
Bengaluru Metro Phase 3: Operator brings down tree loss estimate to 6,000
While the initial figure stood at around 11,000, BMRCL's environment wing has now revised this to approximately 6,800 trees after an internal assessment.
"All 6,000-plus trees will not be removed. Some will be cut, some transplanted, and some retained," said Kanakaraj MH, assistant engineer (environment), BMRCL, adding that the exact number would depend on the ground situation during construction. The statement came after environmentalists raised serious concerns about the impact of Metro expansion on Bengaluru's green cover.
Activists demanded greater transparency and access to data on how many trees will be felled, pruned, or relocated, and the exact locations of transplantation efforts.
A public consultation meeting on the matter was held Monday.
Parvathi Srirama, an environmental activist present at the meeting, said: "They are telling everything orally. We want statistics. How many trees are going to be saved correctly? How many trees are going to be pruned? How many are they relocating and where? What are the species? What is the age of the trees?"
You Can Also Check:
Bengaluru AQI
|
Weather in Bengaluru
|
Bank Holidays in Bengaluru
|
Public Holidays in Bengaluru
Responding to concerns about rising air and noise pollution following previous construction phases, Kanakaraj acknowledged that Metro work does contribute to the city's air quality issues.
by Taboola
by Taboola
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
Many Are Watching Tariffs - Few Are Watching What Nvidia Just Launched
Seeking Alpha
Read More
Undo
"But there are multiple sectors adding to pollution. It's not always high," he added.
BMRCL officials reiterated their commitment to compensating for the loss of green cover. For every tree removed, the agency has pledged to plant 10 new saplings within city limits and maintain them for at least three years. However, environmentalists questioned the status of compensatory plantations carried out for earlier Metro phases and sought data on the survival rates of transplanted trees.
The Environmental Impact Assessment (EIA) report on Phase 3 is currently being finalised. "We have asked the public and NGOs for their point of view. We are noting it down. The EIA report is on the verge of completion," Kanakaraj said. According to sources, the report is expected to be ready for review by Aug and will likely be published in Oct.
Phase 3 of Metro will add 44km to the network, providing new connections to the traffic-heavy western section of the Outer Ring Road.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Indian Express
11 minutes ago
- Indian Express
Centre to assess green nod for Etalin dam in Arunachal, days after China breaks ground on world's largest hydel project
An expert panel of the Union environment ministry is slated to consider next week environmental clearance for the 3,087-MW Etalin hydel project in Dibang valley, Arunachal Pradesh, days after China officially kick-started work on the world's largest hydroelectric project (of 60 gigawatt) on the Yarlung Zangbo river upstream of India. The ministry on June 20 granted in-principle approval for the diversion of 1,175 hectares of prime forest land in Dibang Valley, Arunachal Pradesh, for the Etalin project. The forest area is classified as subtropical pine forest, wet evergreen, semi-evergreen, montane wet temperate, and moist alpine scrub. The area is also home to wide-ranging biodiversity of wildlife and plants. The forest area to be used is largely community-owned, and 2.7 lakh trees will be axed. Etalin has been proposed as a run-of-the-river project on the Dri and Talo rivers, involving the construction of concrete gravity dams to divert water through two separate waterway systems. A run-of-the-river project involves negligible or no water storage. The Dri and Talo rivers are tributaries of the Dibang river, which feeds into Brahmaputra's waters. China's project has raised concerns that it will affect the water regime and security in the Brahmaputra basin downstream. The Central Electricity Authority has concurred on 13 hydroelectric projects in Arunachal Pradesh, with a total planned installed capacity of 13,798 MW, as per the Union power ministry's reply to the Lok Sabha on April 3. Besides, the Subansiri Lower, Dibang multipurpose, and Lower Kopli (Assam) projects are under construction, totalling a planned capacity of 5,000 MW. The project developer, Satluj Jal Vidyut Nigam (SJVN) Ltd, has placed the project proposal for clearance before the environment ministry's expert appraisal committee (EAC) on river valley and hydroelectric sector. The EAC recommended the project for environmental clearance in 2017. However, since the in-principle forest clearance was received only last month, the committee will appraise the project again. This is based on clarifications issued by the ministry in three office memorandums regarding the process to be followed if forest clearance is given over three years after a proposal was initially recommended for environmental clearance. The ministry's office memorandums state that if the data collected for the preparation of an environmental impact assessment (EIA) report is over three years old, the proposal has to be referred back to the EAC for a relook. An EIA report is a detailed pre-clearance study that assesses a project's impact on environmental, wildlife, ecology and communities likely to be impacted. The Etalin project's EIA report dates back to 2015. 'In such a situation, the EAC may get fresh data collected and, based on that and after due diligence, either reiterate its earlier recommendations or decide to reappraise the project proposal on valid grounds, as the case may be,' as per three previous office memorandums of the environment ministry. As far as a fresh public hearing is concerned, the ministry's expert panel can ask for a fresh one to be conducted as well as seek additional documents and information. In 2022, the environment ministry's forest advisory committee rejected forest approval for the Etalin project and asked for a fresh proposal on account of wildlife and biodiversity concerns. '18 villages and 216 households to be affected' SJVN has submitted baseline data from December 2024 for the winter season and April 2025 for the pre-monsoon period, documents submitted to the ministry show. 'To ensure that outdated baseline data does not hinder the EAC in reiterating its recommendation, fresh baseline data has been collected for two seasons and compared with the data collected in 2012,' the company said in documents filed with the ministry. SJVN has submitted an addendum to the 2015 EIA report and environment management plan for the committee's consideration. Eighteen villages and 216 households will be affected due to land acquisition for the project, as per this new submission. If approved, the Etalin project will be the largest run-of-the-river hydroelectric project in India. Even though the Upper Siang storage-based hydel project will be more massive, with a proposed capacity of 10,000 MW, it is yet to take off with a pre-feasibility report under preparation amid strong local protests on displacement concerns. An award-winning journalist with 14 years of experience, Nikhil Ghanekar is an Assistant Editor with the National Bureau [Government] of The Indian Express in New Delhi. He primarily covers environmental policy matters which involve tracking key decisions and inner workings of the Ministry of Environment, Forest and Climate Change. He also covers the functioning of the National Green Tribunal and writes on the impact of environmental policies on wildlife conservation, forestry issues and climate change. Nikhil joined The Indian Express in 2024. Originally from Mumbai, he has worked in publications such as Tehelka, Hindustan Times, DNA Newspaper, News18 and Indiaspend. In the past 14 years, he has written on a range of subjects such as sports, current affairs, civic issues, city centric environment news, central government policies and politics. ... Read More


Time of India
2 hours ago
- Time of India
6 killed, 8 injured as 4-storey house falls in northeast Delhi
NEW DELHI: Six of a family, including a two-year-old girl, lost their lives, and eight others were injured when a four-storey building collapsed early Saturday morning in Janta Colony, in northeast Delhi's Seelampur. Police have registered a case of negligence and are investigating whether water seepage or poor construction contributed to the collapse. Police said the building's three top floors had collapsed. As it stood amid a dense cluster of houses, two adjacent buildings also suffered damage. Among the dead were house owner Matloob, 50, his wife Rabia, 46, and their children Javed, 23, Abdulla, 15, and Zubia, 27, as well as Zubia's two-year-old daughter, Fozia. All six were on first floor, which sustained maximum damage. Seepage, Poor Construction Likely Causes You Can Also Check: Delhi AQI | Weather in Delhi | Bank Holidays in Delhi | Public Holidays in Delhi According to police, they received a call regarding the building collapse around 7.05 am. Rescue operations were launched immediately in coordination with the fire department and the National Disaster Response Force (NDRF). Seven fire tenders, around 42 firefighters, and NDRF teams with canine units were deployed for the rescue effort. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Better Sleep, Better Mornings Start Here ResMed Buy Now Undo However, the narrow and congested lanes of the locality significantly hampered the operation. Apart from those dead, other family members - Parvez, 32, his wife Siza, 21, their 14-month-old son Ahmad, and Parvez's brother Naved, 19 - were on the upper floor and sustained injuries. Matloob, the building owner, ran a dry cleaning and stitching shop. The family had shifted to the building six months ago after the accommodation where they previously lived caught fire. Residents in the vicinity claimed that they felt a sudden jolt, similar to an earthquake, when the incident occurred. Upon hearing the loud noise, they rushed out of their homes to assess the situation, only to find the area shrouded in darkness. The street was covered in a haze of smoke due to the collapse. It took some time for the situation to settle down, as people struggled to comprehend the extent of the damage and the cause of the disturbance. Police added an anganwadi centre was functioning on the ground floor of the building, but it was closed at the time of the incident. Most of the debris, police noted, fell on the first floor, resulting in fatalities. Along with the building that collapsed, two adjacent buildings suffered damage. The other injured, Deepa, 56, Govind, 60, Ravi Kashyap, 27, and Jyoti, 27, belong to the same family. Their house, located opposite the collapsed building, suffered significant damage from falling debris. According to sources, the building was an illegal construction on DDA land. Police said they are investigating whether water seepage and poor construction contributed to the building's collapse. "It has been raining for the past two days, and there may have been seepage. However, investigations are still on," police said. A fire official said, "Water may have accumulated on the upper floors, as the impact of the collapse was less on the ground floor." Local residents said the building was a decade old, and this was the first time a house has collapsed in the area. All listed missing persons have been rescued although search operations continue. A blame game started among agencies responsible for monitoring illegal construction in clusters. When questioned, a senior DUSIB official stated that the area was listed among Delhi govt's jhuggi clusters but the land belonged to DDA. "Checking illegal constructions or status of buildings is the responsibility of DDA, since the land belongs to them, or MCD, considering they are responsible for implementing building bylaws. We are responsible only for providing services," said the official. MCD, however, maintained that it had no role to play as the land did not fall in their jurisdiction. They also claimed to have written a letter to DUSIB officials on Saturday, referencing a high court order of Dec 2024. There was no response from DDA.


Time of India
2 hours ago
- Time of India
12 apex predators that birds instantly flee from
When it comes to the sky, birds usually rule the air,but not always. There are powerful hunters out there that send even the boldest flocks into a panic. These aren't just predators; they're apex predators that birds fear the moment they sense a shadow above or a rustle in the trees. From sharp-taloned hawks to stealthy owls and even fast-kicking birds on land, this list of predators that eat birds proves the skies (and ground) aren't as safe as they seem. Let's dive into the 12 most feared apex predators that strike terror in the heart of every bird. List of 12 apex predators that birds fear Peregrine falcon The peregrine falcon is the fastest animal on Earth, reaching diving speeds of up to 240 mph. This aerial assassin snatches birds mid-flight with shocking precision. Its unmatched speed and surprise strikes make birds flee instantly, especially pigeons and ducks. No wonder it tops the list of apex predators that birds fear. Golden eagle Golden eagles soar over open landscapes, searching for birds, hares, and even deer fawns. Known for their crushing talons and dominance in high altitudes, they swoop down fast and hard. Birds that spot this majestic raptor above quickly vanish from the skies. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Flexible MBA by SRM—Apply Now! SRM Online Apply Now Undo It's truly a top predator birds avoid at all costs. Great horned owl With its eerie silence and piercing stare, the great horned owl strikes fear into songbirds and roosting prey. It hunts at night, using its ghost-like flight and powerful grip to ambush birds in their sleep. As one of the most feared nocturnal bird predators, it rules the night sky. Northern goshawk Found in thick woodlands, the northern goshawk dashes between trees to snatch unsuspecting birds. It's fast, focused, and fierce. Jays, crows, and woodpeckers flee the moment they spot its slate-grey wings. This forest ninja is a textbook bird-eating predator that uses agility over brute strength. Red‑tailed hawk Easily spotted soaring above open fields, the red-tailed hawk uses its superb vision to locate prey from high up. It dives with deadly force, catching small birds off-guard. Its adaptability and ambush tactics make it one of the most common predators birds fear across North America. Harpy eagle The harpy eagle is a rainforest powerhouse, with talons the size of a bear's claw. It hunts tree-dwelling mammals and large birds like macaws. Birds in South American jungles take flight the second they sense its presence. As a jungle apex predator, it owns the canopy. Snowy owl With striking white feathers and razor-sharp reflexes, snowy owls dominate the Arctic tundra. They prey on seabirds, rodents, and anything small enough to carry. Birds nesting on the ground scatter when this stealthy, cold-weather avian predator swoops down from above. Bald eagle More than just America's national symbol, the bald eagle is a skilled thief and powerful hunter. It targets fish, ducks, and gulls with ease. Its wide wingspan and stealthy dive bomb tactics send flocks scrambling for safety. A true apex predator of lakes and coasts, birds rarely challenge it. African crowned eagle Often called 'the leopard of the sky,' this African raptor is known for its muscle and grip strength. Found in forests, it hunts monkeys, reptiles and birds. Its sudden strikes leave little time for reaction, making it a bird predator that dominates the jungle. Eurasian eagle-owl Larger than many hawks, this owl hunts under cover of darkness. Its powerful claws and silent wings make it a nightmare for birds that roost low. Just one hoot is enough to send smaller species into hiding. It's easily among the top nocturnal predators birds avoid. Cooper's hawk This hawk thrives in urban and suburban areas, often terrorising backyard bird feeders. With swift, twisting flights through trees, it ambushes small birds in mid-air. Known as the 'bird feeder bandit,' the Cooper's hawk is a city-dwelling predator that turns gardens into hunting grounds. Secretary bird Unusual among raptors, the secretary bird hunts on foot. Native to Africa, it stomps on snakes and small birds with powerful legs. Its surprising agility and precision make it a threat on land. Birds nesting in grasslands flee instantly from this terrestrial predator birds fear. Nature is wild, and even the most graceful songbird has to stay alert. These 12 apex predators that birds flee from prove just how high the stakes are in the animal kingdom. Whether it's the silent wings of an owl or the shadow of an eagle overhead, danger always lurks. Also read| Elon Musk's Tesla Hollywood diner: AI robot, cybertruck meals and other futuristic key features revealed