
JSW Steel's 50 MT plan on track despite Bhushan setback: CEO Jayant Acharya
's aim to boost annual capacity to 50 million tonnes by FY31 will not be impacted by the recent
Supreme Court
ruling for Bhushan Power & Steel Ltd (BPSL) as the former is already pursuing
brownfield expansion
at some sites besides setting up a greenfield plant in Odisha, a senior executive said.
The company has appointed a legal counsel and believes that it has strong grounds to avail all the available legal remedies, said
Jayant Acharya
, chief executive, JSW Steel. He, though, did name the legal counsel.
Earlier this month, the top court struck down the company's acquisition of BPSL, citing various lapses in compliance.
by Taboola
by Taboola
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
Crossout: New Apocalyptic MMO
Crossout
Play Now
Undo
Acharya confirmed ET's report on May 23 that the company has sent demand notices to banks seeking refund of payments it made for the acquisition.
"It is a communication which is basically as per the process, a communication which has to go to the CoC (Committee of Creditors)," Acharya told ET. "We have basically sought time to be able to implement and discuss all the possible legal remedies," he said.
Live Events
While net profit at the country's largest steelmaker fell to a nine-year low in FY25, the company is confident of its cash flows improving this fiscal, helped by several favourable factors, he said.
"We managed to reduce our overall debt and we ended the year with a very strong liquidity cash flow of ₹19,000 crore. So, we have enough capital to be able to do our expansions," Acharya said. "There is no worry about it."
JSW Steel has planned a capital expenditure of ₹20,000 crore for FY26, up from the ₹14,656 crore spent last fiscal.
"Our capacity in India is today at about 34.2 million tonne and will go up by another 2 million tonne in Vijayanagar because of the upgradation and some debottlenecking for half a million," Acharya said. "The phase 3 of Dolvi will add another 5 million tonne, and with some debottlenecking at other plants, we should be able to reach about 42 million tonne by September 2027," he said.
JSW Steel also plans to add 5 million tonne capacity to its JVML plant and 2 million tonne at Salav in Maharashtra. "These two itself add together to cross 50 million tonne," he said. It plans to spend ₹21,000 crore on capital expenditure in the next fiscal, and ₹20,863 crore in fiscal 2028.
JSW Steel generated consolidated earnings before interest, tax, depreciation and amortisation or Ebitda of ₹22,904 crore in FY25 on sales of 26.45 million tonne of steel. It has guided for sales of 29.20 million tonne this fiscal, and sees volume growth underpinning Ebitda improvement.
"Our volumes are growing by 10%, and will give us incremental Ebitda," he said. Price hikes taken from February onwards, lower costs of coking coal, cost-effective operations at JVML (JSW Vijayanagar Metallics Ltd) plant, a higher share of renewable energy coming in, and iron ore mines becoming operational will also aid the Ebitda," he said.
Improvement in steel prices will also aid profitability. "What I can highlight is that the safeguard duty initiative taken by the government to provide a level playing field to the industry has been very positive, so at least the high exports of steel from China and some of the Asian countries will be restricted, and we'll have a better price equation," he said.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Hindustan Times
27 minutes ago
- Hindustan Times
SC to revisit order on JSW's Bhushan deal
The Supreme Court on Thursday recalled its order scrapping JSW Steel's ₹19,700 crore deal in 2021 to acquire Bhushan Power and Steel Limited, noting serious 'error apparent' in the judgment which was decided contrary to settled decisions of the top court. The apex court's Thursday decision also comes as a relief to lenders, including State Bank of India and Punjab National Bank, which filed separate review petitions supporting JSW Steel's position. The May ruling ordered the banks to return ₹ 19,350 crore paid by JSW Steel (HT File) A bench of Chief Justice of India (CJI) Bhushan R Gavai and justice SC Sharma said, 'Prima facie we are of the view that the impugned judgment [of May 2] does not correctly consider the legal position as laid down by this court. Apart from that, it is pointed out [by CoC and JSW] various incorrect factual submissions have been taken on record, and arguments which were not advanced were considered by the court. We find it a fit case for the judgment under review to be recalled and the matter needs to be heard afresh.' The erstwhile promoters of Bhushan Steel disputed this position. The order was passed on a review petition filed by JSW Steel. Posting the matter for further hearing on August 7, the top court agreed to hear all sides, including the erstwhile promoters of Bhushan Steel, on all issues. The May 2 decision — it said he acquisition violated provisions of the Insolvency and Bankruptcy Code (IBC), especially those on timelines — shocked corporate and banking circles; the JSW deal was often cited as a success of IBC, allowing companies that had been run to the ground by their promoters, usually at a great cost to banks that had loaned them money, to be revived under new owners. The apex court's Thursday decision also comes as a relief to lenders, including State Bank of India and Punjab National Bank, which filed separate review petitions supporting JSW Steel's position. The May ruling ordered the banks to return ₹19,350 crore paid by JSW Steel. JSW's acquisition was approved by the committee of creditors (CoC), the national company law tribunal (NCLT) and national company law appellate tribunal (NCLAT). Review petitions are taken up by the court in chambers and only when the court feels satisfied that the case needs to be re-heard, the matter is placed for hearing in open court. On Wednesday, the petition was taken up in chambers and a decision was taken to list it in open court. Appearing for CoC, solicitor general Tushar Mehta, assisted by a team of lawyers from Cyril Amarchand Mangaldas led by advocate Raunak Dhillon, pointed out that the plan of JSW Steel was approved with a 99% majority. He said that the CoC had presented elaborate minutes of meeting before the court showing detailed discussion on the pros and cons of accepting JSW's plan. He referred to earlier decisions by the top court on IBC which lay down the law that the courts will not sit in judgment over the commercial wisdom of CoC. For JSW, senior advocate Neeraj Kishan Kaul, assisted by a team of lawyers from Karanjawala & Co, pointed out that since 2021, the company has been running Bhushan Steel . In the process, it has infused over ₹20,000 crore, cleared all dues incurred by the previous management, and doubled the production of steel. From 18,000 employees, the company's workforce has swelled to 25,000. He added that the judgment of May 2 also has had a debilitating effect on IBC and needs to be set aside. Mehta told the court that the top court 's May ruling on timelines not being observed were not even argued. The May 2 judgment was pronounced by a bench of justices Bela M Trivedi (since retired) and SC Sharma, who is the other member on the bench with CJI hearing the review plea. CJI Gavai said, 'My brother (justice Sharma) has been kind enough to be candid. He has told me that the points argued have not been considered by the judgment. I am grateful to my brother. How could the court go into the issue that was not argued and suggest this is suppressed, that is suppressed.' The erstwhile promoters of Bhushan Steel represented by senior advocate Dhruv Mehta objected to the submissions made by CoC and JSW. But the SG pointed out that the erstwhile promoters of the company, who landed it in serious serious financial trouble cannot be allowed to raise a finger on the correctness of a plan by which the company stands revived. 'They were part of the dirty dozen that left the company in financial doldrums and now want to drag a successful company into liquidation,' he said. Shares of JSW rose 1.93% apiece to close the day at ₹1057.90, on a day when BSE's benchmark Sensex closed 0.36% down.


Time of India
2 hours ago
- Time of India
Scorpio Daily Horoscope Today, August 1, 2025: Let focus shape your success
Your focus today will create lasting impact. The energy around you is sharp and deep, helping you stay committed to what truly matters. Distractions may try to pull you away, but your inner power knows what needs attention. Use this day to finish important tasks or plan for the future. Someone may seek your advice, and you will be able to guide them well. Your ability to stay calm and observe will help you win. Trust that your efforts today will not go waste. Scorpio Love Horoscope Today In love, it is time to focus on emotional connection rather than outer show. If you're in a relationship, give your partner the gift of full attention. One honest conversation can clear up old doubts. If single, a deep conversation with someone close may reveal a hidden connection. Avoid drama or suspicion. Love wants to grow today through truth and calm presence. Show your care through understanding and patience. Emotional security is the most beautiful gift you can offer now. Scorpio Career Horoscope Today Your career gets a strong boost today if you stay focused. Your mind is sharp, and people may come to you for advice. A task that felt delayed can now move forward with new speed. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like New Container Houses Now Available in Anambra - See Prices! Container Homes | Search Ads Search Now Undo Avoid office politics and trust your own abilities. Your dedication and calm planning will impress someone senior. Do not jump into new plans without checking details. Let your actions speak more than words. This is a day to build respect through quiet strength and deep work. Scorpio Money Horoscope Today Finances are stable if you avoid emotional choices. Today is good for planning savings, reviewing bank work or clearing pending bills. If you have a loan, try to pay a small part of it. Avoid arguments over shared money or spending. You may receive useful advice from someone experienced, so listen with an open heart. Do not trust unknown schemes or risky investments. Keep your focus on stability and long-term goals. Your steady approach will bring slow but sure success. Scorpio Health Horoscope Today Health remains steady but avoid mental overpressure. You may be thinking deeply about future plans, which can tire the brain. Eye strain or neck pain may arise due to screen use. Take small breaks, walk a little and breathe deeply. Avoid eating late or skipping meals. You may benefit from calming routines like herbal tea, soft music or a light oil massage. Sleep early if possible. When your body feels safe and calm, your focus becomes stronger and more effective. Discover everything about astrology at Times of India , including daily horoscopes for Aries , Taurus , Gemini , Cancer , Leo , Virgo , Libra , Scorpio , Sagittarius , Capricorn , Aquarius , and Pisces . Read your detailed Horoscope Today and Horoscope Tomorrow here.


Time of India
2 hours ago
- Time of India
Metro Hurdles: Geography, Geology, Goodwill
New Delhi: The construction of Delhi Metro Rail Corporation's new corridor, RK Ashram Marg to Janakpuri West, aimed at easing the city's perpetual traffic woes, is turning out to be a challenge at old Delhi's Sadar Bazar. There are thousands of aged, crumbling buildings crammed into the area, with many of lacking proper foundations. A building in Mithaipul collapsed early on July 11, killing one person, and alarming the shop owners in the market. After the Mithaipul incident, DMRC sealed another building last week which houses almost 200 shops, drawing the ire of traders. Karan Sethi, whose plastic items shop was sealed on July 18, said he didn't know when he could reopen his shop. "My GST documents are locked in the shop. Our customers are going elsewhere. We have no idea how long our business will remain affected," he grumbled. A DMRC official said, "In view of the unavailability of space on the surface, the metro line will go underground in the area." He added that the area between Nabi Karima and Sadar Bazar, where a 2km stretch under construction, was an extremely congested part of old Delhi. "This area is home to thousands of dilapidated buildings which have not been built as per standard building norms. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Is this legal? Access all TV channels without a subscription! Techno Mag Learn More Undo DMRC has also encountered extremely complex geology in this region apart from dilapidated structures above the surface," he said. You Can Also Check: Delhi AQI | Weather in Delhi | Bank Holidays in Delhi | Public Holidays in Delhi Anuj Dayal, principal executive director, corporate communications, DMRC, said the presence of layers of mica schist along with the rock fragments makes the strata complex. "Unlike the rocks, mica schist is extremely weak and brittle in nature," he pointed out. "The water table in the area is also high, which means that during work underground, we frequently encounter water, which obstructs the smooth progress of work. " Dayal maintained that the buildings in the area had no drawings available, and in most cases, multiple floors had been built without proper foundation. "Further, the buildings are mostly non-engineered. Most of these structures also house unauthorised basements which are used as godowns," he claimed. The tunnelling work, along with the construction of the Sadar Bazar station at a depth of 22 metres, will take around a year more to complete. Traders are concerned about the loss to business during this phase. Rakesh Yadav, president, Federation of Sadar Bazar Traders' Association, said, "Following the collapse of the building, DMRC sealed another building with nearly 200 shops, impacting the livelihood of shop owners and employees. Even their documents and goods are stored in the shop." He added that the association had a meeting with DMRC officials on Wednesday and were assured that buildings would be de-sealed after a survey on their safety was conducted on Friday. When DMRC started tunnelling around two years ago, they put up scaffolding outside and inside some shops. "The construction of the rail track has left the ground beneath my shop hollow. We fear that once the scaffolding and other support are removed, our building will be damaged," said hardware shop owner Lalit Chaudhary. He also said he had problems unloading goods because the lane outside his shop had narrowed due to the metro construction. Shop owner Prem Goel claimed that the construction work has worsened waterlogging in the area. Mukesh Saxena similarly complained, "My bill books and other documents were soaked when water entered my shop." The train company, however, said the evacuation of some buildings was purely undertaken as a precautionary measure. "DMRC is in continuous touch with the market association and building occupants. The occupants will be allowed to return as soon as the structures are assessed as safe for occupancy," said Dayal. "DMRC carries out precautionary evacuation of the buildings whenever deemed necessary for a temporary period. Besides, some of the dilapidated structures have been provided scaffolding as an additional measure to avoid any further distress to the existing structures during the metro construction. Exhaustive instrumentation has been done to ensure regular monitoring of the structures." Dayal said the basement built without authorisation, including cantilever extensions to the structures, were already in dangerous condition. Therefore, DMRC was planning to chalk out a strategy in consultation with local associations and nodal govt agencies, taking into account the exigencies at hand, to ensure that the tunnelling work and other construction were completed without causing any damage to personnel and materials. He added that this area had always faced challenges of waterlogging even prior to the commencement of work by DMRC, mainly because of the non-availability of stormwater drains in the area. Commenting on the building that collapsed on July 11, DMRC sources said an investigation found that the structures had foundations of only about 2 metres depth. "There were no piles even though rocky strata along with loose soil lay below. Therefore, it can be concluded that these structures were practically floating on the surface with no foundation support at all. Thousands of cubic metres of concrete have also already been inserted through grouting to make the area safe," an official claimed.