
CICR developing genome editing technique for higher cotton yield
2
Nagpur: The Central Institute of Cotton Research (CICR) is now working on a technique to tweak the DNA of cotton plants to ensure higher yield. This method, called genome editing, is among the latest techniques adopted for agricultural research in the country.
Genome editing is different from the more complex genetic engineering technology, which involves introducing an additional gene. Cotton farmers are currently using Bt cotton, a genetically engineered variety with an additional gene that provides resistance to the bollworm pest.
Speaking to TOI on the sidelines of a seminar on climate-resilient farming, CICR director VN Waghmare said that genetic editing involves changes in DNA sequencing.
The aim is to develop compact cotton plants with higher boll formation. It may take another two or three years to achieve the results, he said.
Former director of CICR, CD Mayee, said that the Indian Council of Agriculture Research (ICAR) is also encouraging the use of genome editing. Recently, new varieties of paddy were released, which can help in developing varieties suitable for dry conditions.
Regarding the reports on rampant use of illegal herbicide-tolerant (HT) seeds in the region, Waghmare said it may not be a prudent idea. This is because farmers here adopt the practice of inter-cropping, where no single crop is grown on a stretch. This means that even if farmers use HT seeds, they won't be able to use weed killers due to the presence of other plants.
Waghmare noted that areas in predominantly paddy belts have also started growing cotton. For example, the trend has begun in Gadchiroli too. Farmers are adopting it because of the rugged nature of the crop.
Get the latest lifestyle updates on Times of India, along with
Doctor's Day 2025
,
messages
and quotes!

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
13 hours ago
- Time of India
Firms pump Rs 1,200cr: Bid that won PPP project for 12 Earth Observation satellites quoted Rs 0; Pixxel-led team wins deal
BENGALURU: In what's unprecedented, the L1 quotation (lowest bid) by a consortium that won a project for 12 Earth Observation (EO) satellites - implemented as a PPP by IN-SPACe - is 0 (zero rupees). The consortium comprising Pixxel, PierSight, SatSure, and Dhruva, which will bear the financial cost of the project, will invest more than 1,200 crore in the next four-five years on this. Pawan Goenka, chairman of IN-SPACe, told TOI in a one-on-one interaction: "Obviously this was a competitive bid and each of the bidders would have evaluated the value of the opportunity to build this constellation. In the judgment of the winning bidder, they decided that even if they don't get any money from the govt, it is important for them to get this opportunity to develop it and, therefore, they see a good financial opportunity in this constellation. " You Can Also Check: Bengaluru AQI | Weather in Bengaluru | Bank Holidays in Bengaluru | Public Holidays in Bengaluru | Gold Rates Today in Bengaluru | Silver Rates Today in Bengaluru Terming it a very big endorsement of how the private sector sees the future of space economy in India, he said: "... for a consortium to come forward and commit to invest more than 1,200 crore of their own money with a full expectation, obviously, that they will more than recover their investment over a period of time. So, I think it's very, very positive news that the winning bidder has bid only zero." As reported by TOI on Wednesday, the constellation of 12 satellites will feature a mix of sub-metre very high-resolution, wide-swath multispectral, synthetic aperture radar (SAR), and hyperspectral satellites, enabling applications like precision agriculture, water quality monitoring, land-use mapping, environmental compliance, disaster assessment, maritime operations, national security, and infrastructure development. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like 15 Most Beautiful Women Ever Today's NYC Undo The project will be implemented through a special purpose vehicle (SPV). "We have a time limit of 90 days for signing the agreement starting yesterday. Hopefully, we sign much before that. As per the RFP, the lead player must have at least 26% ownership and each consortium member at least 10%. It will be a legal entity formed with well-defined roles for each of the four members," he said. Stay updated with the latest local news from your city on Times of India (TOI). Check upcoming bank holidays , public holidays , and current gold rates and silver prices in your area.


Time of India
2 days ago
- Time of India
IIT-Kanpur admits 5 students without JEE Advanced; cites Olympiad excellence
LUCKNOW: Bypassing the traditional JEE Advanced route, IIT-Kanpur has admitted five students to its Bachelor of Science (BS) and Bachelor of Technology (BTech) programmes based solely on their performance in international science Olympiads and training camps. IIT-Madras has also launched distinct admission pathways, including Sports Excellence Admission (SEA) and Science Olympiad Excellence Admissions (SCOPE). Recently, IIT-Gandhinagar also announced admissions through the Olympiad route, with specific criteria and guidelines published on its site. IIT-Bombay has also announced to admit students into its BS Mathematics programme through the Indian National Mathematical Olympiad (INMO) pathway. Talking to TOI, IIT-K director Prof Manindra Agrawal said: "We are happy to note that five students have been admitted through the Olympiad programme at IIT-Kanpur. We initiated this channel to admit bright students who may not be able to do well in JEE Advanced due to their preoccupation with Olympiad training." "We hope that this will motivate our bright students to train seriously for the Olympiad and bring laurels to the country," Prof Agrawal said. Stay updated with the latest local news from your city on Times of India (TOI). Check upcoming bank holidays , public holidays , and current gold rates and silver prices in your area.


Time of India
2 days ago
- Time of India
Upgrade project on hold, DAVV shifts focus to repairing existing buildings
Indore: Devi Ahilya Vishwavidyalaya's (DAVV) much-awaited infrastructure expansion on the Takshashila campus has hit yet another pause, as the university has shifted its focus from constructing new buildings to maintaining and optimising its existing ones. The Rs 153-crore project, which was approved last year as part of the varsity's Vision 2030 plan, is now stuck in repeated reviews. Vice-chancellor Prof Rakesh Singhai said the decision was made after closely inspecting the current state of university facilities. "After visiting all departments, I noticed that the existing buildings are not being maintained. Some walls are damaged, and certain departments operate from very old structures that need urgent repairs. We have shifted our priority to maintaining these first," he told TOI. Prof Singhai also highlighted underutilised spaces as a major concern. "Many departments have extra rooms being used as storehouses for old files, papers, and even electronic waste. We plan to clear such spaces and use them productively. Terrace areas can also be repurposed, reducing the need for entirely new constructions. The focus is now on making the most of our current infrastructure," added the VC. The varsity's Takshashila campus upgrade, planned last year in collaboration with the Indore Development Authority (IDA), aimed to construct new buildings for four major teaching departments: the International Institute of Professional Studies (Rs 31 crore), School of Law (Rs 8 crore), School of Economics (Rs 19 crore), and School of Social Sciences (Rs 11 crore). The expansion would have doubled classroom capacity for some departments and added over 15,000 square metres of academic space. Additional plans included a Rs 23-crore Central Research Instrumentation Center under the PM Usha Scheme, housing the IT Centre and Data Science Department, a Rs 2.5-crore 300-seat auditorium, and a Rs 2.7-crore administrative block at the Nalanda campus. The previous administration under former VC Prof Renu Jain decided to execute Rs 99 crore of the works through IDA, with the rest handled by other agencies. Funding was to come from fixed deposits worth Rs 57 crore from IIPS, Rs 25 crore from other departments, and Rs 15 crore from the PM Usha Scheme. However, the tendering process was halted by Prof Singhai with a plan to rework the designs of the building, focusing more on vertical buildings instead of constructing buildings horizontally to utilise space. "The revised plan for the construction is ready. However, after the thorough evaluation of the departments and existing infrastructure, a decision will be taken on the construction of new buildings," said Prof Singhai. While the administration assures that the pause is strategic and cost-effective, concerns remain over how soon DAVV's long-delayed infrastructure dreams will take shape. Stay updated with the latest local news from your city on Times of India (TOI). Check upcoming bank holidays , public holidays , and current gold rates and silver prices in your area.