
Leh-bound IndiGo flight returns to Delhi due to technical issue, passengers put on another flight
New Delhi: A Leh-bound IndiGo flight returned to Delhi on Thursday morning after being airborne for nearly two hours because technical problems were detected that could have caused operational restrictions while landing in Leh.
The flight landed safely in Delhi. An alternative flight later departed from Delhi with the same passengers and reached Leh around noon.
The Delhi-Leh flight usually takes 1 hour and 20 minutes. The IndiGo flight 6E2006, with nearly 140 passengers, took off from IGI Airport at 6.30am on Thursday and was scheduled to land at the airport in Leh at 7.50am. After the aircraft had flown more than half the distance, it was forced to return following a technical issue.
"After the flight was diverted to Delhi, it landed around 8.30am at IGI Airport. All passengers and crew members safely disembarked," an airport official said.
IndiGo said in a statement that the flight, 6E 2006, returned to the origin airport due to a technical issue which caused operational restrictions while landing. "As per procedures, the pilot returned to Delhi. The aircraft is undergoing necessary maintenance before resuming operations.
by Taboola
by Taboola
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
Villa For Sale in Dubai Might Surprise You
Villas in Dubai | Search ads
Learn More
Undo
In the meantime, an alternative aircraft has been arranged for to fly the customers to Leh," the statement said.
The alternative flight took off around 10.30am and landed in Leh close to noon.
Similar incidents have occurred in the past. An Aeroflot aircraft, which took off from Bangkok for Moscow, was forced to make an emergency landing at
Delhi airport
on May 6. The aircraft, SU273, was diverted to Delhi due to suspected fumes in the cabin.
The flight landed safely, an official said.
In April, a Jeddah-Delhi flight made an emergency landing at IGI Airport after a suspected flat tyre. The flight with 404 passengers landed safely. In May last year, a Delhi-Bengaluru Air India flight was forced to return mid-air and made an emergency landing at Delhi after a fire warning from its auxiliary power unit.
In July 2023, a Kolkata-bound flight was forced to return mid-air to Delhi airport due to some technical glitch.
On June 21, 2023, a Delhi to Dehradun flight returned to IGI because of some technical glitch.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
23 minutes ago
- Time of India
‘Trash talk' gets smarter: Solar-powered centre to collect e-waste at Khan Market
New Delhi: To reduce the burden on landfills by strengthening decentralised community-centric initiatives, New Delhi Municipal Council, along with NGO Chintan, has set up a solar-powered micro material recovery facility (MMRF) at Khan Market. The initiative is part of a larger plan to operationalise eight decentralised centres across the NDMC areas, each designed to tackle specific waste streams through collection, segregation, repair, reuse, upcycling and safe disposal, in line with Solid Waste Management Rules 2016. These are basically dhalaos that have been converted into MMRF plus reduce, reuse, recycle centres. This facility will specialise in e-waste collection and their responsible handover for disposal. The site, located close to the parking for public convenience, will facilitate the collection of waste such as old shoes, clothes, paper, books, domestic hazardous waste and, most importantly, various e-waste items. "We had a facility here earlier, but now this is revamped properly. We have placed multiple boxes, specifying the items that can be dropped in each of them. Besides paper and mixed plastic, separate sections are made for dumping batteries, stereos, keyboards or tablets, wires and earphone chargers, considering all these electronic items are processed separately," said an NGO representative. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like No dark spots, 10 years younger! Just take this from Guardian URUHIME MOMOKO Learn More Undo "We also have a machine to compress plastic bottles. Collected and segregated waste will be transferred to registered processing units." Launching the facility along with Chintan founder Bharati Chaturvedi, NDMC chairman Keshav Chandra said, "We encourage NDMC waste generators to participate in this project by dropping off their waste or calling for a pickup." Another key feature is a solar panel of 1kW capacity installed at the entrance to run the fan and lights and the weighing machines at the centre. "It will showcase how renewable, green energy can fight heat, improve health and also enable more efficient waste management," said Chaturvedi. NDMC has come across many new waste streams, from textile waste to shoes, said medical officer of health Dr Shakuntala Srivastava. "Trained waste pickers, integrated into the formal waste system, will manage operations, strengthening both environmental sustainability and livelihoods," said an official.


Time of India
an hour ago
- Time of India
RTI revelation exposes massive over-allocation of Hidkal dam water to industries
Belagavi: In a significant development that could intensify the ongoing opposition to the diversion of Hidkal Dam water to industries in Hubballi-Dharwad, activist and whistleblower Sujit Mulgund unveiled official documents revealing that industrial units received nearly 22 times more water than the original allocation. Mulgund shared a letter from the assistant executive engineer of the Karnataka Niravari Nigam Limited (KNNL), CBC subdivision No. 2, dated July 6, 2024. The letter, addressed to the executive engineer, discloses that only 0.1 tmcft of water was initially allocated to industries under the project report. However, the allocation surged to 0.2 tmcft gradually, and there is an additional fresh demand of 0.5 tmcft under the Bengaluru-Mumbai Industrial Corridor Project, part of the Suvarna Karnataka Corridor initiative. Crucially, the letter indicates that the excess allocation already far surpassed the sanctioned limit. If the additional 0.5 tmcft is approved, it would come at the cost of irrigation water meant for farmers, a point likely to fuel further unrest among farming communities. Last month, the Karnataka govt approved the controversial diversion of 0.5 tmcft from Hidkal Dam to industrial areas in Hubballi-Dharwad, sparking widespread protests across Belagavi and neighbouring districts. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Free P2,000 GCash eGift UnionBank Credit Card Apply Now Undo Farmers and civil society groups decried the move, arguing it threatens their livelihood and violates the dam's original purpose. Earlier, water resources minister MB Patil claimed that the water being diverted was within the allocated limits. However, Mulgund's findings—obtained through the Right to Information (RTI) Act—contradict the minister's statement. Pipeline construction for the water diversion began over four months ago—without formal approval, tenders, or even informing the local administration, including district minister Satish Jarkiholi. The work only came to light when local farmers discovered pipelines being laid across their fields. In response, several organisations launched protests under the slogan 'Namma Neeru, Namma Hakku', prompting the Belagavi DC to halt the work temporarily. Despite the opposition, the project resumed following a green signal from the state cabinet. Activist Mulgund sought further details under RTI—including the tender cost, official approvals, and progress reports—but KNNL denied the information, citing confidentiality. Constructed in 1961 and named after former prime minister Lal Bahadur Shastri, the Hidkal dam was built to provide irrigation and drinking water. Though it has a storage capacity of 51 tmcft, effective availability is only around 44 tmcft due to siltation and unusable reserves. Speaking to the TOI, Mulgund criticised the lack of transparency. "The RTI documents clearly prove that more water has already been diverted to industries than originally sanctioned. Any additional diversion will directly impact farmers in Belagavi, Bagalkot and Vijayapura," he said.


Time of India
an hour ago
- Time of India
Chandigarh tops India in school education report
Chandigarh: Chandigarh has secured the top position in the Government of India's Performance Grading Index (PGI) 2.0, an annual assessment of school education systems across states and union territories, for two consecutive years — 2022-23 and 2023-24 — emerging as the only state or UT to reach the Prachesta-1 grade in either year. No other region crossed into even the next higher grade band, making Chandigarh's lead both significant and solitary. Its overall score improved from 688 in 2022–23 to 703 in 2023–24, driven by gains in infrastructure, access, and governance. However, the data also reveals specific areas where Chandigarh did not lead the country, particularly in governance processes, teacher education, and learning outcomes—domains where other states and UTs outperformed it. In governance processes, it scored 76.7 out of 130, remaining in the Prachesta-1 band. In comparison, Gujarat scored 87.8, while Odisha and Haryana also performed better in this domain. These governance indicators include digital fund transfers, student and teacher attendance systems, and timely data reporting—areas where Chandigarh still has room to strengthen implementation. Similarly, in the teacher education and training domain, Chandigarh scored 85.7 out of 100, placing it in the Utkarsh category. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Godrej Majesty | Luxurious 3 & 4 BHK Homes at ₹2.39 Cr* Godrej Majesty Learn More Undo However, Kerala, with a score of 91.4, became the only state or UT to achieve the topmost Daksh grade in this domain. This suggests scope for further enhancement in teacher qualification standards and in-service training in Chandigarh. Even in access, where Chandigarh had previously achieved the Daksh grade (2022–23), its score marginally declined from 72.9 to 72.4 in 2023–24, falling into the Utkarsh range. By contrast, Puducherry retained the Daksh grade in access this year. Nonetheless, Chandigarh's overall leadership reflects robust progress across most domains. It scored 148.0 out of 190 in Infrastructure & Facilities and 216.5 out of 260 in Equity, placing it in the Atti-Uttam and Utkarsh grades respectively. This success builds on several initiatives: 100% retention at all levels, 450 co-located Anganwadi centres, expanded vocational training, kitchen gardens in all government schools, and the installation of sanitary pad vending machines in previously uncovered institutions. The UT also leads in digital readiness, having implemented digital attendance in all government schools and seeded over 98% of student records with Aadhaar in the UDISE+ system. Social audits were introduced under the PM POSHAN scheme in 2023–24, and all children with special needs (CWSN) were provided with assistive devices. Importantly, Chandigarh maintained a consistent score of 103.6 in Learning Outcomes for three consecutive years, though no state or UT showed improvement here due to the reliance on NAS 2021 data. While the PGI 2.0 results are not directly comparable to earlier PGI formats, Chandigarh has ranked first nationally for three years in a row under the updated methodology. The next round may bring further movement, as results from the 2024 PARAKH national assessment—expected in July 2025—will inform updates in the Learning Outcomes and Equity domains. PGI 2.0 continues to serve as a powerful tool for states and UTs to monitor school education quality, push reforms, and work toward the goals set by the National Education Policy 2020 and Sustainable Development Goal 4. BOX-Domain-wise scores Learning outcomes (out of 240) 2022–23: 103.6 2023–24: 103.6 Access (out of 80) 2022–23: 72.9 2023–24: 72.4 Infrastructure and Facilities (out of 190) 2022–23: 136.5 2023–24: 148.0 Equity (out of 260) 2022–23: 216.4 2023–24: 216.5 Governance Processes (out of 130) 2022–23: 74.0 2023–24: 76.7 Teacher Education and Training (out of 100) 2022–23: 84.3 2023–24: 85.7 Total Score (out of 1000) 2022–23: 688 2023–24: 703 Overall Grade 2022–23: Prachesta-2 2023–24: Prachesta-1 BOX- What Chandigarh did well 100% retention at all school levels Three-year pre-primary cycle introduced in all government schools Digital attendance implemented in all government schools 450 Anganwadis co-located with schools Vocational education expanded from 38 to 47 government schools Kitchen gardens started in all government schools Over 98% students Aadhaar-seeded in UDISE+ Social audits conducted under PM POSHAN scheme Assistive devices provided to all CWSN (Children with special needs) students BOX- Where others outperformed Governance Processes: Chandigarh scored 76.7 out of 130 (Prachesta-1), while Gujarat scored 87.8, outperforming it in digital systems and fund disbursals. Teacher Education and Training: Chandigarh scored 85.7 (Utkarsh), but Kerala crossed into the Daksh category with 91.4, indicating stronger professional development standards. Access: Chandigarh slipped slightly from Daksh to Utkarsh (72.4 out of 80). Puducherry retained Daksh, reflecting stronger gains in enrolment and early learning participation. No domain-level top grade: Chandigarh did not achieve Daksh (top grade) in any individual domain, while Kerala and Delhi each did so in one.