BC have agreed to undertake a land-use planning process for the area of the mineral tenures and a broader area of land within Tŝilhqot'in territory. BC will provide funding to the Tŝilhqot'in Nation to facilitate the land-use planning process and for a Cultural Revitalization Fund. 1 Refer below to 'New Prosperity Mineral Tenures and Mineral Resources' and cautionary note. Jagrup Brar, Minister of Mining and Critical Minerals for BC, commented: ' Resolution of this legal and public conflict has been a priority for this government. These negotiations, which began under the previous mandate, laid important groundwork. The agreement demonstrates B.C.'s commitment to reconciliation and ensuring that the interests of First Nations and mining companies can advance together. I want to recognize all parties to this agreement for their willingness to collaborate to find common ground, build mutual respect, and create a foundation for shared prosperity. We will continue working in partnership to maintain a stable investment climate and future economic benefits for British Columbians .' Christine Boyle, Minister of Indigenous Relations & Reconciliation commented: ' It has taken vision and courage from strong leaders to get us to this significant moment. Together with the Tŝilhqot'in Nation and Taseko Mines Limited, and through this settlement agreement, B.C. is aligning with commitments we've made under previous agreements—such as the Gwets'en Nilt'i Pathway Agreement—to support the Tŝilhqot'in path of self-determination. Through collaborative processes and by working in partnership with First Nations and industry, we will continue to advance reconciliation for the benefit of all .' Nits'ilʔin Roger William, Nits'ilʔin of Xeni Gwet'in, commented: ' This Agreement protects our rights of consent in the Teẑtan Area. That's huge. For over three decades, we've had conflict in the Teẑtan Area. For my oldest son, for many Tŝilhqot'in, that conflict has always been there, for their entire lives. Now we are turning the page. Tŝilhqot'in consent is protected: there is no longer the threat of exploration or mining without our consent. I hold my hands up to everyone that worked hard over the past five years to achieve this historic agreement that reflects true reconciliation, including the Province and Taseko Mines Limited. This is a time to celebrate for our people and honour all those who made this resolution possible .' Nits'ilʔin Lennon Solomon, Nits'ilʔin of Yuneŝit'in, commented: ' This is a historic moment for our people and for reconciliation in British Columbia and Canada. It shows what is possible when we come together in the right spirit to resolve even the deepest conflict. I am honoured to be part of a resolution that finally respects Tŝilhqot'in rights and jurisdiction in the Teẑtan Area, after a generation of conflict. I am grateful that we can move forward as Tŝilhqot'in in a positive way and put our energy and attention into our own priorities as a Nation .' The Agreement is subject to customary conditions and closing of the transaction is expected to occur in June 2025. For further information on Taseko, see the Company's website at or contact: Investor enquiries: Brian Bergot, Vice President, Investor Relations – 778-373-4554 Media enquiries: Sean Magee, Vice President, Corporate Affairs – 778-373-4543 Stuart McDonald President and CEO Background Information History In 2008, Taseko proposed a copper-gold mine known as the Prosperity Project ('Prosperity') and initiated federal and provincial Environmental Assessment ('EA') processes. The Tŝilhqot'in Nation opposed Prosperity, along with proposed mineral exploration and development activities in the area. In 2010, the Province of BC granted Taseko an EA Certificate for development of the Prosperity mine. Subsequently, in 2010, the Government of Canada denied Prosperity its federal EA Certificate and invited Taseko to submit a revised application to address specific issues related to its decision. In 2011, Taseko revised the project design and renamed the project New Prosperity. That same year, Taseko re-initiated federal and provincial EA processes with the updated project design. The Tŝilhqot'in Nation remained opposed to the New Prosperity project. In February 2014, the Government of Canada again denied New Prosperity federal authorization to proceed and again invited Taseko to submit a revised proposal. In June 2014, the Supreme Court of Canada declared Aboriginal title for the first time in Canadian history over an area of Tŝilhqot'in territory that includes lands near the New Prosperity property. In 2017, the Province of BC authorized Taseko to undertake a site investigation program at New Prosperity. Shortly afterward, the Tŝilhqot'in Nation initiated a lawsuit and in 2019, the B.C. Court of Appeal granted an injunction to halt Taseko's site investigation program to allow a full hearing of the case. With the Provincial EA Certificate valid and significant investment by Taseko, legal actions resulted involving the Tŝilhqot'in Nation, Taseko, the Province of BC and Government of Canada. The legal proceedings have focused on environmental assessment decisions by the federal and provincial governments, provincially authorized permits for site work programs, Taseko's proposed work programs, Taseko's mineral tenures, and Tŝilhqot'in proven and asserted Aboriginal rights and title. In 2019, the Tŝilhqot'in Nation and Taseko agreed to pause all court proceedings and regulatory processes in order to enter into a confidential dialogue, facilitated by the Province of BC. The resulting Agreement between Taseko, Tŝilhqot'in Nation, and BC has established a consent-based model for any mine development in the Project area; the parties can now explore long-term solutions outside of litigation. New Prosperity Mineral Tenures and Mineral Resources The New Prosperity mineral tenures consist of a mineral lease and 85 mineral claims owned by Taseko Mines Limited and located southwest of Williams Lake, BC, within the traditional territory of the Tŝilhqot'in Nation. The New Prosperity mineral resource estimate is described in a technical report entitled 'Technical Report on the 344 Million Tonne Increase in the Mineral Reserves at the Prosperity Gold-Copper Project, British Columbia, Canada' with an effective date of November 2, 2009 (the 'Prosperity Technical Report'). New Prosperity is not considered a property material to Taseko as defined by NI 43-101 and no additional work to identify further resources or reserves has been conducted at New Prosperity since the completion of the estimate. The below table sets out the mineral resources previously estimated at New Prosperity: Mineral Resources (effective November 2, 2009 at 0.14% copper cut-off) Metric Tonnes (millions) Copper Grade (%) Gold Grade (g/t) Measured 547 0.27 0.46 Indicated 463 0.21 0.34 Total Measured and Indicated Resources 1,010 0.24 0.41 Additional information regarding data verification, exploration information, known legal, political, environmental or other risks can be found in the Prosperity Technical Report. Due to the uncertainty surrounding the development of the New Prosperity Project and the fact that the Prosperity Technical Report has not been updated since 2009, caution is advised when assessing its conclusions in light of current metal price outlooks, operating and capital costs, appropriate technologies and like matters. No regulatory authority has approved or disapproved of the information contained in this news release Caution Regarding Forward-Looking Information This document contains 'forward-looking statements' that were based on Taseko's expectations, estimates and projections as of the dates as of which those statements were made. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as 'outlook', 'anticipate', 'project', 'target', 'believe', 'estimate', 'expect', 'intend', 'should' and similar expressions. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the Company's actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking statements. These included but are not limited to: uncertainties about the future market price of copper and the other metals that we produce or may seek to produce; changes in general economic conditions, the financial markets, inflation and interest rates and in the demand and market price for our input costs, such as diesel fuel, reagents, steel, concrete, electricity and other forms of energy, mining equipment, and fluctuations in exchange rates, particularly with respect to the value of the U.S. dollar and Canadian dollar, and the continued availability of capital and financing; uncertainties about economic conditions generally including inflation levels, tariffs, and in particular with respect to the demand for copper and other metals we produce; uncertainties related to the accuracy of our estimates of Mineral Resources, production rates and timing of production, future production and future cash and total costs of production and milling; uncertainties related to whether the Tŝilhqot'in Nation will consent to advancement of New Prosperity, whether a new proponent for New Prosperity can be identified, and that the Mineral Resources at New Prosperity will ever be exploited; uncertainties with our ability to monetize our interest in the New Prosperity Project on economic terms or at all; our ability to comply with the extensive governmental regulation to which our business is subject; uncertainties related to our ability to obtain necessary title, licenses and permits for our development projects and project delays due to third party opposition; uncertainties related to First Nations claims and consultation issues; uncertainties related to unexpected judicial or regulatory proceedings; changes in, and the effects of, the laws, regulations and government policies affecting our exploration and development activities and mining operations and mine closure and bonding requirements; environmental issues and liabilities associated with mining; environmental hazards and risks associated with climate change, including the potential for damage to infrastructure and stoppages of operations due to forest fires, flooding, drought, or other natural events in the vicinity of our operations; litigation risks and the inherent uncertainty of litigation; our actual costs of reclamation and mine closure may exceed our current estimates of these liabilities; our ability to meet the financial reclamation security requirements; the capital intensive nature of our business both to sustain current mining operations and to develop any new projects,; our reliance upon key management and operating personnel; the competitive environment in which we operate; the risk of changes in accounting policies and methods we use to report our financial condition, including uncertainties associated with critical accounting assumptions and estimates; and Management Discussion and Analysis ('MD&A'), quarterly reports and material change reports filed with and furnished to securities regulators, and those risks which are discussed under the heading 'Risk Factors'. For further information on Taseko, investors should review the Company's annual Form 40-F filing with the United States Securities and Exchange Commission and home jurisdiction filings that are available at including the 'Risk Factors' included in our Annual Information Form. Disclaimer: The above press release comes to you under an arrangement with GlobeNewswire. Business Upturn takes no editorial responsibility for the same. GlobeNewswire provides press release distribution services globally, with substantial operations in North America and Europe.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store