logo
Tripura Government Directs NHIDCL To Finish National Highway Repairs Before Durga Puja

Tripura Government Directs NHIDCL To Finish National Highway Repairs Before Durga Puja

Hans India6 days ago
The Tripura government has mandated the National Highways and Infrastructure Development Corporation Ltd (NHIDCL) to finalize repairs on the Assam-Agartala National Highway ahead of Durga Puja, the most prominent festival in the state, which begins on September 29. This directive comes after several sections of the highway, notably between Kumarghat and Churaibari in the Unakoti and North districts, suffered significant damage during the monsoon season.
Senior officials, including Public Works Department (PWD) Secretary Kiran Gitte and representatives from state PWD and NHIDCL, recently inspected the affected areas to assess the situation firsthand. Gitte emphasized the urgent need to restore the highway, confirming that NHIDCL has been instructed to finish all pending repair work before the festival to prevent public inconvenience.
Additionally, Chief Minister Manik Saha had earlier reviewed the condition of roads across the state and called for urgent repairs, particularly on national highways under NHIDCL's purview. The state authorities highlighted that roads managed by the state PWD are generally in better condition compared to those executed by NHIDCL through subcontractors.
Efforts are underway to secure the involvement of high-level officials from NHIDCL and the central government in overseeing quality and ensuring long-term solutions, including the construction of resilient RCC roads to withstand heavy rainfall in the future.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Rain triggers multiple landslides, road closure on NH-10
Rain triggers multiple landslides, road closure on NH-10

Time of India

time3 days ago

  • Time of India

Rain triggers multiple landslides, road closure on NH-10

1 2 Darjeeling: Heavy rain over 24 hours triggered multiple landslides along NH-10 on Monday and Tuesday, causing the Teesta river to swell and prompting authorities to temporarily divert traffic towards Kalimpong and Sikkim. No casualties were reported and traffic movement along the Darjeeling–Kalimpong stretch of NH-10 resumed on Tuesday evening. The relentless downpour led to mudslides in Ghante Golai 10th Mile and Tarkhola, while rising water levels of the Teesta disrupted traffic near Teesta Bazar and Ravi Jhora. Over 24 hours, Darjeeling recorded 32.4mm of rain, Siliguri 23mm, Kurseong 16.2mm, and Mirik 15.2mm. The Mahananda river's water level rose to 112.9m, slightly below the danger mark of 115.98m. The Teesta was flowing at 146.5m, just below its danger level of 150m, according to irrigation and waterways department officials. You Can Also Check: Kolkata AQI | Weather in Kolkata | Bank Holidays in Kolkata | Public Holidays in Kolkata A National Highways and Infrastructure Development Corporation Limited (NHIDCL) official confirmed that single-lane traffic was restored in landslide-affected areas. "Muck was cleared at Teesta More and single-lane traffic resumed at Tarkhola. Earthmovers were deployed to aid the ongoing restoration. If there are no further landslides or rainfall, we expect full restoration by Wednesday. As of now, traffic along NH-10 and the Darjeeling–Kalimpong route is operational," said NHIDCL general manager Rahul Kumar Gupta. The temporary diversion on NH-10 caused major inconvenience for travellers to Sikkim and Kalimpong. Manisha M Tamang, a resident of Kalimpong, said: "I arrived from Delhi on a morning flight and only found out about the road closure after landing. There were no vehicles available from Bagdogra, so I had to go all the way to Panitanki More to find a taxi to Kalimpong. The taxi charged me Rs 400 — double the usual fare." Sunil Shankar, who was heading to Sikkim, said he cancelled his trip due to road closure and extra fare.

Smooth ride in sight? Govt revives long-stalled plan to ease travel between Delhi airport terminals
Smooth ride in sight? Govt revives long-stalled plan to ease travel between Delhi airport terminals

Time of India

time4 days ago

  • Time of India

Smooth ride in sight? Govt revives long-stalled plan to ease travel between Delhi airport terminals

Live Events What's the project all about? Why now? (You can now subscribe to our (You can now subscribe to our Economic Times WhatsApp channel Relief may finally be on the horizon for the lakhs of passengers shuttling between Terminal 1 and Terminals 2/3 of Delhi's Indira Gandhi International years of delay, the government reportedly is moving to appoint a consultant for a long-pending infrastructure revamp aimed at easing travel between the airport's far-apart quoted by ToI said that the Delhi government plans to commission a feasibility study and prepare a detailed project report (DPR) for two key interventions: a Y-shaped flyover and a widened tunnel under the runway. Both are expected to ease the bottlenecks plaguing the current commute, especially for transit renewed momentum follows a recent meeting between officials of Delhi International Airport Ltd (DIAL) and Delhi's Public Works Department (PWD) minister Parvesh Verma. Following the meeting, Verma dispatched a team to the site to inspect existing traffic and road conditions.'Minister Verma assured us of action in terms of appointing a consultant for the twin project,' a source was quoted as saying by plan involves a two-pronged strategy:A Y-shaped flyover that would connect the Northern Access Road (which links T1 with the rest of the airport) to two key arterial routes — one heading toward Dwarka and the other toward Dhaula Kuan and Vasant the existing tunnel under the runway — currently a six-lane (three in each direction) underground road that's India's only tunnel of its kind. The idea is to double it by adding a parallel six-lane passage, effectively making it a 12-lane upgrades are considered vital because T1 alone now handles over 4 crore passengers a year, many of whom transfer to or from T3 — nearly 7 kilometres away. With the airport's proposed "air train" project indefinitely delayed, the surface commute remains the only option for bottlenecks at the NSG junction near Terminal 1 and on Indira Gandhi Road — both known for choked traffic — are only expected to worsen unless something is done urgently. A signal-free flyover could be a game changer, helping reduce delays and improving the overall airport said the widening of the tunnel and the flyover are part of a Rs 300-350 crore project, which DIAL has pitched to both the Delhi and central governments. Since the roads in question are under the jurisdiction of PWD, the funding model being explored involves a 20:80 cost split between the Delhi government and the Centre, respectively.'The project is proposed to be funded 20% by the state and 80% by Centre through its urban development fund. The request has been made, and both are seized of the issue,' a source told appointing a consultant is a step forward, actual execution may still take years, depending on bureaucratic approvals, funding clearances, and construction timelines. For now, however, the dust-covered plan is finally seeing some sunlight — and for transit passengers struggling with long, traffic-filled transfers between terminals, that's at least a start.

Govt set to appoint consultant for project to ease T1-T3 travel
Govt set to appoint consultant for project to ease T1-T3 travel

Time of India

time4 days ago

  • Time of India

Govt set to appoint consultant for project to ease T1-T3 travel

New Delhi: Commuting woes between Delhi's Indira Gandhi International (IGI) Airport's terminals 3/2 and T1 are finally on the authorities' radar. Delhi govt plans to appoint a consultant to study the feasibility and prepare a detailed project report for constructing a Y-shaped flyover and widening the tunnel road under the runway, according to sources. Delhi International Airport Ltd (DIAL) officials recently met PWD minister Parvesh Verma, who subsequently sent a team to the site for inspection and set the ball rolling to study and implement the proposal that had been gathering dust for years. "Minister Verma assured us of action in terms of appointing a consultant for the twin project," said a source. You Can Also Check: Delhi AQI | Weather in Delhi | Bank Holidays in Delhi | Public Holidays in Delhi Several years ago, DIAL had proposed doubling India's only tunnel-road-under-a-runway from the current six lanes as part of a comprehensive plan to make commuting between terminals 3/2 and T1 — almost 7km apart — less painful for transit flyers. With T1 handling four crore passengers annually (CPA), the volume of transit traffic has risen exponentially. Moreover, DIAL's proposed air train has also been delayed, with no sign of work on it beginning anytime soon. To handle the volume of transit traffic between T3/2 and T1 till an air train is ready, DIAL had proposed a Y-shaped flyover connecting the Northern Access Road to the road leading to Dwarka on one side and Indira Gandhi Road that leads to Dhaula Kuan and Vasant Vihar on the other. While the proposed flyover would make the commute between T1 and T3 signal-free at the currently choked NSG junction on T1 and Indira Gandhi roads, coping with the increased vehicular movement will require widening the Northern Access Road that links the two terminals. This includes the existing six-lane tunnel road (three lanes for each direction) that is proposed to be doubled by having an additional six-lane underpass section. It is learnt the entire project will cost Rs 300-350 crore. As the road belongs to PWD, DIAL has approached both the Delhi and central govts. "The project is proposed to be funded 20% by the state and 80% by Centre through its urban development fund. The request has been made, and both are seized of the issue," said a source.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store