logo
Nuke energy is the way forward for Malaysia: Expert

Nuke energy is the way forward for Malaysia: Expert

Daily Express16 hours ago
Published on: Wednesday, August 20, 2025
Published on: Wed, Aug 20, 2025
By: Sisca Humphrey Text Size: Dr Pa'iza also pointed to innovations developed by the Malaysian Nuclear Agency, including the G2-Tag Radig Meter, a GPS-enabled gamma radiation device and the WinDR15.3 smart radiography winder system, both aimed at strengthening radiation safety practices. Kota Kinabalu: Nuclear energy could play a pivotal role in Malaysia's future energy security if safety standards and public acceptance are prioritised, said Malaysian Nuclear Agency Senior Director (Commercialisation and Planning Programme) Dr Nor Pa'iza Mohamad Hasan. Delivering his special keynote at the Radiation Protection Conference and Workshop 2025 (RPCW25) here on Monday, Dr Pa'iza said the urgent need to balance the nation's growing energy demands with strict safety and environmental protection.
Advertisement 'Energy security means having a reliable and affordable supply of energy sources. 'To secure the future, we must expand our capacity and diversify our energy mix while safeguarding people, the environment and national stability,' he said. Malaysia currently relies on fossil fuels for about 80 per cent of its electricity generation, although this share has declined from 90 per cent in 2001. With coal plants totalling 12,200MW scheduled to phase out by 2045, Dr Pa'iza warned that Malaysia risks increasing dependence on imported natural gas if sustainable alternatives are not developed. The Government has already placed nuclear energy under review as part of the country's long-term power mix. Prime Minister Datuk Seri Anwar Ibrahim, in tabling the 13th Malaysia Plan recently, described nuclear as a potential safe, competitive, and clean option. Globally, nuclear energy is regaining momentum, with 371.5 gigawatts of power generated from 413 reactors in 31 countries at the end of 2023. A further 62 reactors are under construction worldwide, with Small Modular Reactors (SMRs) emerging as a flexible, safer and more adaptable technology. Dr Pa'iza also pointed to innovations developed by the Malaysian Nuclear Agency, including the G2-Tag Radig Meter, a GPS-enabled gamma radiation device and the WinDR15.3 smart radiography winder system, both aimed at strengthening radiation safety practices. Citing Finland's experience as an example, he stressed the importance of strong regulation, public engagement, transparency, long-term waste management solutions and cultivating a robust safety culture. 'Radiation safety is not negotiable. To move forward, we need stronger regulatory capacity, human capital development, collaboration in research and continuous investment in safety technologies,' he said. Dr Pa'iza are urging Malaysians to prepare for the possibility of a nuclear-powered future. 'Nuclear energy enhances security, radiation safety ensures sustainability. The balance is not just possible, it is essential. The question is: are we ready for nuclear power?' he said. * Follow us on our official WhatsApp channel and Telegram for breaking news alerts and key updates! * Do you have access to the Daily Express e-paper and online exclusive news? Check out subscription plans available.
Stay up-to-date by following Daily Express's Telegram channel. Daily Express Malaysia
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

PWD orders catch-up plans for delayed projects, highlights RM611 bil 13MP chance
PWD orders catch-up plans for delayed projects, highlights RM611 bil 13MP chance

New Straits Times

time4 hours ago

  • New Straits Times

PWD orders catch-up plans for delayed projects, highlights RM611 bil 13MP chance

BATU PAHAT: All Public Works Department (PWD) projects that have fallen behind schedule must submit a "catch-up" or rescheduling plan to ensure timely completion. Deputy Works Minister Datuk Seri Dr Ahmad Maslan said the directive applies nationwide to projects under PWD that are less than 10 per cent behind the initial completion timeline. "The ministry has instructed we produce more 'ahead of time' (AOT) lists instead of 'extension of time' (EOT). Projects must meet the original timeline or schedule," he said after visiting the Batu Pahat PWD office today. Ahmad said catch-up methods may include increasing manpower, adopting new technologies and introducing extra shift work. "For example, in Sabah, a housing project for the Armed Forces used three shifts to catch up. Each shift worked eight hours with different workers. "At night, they carried out tasks that did not disturb residents, such as painting and using machineries that were not noisy. "This is what a catch-up plan means. We want projects to achieve AOT, not EOT," he said. On a separate matter, Ahmad urged all contractors from grades G1 to G7 to seize opportunities in the upcoming government projects listed under 13th Malaysia Plan (13MP), tabled by Prime Minister Datuk Seri Anwar Ibrahim recently. He said of the RM611 billion allocated for 13MP, a large portion was for development projects, which directly involved the construction industry. "The construction industry is for contractors. I have reminded all contractors to not miss this chance, as the next one is five years away. "Plus, under 13MP, the allocation is larger than 12MP, which was only RM400 billion. "Of the RM611 billion, RM430 billion is government allocation, RM120 billion from government-linked companies (GLCs) and government-linked investment companies (GLICs), while RM61 billion will come from public-private partnerships," he said. Also present at the visit were Johor PWD director Ir Zainal Tumian and district PWD engineer Ir Fairul Azrie Yaacob.

Govt boosts R&D investment for industry competitiveness in Malaysia
Govt boosts R&D investment for industry competitiveness in Malaysia

The Sun

time4 hours ago

  • The Sun

Govt boosts R&D investment for industry competitiveness in Malaysia

KUALA LUMPUR: The government supports increasing investment in research and development activities that focus on enhancing industrial sector competitiveness. Minister of Science, Technology and Innovation Chang Lih Kang identified insufficient returns on current R&D investments as a primary national challenge. He stated that most research currently remains in pre-commercialization phases requiring advancement toward market readiness. Chang addressed these concerns during his winding-up speech for the 13th Malaysia Plan debate in Parliament today. His remarks responded directly to proposals from Kubang Pasu member Datuk Dr Ku Abd Rahman Ku Ismail regarding R&D funding increases. The minister highlighted regional technology development through ASEAN Startup as a promising solution to attract talent. Regional collaboration efforts could bring more technology professionals to establish businesses in Malaysia. This influx would significantly boost the country's research and development competitiveness according to the ministry. Experimental R&D investment data shows a promising increase to 60.97 percent in 2022. However only 0.3 percent of business enterprises currently invest in research and development activities. This statistic reveals limited private sector participation in research funding initiatives. Chang emphasized the need for special incentives to stimulate greater corporate investment interest. MOSTI has implemented various measures including the Malaysia Science Endowment program. This initiative develops alternative financing through collaborative partnerships across multiple sectors. The ministry also launched mission-based initiatives under the Mission Oriented Initiative framework. This approach unifies research, development, innovation, and commercialization under strategic national missions.

Malaysia enters phase two of water sector roadmap 2040 under 13MP
Malaysia enters phase two of water sector roadmap 2040 under 13MP

The Sun

time4 hours ago

  • The Sun

Malaysia enters phase two of water sector roadmap 2040 under 13MP

KUALA LUMPUR: Malaysia is now moving into the second phase of the Water Sector Transformation Roadmap 2040 under the 13th Malaysia Plan to develop local technology that meets international standards. Deputy Prime Minister Datuk Seri Fadillah Yusof made this announcement during the opening ceremony of the Langat 2 Water Treatment Plant. He stated that AIR2040 aims to ensure affordable, sufficient, clean and quality water supply for the people. The roadmap also serves as a national agenda to transform the water sector into a dynamic economic sector. It will drive development and innovation of local water technology through strategic collaboration. Fadillah highlighted the Langat 2 Water Treatment Plant as proof of local capability in large-scale water infrastructure. The plant features modern water treatment technology meeting international standards. He acknowledged that such infrastructure projects involve high costs due to modern technology. Pengurusan Aset Air Berhad played the role of financier and implementer for this project. This enabled construction at more optimal costs compared to commercial financing. Fadillah serves as both Deputy Prime Minister and Minister of Energy Transition and Water Transformation. Under national restructuring, PAAB manages financing for water supply infrastructure in participating states. The financing model allows water operators to focus on operation and maintenance. This ensures management efficiency within the water supply system. It also helps maintain resilient and stable financial positions for water operators. AIR2040 plans to introduce alternative financing to strengthen sector sustainability. This approach reduces dependence on government funds for water projects. The ministry is exploring alternative water sources like reclaimed water for industrial use. Non-food industrial applications such as data centers are being considered. PETRA is focusing on reducing Non-Revenue Water through the 13MP. The Critical Pipe Replacement Programme will address this issue nationwide. Holistic NRW solutions and rebates for meeting targets form part of this effort. The NRW rate is expected to drop to 28.8 percent by 2030 through these programmes. Cooperation with state governments will continue for planning new water infrastructure. This ensures water supply needs for domestic and industrial users are met. State development requirements remain a priority in water infrastructure planning. - Bernama

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store