CHICAGO — Coeur Mining, Inc. ('Coeur' or the 'Company') (NYSE: CDE) today reported record second quarter 2025 financial results, including revenue of $481 million and cash flow from operating activities of $207 million. The Company reported record quarterly GAAP net income from continuing operations of $71 million, or $0.11 per share. On an adjusted basis 1, Coeur reported record quarterly EBITDA of $244 million, record cash flow from operating activities before changes in working capital of $162 million and record net income from continuing operations of $127 million, or $0.20 per share.
Article content
Key Highlights
Article content
Strong production and cost performance drove margin expansion – Each ofCoeur's five operations generated strong production increases and delivered positive free cash flow. Quarterly silver production of 4.7 million ounces was 27% higher quarter-over-quarter and 79% higher year-over-year. Gold production increased 25% quarter-over-quarter and 38% year-over-year to 108,487 ounces. Average realized prices for gold and silver increased 15% and 5% respectively, compared to the first quarter while costs applicable to sales per gold and silver ounce 1 declined by approximately 6% quarter-over-quarter
Record quarterly financial results – Fourth consecutive quarter of positive free cash flow, which increased more than eightfold versus the prior quarter to a record $146 million. Adjusted EBITDA 1 increased 64% versus the prior quarter to a record $244 million, bringing the last twelve-month ('LTM') total to $635 million. Fifth consecutive quarter of net income, which totaled a record $71 million, or $0.11 per share
Accelerated debt reduction initiative led to further balance sheet strengthening – The remaining $110 million balance on the revolving credit facility ('RCF') 2 was repaid during the quarter, quarter-end cash and equivalents increased to $112 million, and the net leverage ratio decreased to 0.4x at quarter-end
Stock repurchase program authorized with initial activity in the quarter – On May 27, 2025, Coeur announced a $75 million share repurchase program. During the second quarter, the Company repurchased 216,500 shares at an average price of $9.24 per share
Rochester crushed ore rates continued to increase – The newly-expanded Rochester silver and gold operation in Nevada crushed 6.7 million tons during the quarter, representing an increase of 24% compared to the previous quarter, reflecting steady increases in crushing circuit availability. Rochester silver and gold production increased 50% and 79%, respectively, compared to the second quarter of 2024 and remains on track to deliver on its full-year guidance ranges
Reaffirming full-year production and cost guidance – Coeur remains positioned to deliver guided 2025 production of 380,000 – 440,000 ounces of gold and 16.7 – 20.3 million ounces of silver, which represent year-over-year expected increases of 20% and 62% for gold and silver, respectively 3. The Company also reaffirmed its full-year CAS 1 guidance
Article content
'Coeur's record second quarter reflects strong contributions from all five of our North American gold and silver operations, including the first full quarter from the recently acquired Las Chispas mine,' said Mitchell J. Krebs, Chairman, President and Chief Executive Officer. 'Together with the benefit of higher gold and silver prices, we saw a step change in our financial results in the quarter, including an impressive $146 million of free cash flow, while we eliminated the remaining balance on our RCF 2 and began buying back shares.'
Article content
'Looking ahead to the second half of the year, we expect even higher gold and silver production levels consistent with our re-affirmed 2025 production and cost guidance. We remain uniquely positioned to leverage higher gold and silver prices, which is expected to lead to over $800 million of full-year 2025 adjusted EBITDA and over $400 million of full-year 2025 free cash flow.'
Article content
Financial and Operating Highlights (Unaudited)
Article content
(Amounts in millions, except per share amounts, gold ounces produced & sold, and per-ounce metrics)
2Q 2025
1Q 2025
4Q 2024
3Q 2024
2Q 2024
Gold Sales
$
323.1
$
235.3
$
205.2
$
223.8
$
154.1
Silver Sales
$
157.5
$
124.7
$
100.2
$
89.7
$
67.9
Consolidated Revenue
$
480.7
$
360.1
$
305.4
$
313.5
$
222.0
Costs Applicable to Sales 4
$
229.5
$
204.3
$
158.8
$
156.7
$
144.7
General and Administrative Expenses
$
13.3
$
13.9
$
11.1
$
11.0
$
11.2
Net Income (Loss)
$
70.7
$
33.4
$
37.9
$
48.7
$
1.4
Net Income (Loss) Per Share
$
0.11
$
0.06
$
0.08
$
0.12
$
0.00
Adjusted Net Income (Loss) 1
$
127.4
$
59.9
$
45.3
$
47.2
$
(3.4
)
Adjusted Net Income (Loss) 1 Per Share
$
0.20
$
0.11
$
0.11
$
0.12
$
(0.01
)
Weighted Average Shares Outstanding
643.1
521.2
401.0
400.8
399.9
EBITDA 1
$
203.0
$
105.3
$
104.6
$
121.1
$
49.7
Adjusted EBITDA 1
$
243.5
$
148.9
$
116.4
$
126.0
$
52.4
Cash Flow from Operating Activities
$
207.0
$
67.6
$
63.8
$
111.1
$
15.2
Capital Expenditures
$
60.8
$
50.0
$
47.7
$
42.0
$
51.4
Free Cash Flow 1
$
146.2
$
17.6
$
16.1
$
69.1
$
(36.2
)
Cash, Equivalents & Short-Term Investments
$
111.6
$
77.6
$
55.1
$
76.9
$
74.1
Total Debt 5
$
380.7
$
498.3
$
590.1
$
605.2
$
629.3
Average Realized Price Per Ounce – Gold
$
3,021
$
2,635
$
2,399
$
2,309
$
2,003
Average Realized Price Per Ounce – Silver
$
33.72
$
32.05
$
31.11
$
29.86
$
26.20
Gold Ounces Produced
108,487
86,766
87,149
94,993
78,696
Silver Ounces Produced
4.7
3.7
3.2
3.0
2.6
Gold Ounces Sold
106,948
89,316
85,555
96,913
76,932
Silver Ounces Sold
4.7
3.9
3.2
3.0
2.6
Adjusted CAS per AuOz 1
$
1,260
$
1,330
$
1,192
$
1,113
$
1,264
Adjusted CAS per AgOz 1
$
13.41
$
14.28
$
16.93
$
15.67
$
17.71
Article content
Financial Results
Article content
Second quarter 2025 revenue totaled $481 million compared to $360 million in the prior period and $222 million in the second quarter of 2024. The Company produced 108,487 and 4.7 million ounces of gold and silver, respectively, during the quarter. Metal sales for the quarter totaled 106,948 ounces of gold and 4.7 million ounces of silver. Average realized gold and silver prices for the quarter were $3,021 and $33.72 per ounce, respectively, compared to $2,635 and $32.05 per ounce in the prior period and $2,003 and $26.20 per ounce in the second quarter of 2024.
Article content
Gold and silver sales represented 67% and 33% of quarterly revenue, respectively, compared to 65% and 35% in the prior period. The Company's U.S. operations accounted for approximately 55% of second quarter revenue compared to 57% in the first quarter of 2025, which included 45 days of production from Las Chispas following the closing of the SilverCrest transaction on February 14, 2025.
Article content
Adjusted costs applicable to sales per ounce 1 of gold and silver decreased 5% and 6% quarter-over-quarter, respectively, largely due to higher metal sales. General and administrative expenses decreased $1 million, or 4%, quarter-over-quarter to $13 million, driven by annual incentive payouts paid in the prior period.
Article content
Coeur invested approximately $30 million ($23 million expensed and $7 million capitalized) in exploration during the quarter, compared to approximately $22 million ($20 million expensed and $2 million capitalized) in the prior period. See the 'Operations' and 'Exploration' sections for additional detail on the Company's exploration activities.
Article content
The Company recorded income tax expense of approximately $63 million during the second quarter. Cash income and mining taxes paid during the period totaled approximately $38 million. Fluctuations in foreign exchange rates on deferred tax balances increased income and mining tax expense by $28.3 million and decreased income and mining tax expense by $0.2 million for the three months ended June 30, 2025 and March 31, 2025, respectively. The impact of foreign exchange rates on deferred tax balances is predominantly due to the Mexican Peso and deferred taxes resulting from Las Chispas purchase price accounting.
Article content
Quarterly operating cash flow totaled $207 million compared to $68 million in the prior period, mainly driven by stronger operating performance at each of the Company's five mines, as well as increased metal sales and higher average metals prices. Changes in working capital during the quarter were $45 million.
Article content
Second quarter capital expenditures were $61 million compared to $50 million in the prior period. Sustaining and development capital expenditures accounted for approximately $48 million and $13 million, or 79% and 21%, respectively, of Coeur's total capital investment during the quarter.
Article content
Las Chispas, Mexico
Article content
(Dollars in millions, except per ounce amounts)
2Q 2025
1Q 2025
4Q 2024
3Q 2024
2Q 2024
Tons milled
118,399
59,368
—
—
—
Average gold grade (oz/t)
0.150
0.130
—
—
—
Average silver grade (oz/t)
13.32
12.71
—
—
—
Average recovery rate – Au
93.8
%
94.8
%
—
%
—
%
—
%
Average recovery rate – Ag
94.4
%
94.6
%
—
%
—
%
—
%
Gold ounces produced
16,271
7,175
—
—
—
Silver ounces produced (000's)
1,489
714
—
—
—
Gold ounces sold
16,025
9,607
—
—
—
Silver ounces sold (000's)
1,479
924
—
—
—
Average realized price per gold ounce
$
3,315
$
2,902
$
—
$
—
$
—
Average realized price per silver ounce
$
33.48
$
32.63
$
—
$
—
$
—
Metal sales
$
102.7
$
58.0
$
—
$
—
$
—
Costs applicable to sales 4
$
57.7
$
42.8
$
—
$
—
$
—
Adjusted CAS per AuOz 1
$
894
$
744
$
—
$
—
$
—
Adjusted CAS per AgOz 1
$
8.94
$
8.38
$
—
$
—
$
—
Exploration expense
$
3.3
$
1.9
$
—
$
—
$
—
Cash flow from operating activities
$
58.6
$
97.1
$
—
$
—
$
—
Sustaining capital expenditures (excludes capital lease payments)
$
9.2
$
5.3
$
—
$
—
$
—
Development capital expenditures
$
—
$
—
$
—
$
—
$
—
Total capital expenditures
$
9.2
$
5.3
$
—
$
—
$
—
Free cash flow 1
$
49.4
$
91.8
$
—
$
—
$
—
Article content
Operational
Article content
Second quarter gold and silver production totaled 16,271 ounces and 1,488,672 ounces, respectively, compared to 7,175 gold ounces and 714,239 silver ounces in the prior period, which included 45 days of production following the closing of the SilverCrest transaction on February 14, 2025
Production during the quarter benefited from higher average gold and silver grades
Article content
Financial
Article content
Adjusted CAS 1 for gold and silver on a co-product basis totaled $894 for gold and $8.94 for silver
Gold and silver accounted for approximately 48% and 52%, respectively, of revenue during the quarter
Free cash flow 1 in the second quarter totaled $49 million compared to $91.8 million in the prior period, which included the sale of held bullion and finished goods totaling $72 million
Article content
Exploration
Article content
Exploration investment in the second quarter totaled approximately $3 million (substantially all expensed) compared to $2 million (substantially all expensed) in the prior period
Up to eight rigs were active during the quarter: five on surface and three underground. The primary focus was on the Babicanora and Las Chispas Blocks as well as the Gap Zone located between these two blocks
On the Las Chispas Block and in the Gap Zone, the Augusta, William Tell Mini, North Las Chispas and La Sopresa veins delivered very favorable results and continued to expand. Notably, the high-grade Augusta discovery made earlier this year has now been traced over 320 meters along strike and 150 meters down dip, consistently yielding multi-kilo grade intercepts on a silver equivalent basis. In addition, the North Las Chispas Vein returned intercepts of significantly higher grade than previously encountered. These strong results support the potential for expansion of these resource zones and contribution towards year-end reserve and resource calculations
In the Babicanora Block, infill drilling has been delivering excellent results, providing enhanced potential for upgrade of inferred resources
In the third quarter, drilling is expected to continue on all veins detailed above and scout drilling is expected to commence on a number of targets across the district
Article content
Guidance
Article content
Prorated production reflecting 10.5 months is expected to be 42,500 – 52,500 ounces of gold and 4.25 – 5.25 million ounces of silver
Prorated adjusted CAS 1 reflecting 10.5 months are expected to be $850 – $950 per gold ounce and $9.25 – $10.25 per silver ounce
Prorated capital expenditures reflecting 10.5 months are expected to be $30 – $34 million, consisting primarily of sustaining capital
Prorated exploration investment reflecting 10.5 months is expected to be $16 – $18 million (substantially all expensed)
Article content
Palmarejo, Mexico
Article content
(Dollars in millions, except per ounce amounts)
2Q 2025
1Q 2025
4Q 2024
3Q 2024
2Q 2024
Tons milled
483,880
440,920
419,008
413,463
429,561
Average gold grade (oz/t)
0.060
0.050
0.059
0.070
0.066
Average silver grade (oz/t)
4.06
4.36
4.17
5.15
4.49
Average recovery rate – Au
92.9
%
95.2
%
91.2
%
94.8
%
89.9
%
Average recovery rate – Ag
88.6
%
87.4
%
88.3
%
85.6
%
82.8
%
Gold ounces produced
27,272
23,032
22,490
27,549
25,467
Silver ounces produced (000's)
1,741
1,680
1,543
1,823
1,596
Gold ounces sold
26,782
22,713
22,353
28,655
24,313
Silver ounces sold (000's)
1,720
1,636
1,598
1,861
1,542
Average realized price per gold ounce
$
2,093
$
1,924
$
1,750
$
1,922
$
1,744
Average realized price per silver ounce
$
33.76
$
31.85
$
31.27
$
29.71
$
26.48
Metal sales
$
114.1
$
95.8
$
89.1
$
110.4
$
83.2
Costs applicable to sales 4
$
48.7
$
43.7
$
45.5
$
47.5
$
48.2
Adjusted CAS per AuOz 1
$
888
$
882
$
894
$
818
$
1,006
Adjusted CAS per AgOz 1
$
14.39
$
14.37
$
15.92
$
12.60
$
15.24
Exploration expense
$
4.0
$
3.9
$
3.8
$
4.3
$
2.6
Cash flow from operating activities
$
47.9
$
8.7
$
33.2
$
55.6
$
23.7
Sustaining capital expenditures (excludes capital lease payments)
$
3.6
$
2.5
$
6.5
$
4.0
$
3.1
Development capital expenditures
$
2.0
$
3.4
$
3.4
$
4.0
$
2.8
Total capital expenditures
$
5.6
$
5.9
$
9.9
$
8.0
$
5.9
Free cash flow 1
$
42.3
$
2.8
$
23.3
$
47.6
$
17.8
Article content
Operational
Article content
Second quarter gold and silver production totaled 27,272 and 1.7 million ounces, respectively, compared to 23,032 and 1.7 million ounces in the prior period and 25,467 and 1.6 million ounces in the second quarter of 2024
Production during the quarter benefited from higher average silver recoveries, higher average gold grade and higher tons milled, driven in part by greater contributions from Hidalgo development ore following the completion of the Hidalgo portal last year
Article content
Financial
Article content
Adjusted CAS 1 for gold and silver on a co-product basis decreased slightly quarter-over-quarter to $888 and $14.39 per ounce, respectively, driven by higher metal sales
Capital expenditures totaled $6 million, which were flat compared to the prior period
Free cash flow 1 in the second quarter increased to $42 million compared to $3 million in the prior period, driven by lower tax payments this quarter
Article content
Exploration
Article content
Exploration investment remained consistent quarter-over-quarter at approximately $4 million (substantially all expensed)
The exploration program ramped up to eight rigs across the property during the second quarter
Key areas of drilling activity included expansion of the mine trend to the northwest and the southeast. The northwestern portion of the mine trend, called the Hidalgo Corridor, includes the Hidalgo, Libertad and San Juan zones. Expansion drilling to the southeast of the mine trend involves validation drilling of the Independencia Sur block that was acquired from Fresnillo in 2024 and includes the Independencia Sur vein and other vein targets. Scout drilling also continued at Camuchin
On the Hidalgo Corridor, drilling continues to deliver excellent results, outlining an additional 350 meters of strike length year to date. Drilling is extending the trend back towards the area that includes the original open pit, processing plant and the high-grade La Prieta system. Since its discovery in 2019, Hidalgo has become Palmarejo's second largest reserve after Guadalupe and is expected to expand further. Three rigs are expected to remain active in the Hidalgo Corridor through year-end
At the Independencia Sur block, validation drilling is focused on the southeastern extension of mine corridor veins into this block, immediately adjacent to existing infrastructure and outside the area of interest of the Franco-Nevada gold stream agreement. Multiple veins, including Bruno and Independencia Sur, as well as potential new zones, have been intersected. As many as five rigs are expected to remain active in the Independencia Sur block through year-end
At Camuchin, scout drilling has confirmed multiple veins spanning several kilometers. Ongoing geological work is aimed at refining targets, with highly encouraging results to date
A follow-up program to the 2024 pilot high-resolution geophysical survey commenced during the quarter. This effort has significantly improved subsurface targeting and is driving faster, more cost-effective drilling campaigns
Validation drilling also commenced on the Guazapares trend over the San Miguel deposit following the successful amendment to an agreement with the Guazapares Ejido in the first quarter
Article content
Other
Article content
Full-year 2025 production is expected to be 95,000 – 105,000 ounces of gold and 5.4 – 6.5 million ounces of silver
Adjusted CAS 1 in 2025 are expected to be $950 – $1,150 per gold ounce and $17.00 – $18.00 per silver ounce
Capital expenditures are expected to be $26 – $32 million, consisting primarily of sustaining capital and underground development
Exploration investment in 2025 is expected to be $16 – $18 million (substantially all expensed)
Article content
Rochester, Nevada
Article content
(Dollars in millions, except per ounce amounts)
2Q 2025
1Q 2025
4Q 2024
3Q 2024
2Q 2024
Ore tons placed
7,851,665
6,987,324
8,226,820
7,064,623
5,102,800
Average silver grade (oz/t)
0.60
0.59
0.44
0.57
0.59
Average gold grade (oz/t)
0.003
0.003
0.003
0.002
0.002
Silver ounces produced (000's)
1,456
1,284
1,551
1,155
973
Gold ounces produced
14,302
13,353
15,752
9,690
8,006
Silver ounces sold (000's)
1,438
1,282
1,571
1,098
985
Gold ounces sold
13,881
14,713
14,824
9,186
8,150
Average realized price per silver ounce
$
33.88
$
31.86
$
30.97
$
30.13
$
25.78
Average realized price per gold ounce
$
3,333
$
2,840
$
2,604
$
2,492
$
2,131
Metal sales
$
95.0
$
82.6
$
87.2
$
56.0
$
42.8
Costs applicable to sales 4
$
47.9
$
48.5
$
51.5
$
39.4
$
36.7
Adjusted CAS per AgOz 1
$
16.83
$
18.41
$
17.96
$
20.88
$
21.58
Adjusted CAS per AuOz 1
$
1,675
$
1,670
$
1,495
$
1,735
$
1,813
Prepayment, working capital cash flow
$
—
$
(17.5
)
$
—
$
—
$
—
Exploration expense
$
1.2
$
1.5
$
2.7
$
1.0
$
1.0
Cash flow from operating activities
$
39.6
$
(7.0
)
$
26.0
$
3.2
$
(5.9
)
Sustaining capital expenditures (excludes capital lease payments)
$
20.7
$
8.5
$
10.4
$
7.0
$
9.9
Development capital expenditures
$
3.8
$
6.4
$
3.5
$
3.1
$
17.6
Total capital expenditures
$
24.5
$
14.9
$
13.9
$
10.1
$
27.5
Free cash flow 1
$
15.1
$
(21.9
)
$
12.1
$
(6.9
)
$
(33.4
)
Article content
Operational
Article content
Silver and gold production in the second quarter increased to 1.5 million and 14,302 ounces, respectively, compared to 1.3 million and 13,353 ounces in the prior period and 1.0 million and 8,006 ounces in the second quarter of 2024
Ore tons placed during the quarter totaled 7.9 million tons, consisting of approximately 6.7 million tons through the crushing circuit, up from 5.5 million tons in the prior quarter. Additionally, the Company placed approximately 1.1 million tons of direct to pad (DTP) material, down from 1.5 million tons of DTP material placed in the prior quarter
Work progressed on the campaign to remove eight million tons from the legacy Stage I and Stage II leach pads to facilitate exploration drilling and future planned mining activities. Approximately 4.8 million tons have been removed year-to-date, with project completion expected in the third quarter of 2025
Article content
Financial
Article content
Second quarter adjusted CAS 1 for silver and gold on a co-product basis totaled $16.83 and $1,675 per ounce, respectively, mainly driven by higher metal sales
Capital expenditures increased on a quarter-over-quarter basis to $25 million compared to $15 million in the prior period, driven mainly by capitalized stripping to offload material from the legacy Stage I and II leach pads
Free cash flow 1 in the second quarter totaled $15 million compared to $(22) million in the prior period
Article content
Exploration
Article content
Exploration investment in the second quarter totaled approximately $4 million ($1 million expensed and $3 million capitalized) compared to roughly $2 million ($2 million expensed and $1 million capitalized) in the prior quarter
Up to two rigs were active during the quarter. Target areas included East Rochester, Lincoln Hill and the expected highly prospective corridor between Nevada Packard and Rochester
A small diamond core drill program completed at East Rochester during the quarter successfully delineated the edges of the Wedge target and areas of colluvium in advance of a larger-scale drill campaign expected to begin in the fourth quarter of 2025, following the partial removal of legacy Stage I and Stage II leach pads
A validation and expansion program at Lincoln Hill commenced during the quarter and is expected to continue through the third quarter of 2025
Ongoing geological modeling at Nevada Packard and Rochester is extending interpretations into the connecting corridor. Strong geophysical responses and historic workings support the presence of high-grade structures continuing between the pits. As a result, an initial scout drill program commenced during the quarter, with two holes already completed in the corridor
Article content
Guidance
Article content
Full-year 2025 production is expected to be 7.0 – 8.3 million ounces of silver and 60,000 – 75,000 ounces of gold
Adjusted CAS 1 for 2025 are expected to be $14.50 – $16.50 per silver ounce and $1,250 – $1,450 per gold ounce
Capital expenditures are expected to be $57 – $70 million, which reflects an eight-million-ton stripping campaign for the removal of Stage I and II legacy leach pads to access ore zones in the eastern portion of the open pit, modifications after startup of the crusher corridor and final negotiated payment with a key contractor of the expansion construction
Exploration investment in 2025 is expected to be $13 – $16 million ($11 – $12 million expensed and $2 – $4 million capitalized)
Article content
Kensington, Alaska
Article content
(Dollars in millions, except per ounce amounts)
2Q 2025
1Q 2025
4Q 2024
3Q 2024
2Q 2024
Tons milled
192,169
185,344
183,639
165,916
182,043
Average gold grade (oz/t)
0.15
0.13
0.16
0.16
0.14
Average recovery rate
91.8
%
93.3
%
91.8
%
90.4
%
92.3
%
Gold ounces produced
26,555
22,715
26,931
24,104
23,202
Gold ounces sold
26,751
22,205
25,839
24,800
23,539
Average realized price per gold ounce, gross
$
3,410
$
2,990
$
2,702
$
2,563
$
2,223
Treatment and refining charges per gold ounce
$
56
$
53
$
53
$
56
$
52
Average realized price per gold ounce, net
$
3,354
$
2,937
$
2,649
$
2,507
$
2,171
Metal sales
$
89.8
$
65.2
$
68.3
$
62.2
$
51.1
Costs applicable to sales 4
$
46.1
$
42.2
$
39.7
$
38.1
$
40.7
Adjusted CAS per AuOz 1
$
1,713
$
1,882
$
1,529
$
1,539
$
1,734
Prepayment, working capital cash flow
$
—
$
(12.1
)
$
(12.9
)
$
11.8
$
(11.8
)
Exploration expense
$
1.5
$
3.3
$
0.7
$
2.0
$
1.3
Cash flow from operating activities
$
36.0
$
5.9
$
8.5
$
38.1
$
(7.2
)
Sustaining capital expenditures (excludes capital lease payments)
$
12.3
$
15.2
$
18.9
$
20.0
$
16.5
Development capital expenditures
$
4.0
$
0.3
$
—
$
—
$
—
Total capital expenditures
$
16.3
$
15.5
$
18.9
$
20.0
$
16.5
Free cash flow 1
$
19.7
$
(9.6
)
$
(10.4
)
$
18.1
$
(23.7
)
Article content
Operational
Article content
Gold production in the second quarter increased to 26,555 ounces compared to 22,715 ounces in the prior period and 23,202 ounces in the second quarter of 2024
Stronger production during the quarter was driven by higher tons milled and higher average gold grade offset by lower recoveries
Article content
Financial
Article content
Second quarter adjusted CAS 1 decreased to $1,713 per ounce compared to $1,882 per ounce in the prior period, due primarily to increased metal sales
Capital expenditures increased 5% quarter-over-quarter to $16 million. The second quarter marked the end of the multi-year underground mine development program at Kensington
Free cash flow 1 in the second quarter increased to $20 million, reflecting increased metals sales
Article content
Exploration
Article content
Exploration investment in the second quarter totaled approximately $5 million ($2 million expensed and $3 million capitalized), compared to $5 million ($3 million expensed and $2 million capitalized) in the prior period
Drilling at Kensington is progressing exceptionally well, with drill footage targets achieved ahead of schedule and under budget during the quarter. Drill targets include Elmira, Upper and Lower Kensington and Johnson
At Elmira and Elmira South, second quarter drilling was focused primarily on infill work. Notably, the newly-discovered Elmira Hanging Wall Zone first identified in 2024 returned several high-grade intercepts and is expected to be included in the year-end 2025 resource estimates for the first time
In Upper Kensington, both expansion and infill drilling at Zones 30 and 30B continue to return high-grade intercepts. Additionally, expansion drilling in Zone 10 (Lower Kensington) is extending the mineralization up-dip into Upper Kensington
Following very strong results from initial test drilling at the Johnson target in 2024, an increased budget of $1.6 million was approved during the quarter. Drilling is ongoing, and this area is also expected to contribute to year-end reserve and resource estimates
Due to excellent progress across the Kensington programs this year, the number of active drill rigs will be reduced in the second half. During the summer, one rig is expected to be dedicated to scout drilling on a new target called Ivanhoe and Hope, located approximately 1.2 miles northwest of the Kensington mine workings
Article content
Guidance
Article content
Full-year 2025 production is expected to be 92,500 – 107,500 gold ounces
Adjusted CAS 1 in 2025 are expected to be $1,700 – $1,900 per gold ounce
Capital expenditures are expected to be $55 – $64 million, which reflects the completion of the multi-year development and exploration program in the first half of the year as well as an $18 – $22 million investment to raise the main tailings storage facility embankment as part of the expansion of the existing facility, which is expected to be executed over the next two years
Exploration investment in 2025 is expected to be $11 – $14 million ($6 – $8 million expensed and $5 – $6 million capitalized)
Article content
Wharf, South Dakota
Article content
(Dollars in millions, except per ounce amounts)
2Q 2025
1Q 2025
4Q 2024
3Q2024
2Q 2024
Ore tons placed
1,105,605
1,033,699
1,164,894
1,424,649
1,162,437
Average gold grade (oz/t)
0.035
0.020
0.023
0.046
0.032
Gold ounces produced
24,087
20,491
21,976
33,650
22,021
Silver ounces produced (000's)
36
51
54
42
69
Gold ounces sold
23,509
20,078
22,539
34,272
20,930
Silver ounces sold (000's)
35
50
54
45
65
Average realized price per gold ounce
$
3,315
$
2,827
$
2,620
$
2,440
$
2,064
Metal sales
$
79.1
$
58.4
$
60.7
$
85.0
$
45.0
Costs applicable to sales 4
$
29.0
$
27.0
$
22.1
$
31.8
$
19.1
Adjusted CAS per AuOz 1
$
1,175
$
1,260
$
902
$
885
$
822
Prepayment, working capital cash flow
$
—
$
(12.5
)
$
—
$
—
$
—
Exploration expense
$
3.5
$
2.6
$
2.7
$
2.3
$
1.1
Cash flow from operating activities
$
41.4
$
15.7
$
22.2
$
51.6
$
17.0
Sustaining capital expenditures (excludes capital lease payments)
$
2.3
$
6.4
$
2.9
$
2.8
$
1.2
Development capital expenditures
$
1.3
$
1.0
$
—
$
—
$
—
Total capital expenditures
$
3.6
$
7.4
$
2.9
$
2.8
$
1.2
Free cash flow 1
$
37.8
$
8.3
$
19.3
$
48.8
$
15.8
Article content
Operational
Article content
Gold production in the second quarter increased 18% quarter-over-quarter to 24,087 ounces, driven by higher gold grades
Article content
Financial
Article content
Adjusted CAS 1 on a by-product basis decreased 7% quarter-over-quarter to $1,175 per ounce, due primarily to higher gold sales
Capital expenditures totaled approximately $4 million compared to $7 million in the prior period
Free cash flow 1 in the second quarter increased to $38 million compared to $8 million in the prior period
Article content
Exploration
Article content
Exploration investment during the second quarter totaled $4 million (substantially all expensed), compared to $3 million (substantially all expensed) in the prior quarter
Expansion and infill drilling programs at Wedge and North Foley were completed during the quarter. All remaining 2025 drilling is expected to focus on infill work at Juno
Results from both Wedge and North Foley met expectations, and these zones are expected to contribute meaningfully to year-end reserve and resource estimates
Exploration priorities in the third quarter include infill drilling at Juno, following up on 2024 expansion drilling, which extended mineralization approximately 500 feet to the northwest
Article content
Guidance
Article content
Full-year 2025 production is expected to be 90,000 – 100,000 gold ounces and 50,000 – 200,000 ounces of silver
Adjusted CAS 1 in 2025 are expected to be $1,250 – $1,350 per gold ounce
Capital expenditures are expected to be $13 – $17 million, which reflects increased infill drilling expected to materially extend the mine life as well as other investments which are expected to be required to convert the Juno and North Foley deposits into reserves
Exploration investment in 2025 is expected to be $7 – $10 million (substantially all expensed)
Article content
Exploration
Article content
The Company's exploration investment in 2025 is expected to total $67 – $77 million for expansion drilling (classified as exploration expense) and $10 – $16 million for infill drilling (capitalized exploration) for a total expected investment of $77 – $93 million.
Article content
Top exploration priorities for 2025 are: (1) continuing to build the inferred pipeline at Palmarejo to provide optionality to the operation, including to the East of existing operations, where 60% of this year's exploration investment is budgeted; (2) outlining higher-grade structures to enhance the near-term margin and longer-term free cash flow profile of Rochester; (3) maintaining a 5-year reserve-based mine life at Kensington while finding higher-grade zones to bolster cash flow; (4) completing the expansion and infill programs at Wharf to add to the life of mine; (5) building on the new geological model and understanding at Silvertip to grow the resource base, and; (6) rapidly building detailed knowledge of Las Chispas and maintaining mine life.
Article content
During the second quarter, Coeur invested approximately $30 million ($23 million expensed and $7 million capitalized), compared to roughly $22 million ($20 million expensed and $2 million capitalized) in the prior period.
Article content
At Silvertip, exploration investment totaled approximately $9 million in the second quarter, compared to $6 million in the prior period. Following completion of the geological model in the first quarter of 2025, exploration drilling commenced in May. During the second quarter, drilling at Silvertip focused on three targets; Southern Silver, Discovery, and Saddle Zones, using one underground rig and three surface rigs. Alongside drilling, final preparations and planning were completed for the summer surface exploration program, which includes geological mapping, rock chip sampling, and stream and soil geochemical surveys.
Article content
2025 Guidance
Article content
The Company has reaffirmed its 2025 production and costs applicable to sales guidance ranges as shown below. Regarding 2025 capital guidance (which excludes capital leases), the Company has elected to fund $10 million of sustaining capital with cash versus previously planned capital leases due to the overall improved financial position of the Company. Due to the Company's strong share price performance in 2025, the Company has increased its 2025 G&A expense guidance to reflect the non-cash increase in incentive compensation related to expected performance share expense.
The exploration expense guidance below excludes $17 – $22 million of underground mine development and support costs associated with Silvertip.
Article content
Note that Las Chispas guidance reflects results from the February 14, 2025 closing of the acquisition. Additionally, Las Chispas cost guidance excludes the effects of the SilverCrest purchase price allocation.
Article content
2025 Adjusted Costs Applicable to Sales Guidance
Article content
2025 Capital, Exploration and G&A Guidance
Article content
Note: The Company's guidance figures assume estimated prices of $2,700/oz gold and $30.00/oz silver as well as CAD of 1.425 and MXN of 20.50. Guidance figures exclude the impact of any metal sales or foreign exchange hedges.
Article content
Financial Results and Conference Call
Article content
Coeur will host a conference call to discuss its second quarter 2025 financial results on August 7, 2025 at 11:00 a.m. Eastern Time.
Article content
Hosting the call will be Mitchell J. Krebs, Chairman, President and Chief Executive Officer of Coeur, who will be joined by Thomas S. Whelan, Senior Vice President and Chief Financial Officer, Michael 'Mick' Routledge, Senior Vice President and Chief Operating Officer, Aoife McGrath, Senior Vice President, Exploration, and other members of management. A replay of the call will be available through August 14, 2025.
Article content
About Coeur
Article content
Coeur Mining, Inc. is a U.S.-based, well-diversified, growing precious metals producer with five wholly-owned operations: the Las Chispas silver-gold mine in Sonora, Mexico, the Palmarejo gold-silver complex in Chihuahua, Mexico, the Rochester silver-gold mine in Nevada, the Kensington gold mine in Alaska and the Wharf gold mine in South Dakota. In addition, the Company wholly-owns the Silvertip polymetallic critical minerals exploration project in British Columbia.
Article content
Cautionary Statements
Article content
This news release contains forward-looking statements within the meaning of securities legislation in the United States and Canada, including statements regarding cash flow, production growth, costs, capital expenditures, exploration and development efforts and plans and potential impacts on reserves and resources, mine lives and expected extensions, the gold stream agreement at Palmarejo, anticipated production, and costs and expenses and operations at Las Chispas, Palmarejo, Rochester, Kensington and Wharf. Such forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause Coeur's actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others, the risk that anticipated production, cost and expense levels are not attained, the risks and hazards inherent in the mining business (including risks inherent in developing and expanding large-scale mining projects, environmental hazards, industrial accidents, weather or geologically-related conditions), changes in the market prices of gold and silver and a sustained lower price or higher treatment and refining charge environment, the uncertainties inherent in Coeur's production, exploration and development activities, including risks relating to permitting and regulatory delays (including the impact of government shutdowns) and mining law changes, ground conditions, grade and recovery variability, any future labor disputes or work stoppages (involving the Company and its subsidiaries or third parties), the risk of adverse outcomes in litigation, the uncertainties inherent in the estimation of mineral reserves and resources, impacts from Coeur's future acquisition of new mining properties or businesses, risks associated with the continued integration of the recent acquisition of SilverCrest, the risk that the Rochester expansion does not sustain planned performance, the loss of access or insolvency of any third-party refiner or smelter to whom Coeur markets its production, materials and equipment availability, inflationary pressures, impacts from tariffs or other trade barriers, continued access to financing sources, the effects of environmental and other governmental regulations and government shut-downs, the risks inherent in the ownership or operation of or investment in mining properties or businesses in foreign countries, Coeur's ability to raise additional financing necessary to conduct its business, make payments or refinance its debt, as well as other uncertainties and risk factors set out in filings made from time to time with the United States Securities and Exchange Commission, and the Canadian securities regulators, including, without limitation, Coeur's most recent reports on Form 10-K and Form 10-Q. Actual results, developments and timetables could vary significantly from the estimates presented. Readers are cautioned not to put undue reliance on forward-looking statements. Coeur disclaims any intent or obligation to update publicly such forward-looking statements, whether as a result of new information, future events or otherwise. Additionally, Coeur undertakes no obligation to comment on analyses, expectations or statements made by third parties in respect of Coeur, its financial or operating results or its securities. This does not constitute an offer of any securities for sale.
Article content
The scientific and technical information concerning our mineral projects in this news release have been reviewed and approved by a 'qualified person' under Item 1300 of SEC Regulation S-K, namely our Vice President, Technical Services, Christopher Pascoe. For a description of the key assumptions, parameters and methods used to estimate mineral reserves and mineral resources, as well as data verification procedures and a general discussion of the extent to which the estimates may be affected by any known environmental, permitting, legal, title, taxation, sociopolitical, marketing or other relevant factors, please review the Technical Report Summaries for each of the Company's material properties which are available at www.sec.gov.
Article content
Non-U.S. GAAP Measures
Article content
We supplement the reporting of our financial information determined under United States generally accepted accounting principles (U.S. GAAP) with certain non-U.S. GAAP financial measures, including EBITDA, adjusted EBITDA, adjusted EBITDA margin, free cash flow, adjusted net income (loss), operating cash flow before changes in working capital and adjusted costs applicable to sales per ounce. We believe that these adjusted measures provide meaningful information to assist management, investors and analysts in understanding our financial results and assessing our prospects for future performance. We believe these adjusted financial measures are important indicators of our recurring operations because they exclude items that may not be indicative of, or are unrelated to our core operating results, and provide a better baseline for analyzing trends in our underlying businesses. We believe EBITDA, adjusted EBITDA, adjusted EBITDA margin, free cash flow, adjusted net income (loss) and adjusted costs applicable to sales per ounce are important measures in assessing the Company's overall financial performance. For additional explanation regarding our use of non-U.S. GAAP financial measures, please refer to our Form 10-K for the year ended December 31, 2024.
Article content
EBITDA, adjusted EBITDA, adjusted EBITDA margin, free cash flow, adjusted net income (loss), operating cash flow before changes in working capital and adjusted costs applicable to sales per ounce (gold and silver) are non-GAAP measures. Please see tables in the Appendix for the reconciliation to U.S. GAAP. Free cash flow is defined as cash flow from operating activities less capital expenditures. Liquidity is defined as cash and cash equivalents plus availability under the Company's RCF. Future borrowing under the RCF may be subject to certain financial covenants. Please see tables in Appendix for the calculation of consolidated free cash flow and liquidity.
As of June 30, 2025, Coeur had no outstanding borrowings and $20.2 million in outstanding letters of credit under its RCF. Future borrowing under the RCF may be subject to certain financial covenants.
Percentage based on the midpoint of 2025 guidance ranges.
Excludes amortization.
Includes capital leases. Net of debt issuance costs and premium received.
Article content
COEUR MINING, INC. AND SUBSIDIARIES
June 30, 2025
December 31, 2024
ASSETS
In thousands, except share data
CURRENT ASSETS
Cash and cash equivalents
$
111,646
$
55,087
Receivables
60,640
29,930
Inventory
201,679
78,617
Ore on leach pads
129,469
92,724
Prepaid expenses and other
22,875
16,741
526,309
273,099
NON-CURRENT ASSETS
Property, plant and equipment and mining properties, net
2,794,687
1,817,616
Goodwill
613,355
—
Ore on leach pads
102,078
106,670
Restricted assets
9,381
8,512
Receivables
14,447
19,583
Other
90,693
76,267
TOTAL ASSETS
$
4,150,950
$
2,301,747
LIABILITIES AND STOCKHOLDERS' EQUITY
CURRENT LIABILITIES
Accounts payable
$
141,511
$
125,877
Accrued liabilities and other
139,145
156,609
Debt
29,889
31,380
Reclamation
17,129
16,954
327,674
330,820
Debt
350,833
558,678
Reclamation
257,903
243,538
Deferred tax liabilities
326,223
7,258
Other long-term liabilities
59,930
38,201
994,889
847,675
COMMITMENTS AND CONTINGENCIES
STOCKHOLDERS' EQUITY
Common stock, par value $0.01 per share; authorized 900,000,000 shares, 642,701,753 issued and outstanding at June 30, 2025 and 399,235,632 at December 31, 2024
6,426
3,992
Additional paid-in capital
5,780,143
4,181,521
2,828,387
1,123,252
Article content
Three Months Ended June 30,
Six Months Ended June 30,
In thousands, except share data
Revenue
$
480,650
$
222,026
$
840,712
$
435,086
COSTS AND EXPENSES
Costs applicable to sales (1)
229,454
144,717
433,720
290,714
Amortization
61,421
27,928
104,514
55,225
General and administrative
13,250
11,241
27,162
25,645
Exploration
23,256
12,874
42,938
23,365
Pre-development, reclamation, and other
13,161
8,590
30,114
26,818
Total costs and expenses
340,542
205,350
638,448
421,767
Income or loss from operations
140,108
16,676
202,264
13,319
OTHER INCOME (EXPENSE), NET
Gain (loss) on debt extinguishment
—
(21
)
—
417
Fair value adjustments, net
4
—
(342
)
—
Interest expense, net of capitalized interest
(8,251
)
(13,162
)
(18,701
)
(26,109
)
Other, net
1,460
5,122
1,866
7,895
Total other income (expense), net
(6,787
)
(8,061
)
(17,177
)
(17,797
)
Income (loss) before income and mining taxes
133,321
8,615
185,087
(4,478
)
Income and mining tax (expense) benefit
(62,595
)
(7,189
)
(81,008
)
(23,213
)
NET INCOME (LOSS)
$
70,726
$
1,426
$
104,079
$
(27,691
)
OTHER COMPREHENSIVE INCOME (LOSS):
Change in fair value of derivative contracts designated as cash flow hedges
—
(10,881
)
—
(18,507
)
Reclassification adjustments for realized (gain) loss on cash flow hedges
—
17,028
—
17,176
Other comprehensive income (loss)
—
6,147
—
(1,331
)
COMPREHENSIVE INCOME (LOSS)
$
70,726
$
7,573
$
104,079
$
(29,022
)
NET INCOME (LOSS) PER SHARE
Basic income (loss) per share:
(1) Excludes amortization.
Article content
Three Months Ended June 30,
Six Months Ended June 30,
2025
2024
2025
2024
In thousands
CASH FLOWS FROM OPERATING ACTIVITIES:
Net income (loss)
$
70,726
$
1,426
$
104,079
$
(27,691
)
Adjustments:
Amortization
61,421
27,928
104,514
55,225
Accretion
4,900
4,154
9,632
8,230
Deferred taxes
(12,204
)
(9,217
)
(29,557
)
(4,788
)
Gain on debt extinguishment
—
21
—
(417
)
Fair value adjustments, net
(4
)
—
342
—
Stock-based compensation
4,217
2,732
7,515
6,980
Write-downs
—
—
—
3,235
Deferred revenue recognition
(192
)
(118
)
(42,508
)
(55,277
)
Acquired inventory purchase price allocation
29,680
—
56,720
—
Other
3,029
556
4,552
11,378
Changes in operating assets and liabilities:
Receivables
(4,766
)
3,180
(821
)
(2,136
)
Prepaid expenses and other current assets
2,424
4,176
84,489
3,537
Inventory and ore on leach pads
(14,125
)
(19,774
)
(22,473
)
(39,468
)
Accounts payable and accrued liabilities
61,845
185
(1,898
)
40,570
CASH PROVIDED BY (USED IN) OPERATING ACTIVITIES
206,951
15,249
274,586
(622
)
CASH FLOWS FROM INVESTING ACTIVITIES:
Capital expenditures
(60,807
)
(51,405
)
(110,809
)
(93,488
)
Acquisitions, net
239
—
103,635
—
Proceeds from the sale of assets
80
—
80
24
Other
(85
)
(148
)
(175
)
(215
)
CASH USED IN INVESTING ACTIVITIES
(60,573
)
(51,553
)
(7,269
)
(93,679
)
CASH FLOWS FROM FINANCING ACTIVITIES:
Issuance of common stock
9,147
—
9,449
22,823
Issuance of notes and bank borrowings, net of issuance costs
47,000
115,000
146,500
250,000
Payments on debt, finance leases, and associated costs
(164,731
)
(71,653
)
(356,965
)
(163,878
)
Share repurchases
(2,004
)
—
(2,004
)
—
Other financing activities
(2,184
)
(31
)
(7,905
)
(1,810
)
CASH PROVIDED BY (USED IN) FINANCING ACTIVITIES
(112,772
)
43,316
(210,925
)
107,135
Effect of exchange rate changes on cash and cash equivalents
496
(361
)
204
(321
)
INCREASE (DECREASE) IN CASH, CASH EQUIVALENTS AND RESTRICTED CASH
34,102
6,651
56,596
12,513
Cash, cash equivalents and restricted cash at beginning of period
79,368
69,240
56,874
63,378
Cash, cash equivalents and restricted cash at end of period
$
113,470
$
75,891
$
113,470
$
75,891
Article content
Adjusted EBITDA Reconciliation
(Dollars in thousands except per share amounts)
LTM 2Q
2025
2Q 2025
1Q 2025
4Q 2024
3Q 2024
2Q 2024
Net income (loss)
$
190,670
$
70,726
$
33,353
$
37,852
$
48,739
$
1,426
Interest expense, net of capitalized interest
43,868
8,251
10,450
11,887
13,280
13,162
Income tax provision (benefit)
125,245
62,595
18,413
18,420
25,817
7,189
Amortization
174,263
61,421
43,093
36,533
33,216
27,928
EBITDA
534,046
202,993
105,309
104,692
121,052
49,705
Fair value adjustments, net
342
(4
)
346
—
—
—
Foreign exchange (gain) loss
(2,517
)
(246
)
758
(1,321
)
(1,708
)
(2,089
)
Asset retirement obligation accretion
18,180
4,900
4,732
4,315
4,233
4,154
Inventory adjustments and write-downs
6,309
1,598
1,928
1,552
1,231
1,071
(Gain) loss on sale of assets
377
117
186
(102
)
176
640
RMC bankruptcy distribution
(132
)
(37
)
—
(95
)
—
(1,199
)
(Gain) loss on debt extinguishment
—
—
—
—
—
21
Transaction costs
20,227
2,823
8,887
7,541
976
—
Kensington royalty settlement
(67
)
28
(95
)
—
—
419
Mexico arbitration matter
3,629
1,740
410
152
1,327
1,138
Flow-through share premium
(2,313
)
(112
)
(585
)
(369
)
(1,247
)
(1,456
)
COVID-19
1
—
—
—
1
3
Acquired inventory purchase price
56,721
29,681
27,040
—
—
—
Adjusted EBITDA
$
634,803
$
243,481
$
148,916
$
116,365
$
126,041
$
52,407
Adjusted EBITDA Margin
43
%
51
%
41
%
38
%
40
%
24
%
Article content
Adjusted Net Income (Loss) Reconciliation
(Dollars in thousands except per share amounts)
2Q 2025
1Q 2025
4Q 2024
3Q 2024
2Q 2024
Net income (loss)
$
70,726
$
33,353
$
37,852
$
48,739
$
1,426
Fair value adjustments, net
(4
)
346
—
—
—
Foreign exchange loss (gain) (1)
28,072
574
265
(2,247
)
(2,950
)
(Gain) loss on sale of assets
117
186
(102
)
176
640
RMC bankruptcy distribution
(37
)
—
(95
)
—
(1,199
)
(Gain) loss on debt extinguishment
—
—
—
—
21
Transaction costs
2,823
8,887
7,541
976
—
Kensington royalty settlement
28
(95
)
—
—
419
Mexico arbitration matter
1,740
410
152
1,327
1,138
Flow-through share premium
(112
)
(585
)
(369
)
(1,247
)
(1,456
)
COVID-19
—
—
—
1
3
Acquired inventory purchase price
29,681
27,040
—
—
—
Tax effect of adjustments
(5,633
)
(10,230
)
142
(568
)
(1,447
)
Adjusted net income (loss)
$
127,401
$
59,886
$
45,386
$
47,157
$
(3,405
)
Adjusted net income (loss) per share – Basic
$
0.20
$
0.12
$
0.12
$
0.12
$
(0.01
)
Adjusted net income (loss) per share – Diluted
$
0.20
$
0.11
$
0.11
$
0.12
$
(0.01
)
Article content
(1) Includes the impact of foreign exchange rates on deferred tax balances of $28.3 million, $(0.2) million, $1.6 million, $(0.5) million and $(0.9) million for the three months ended June 30 and March 31, 2025 and December 31, September 30 and June 30, 2024, respectively.
Article content
Reconciliation of Costs Applicable to Sales
for Three Months Ended June 30, 2025
In thousands (except metal sales, per ounce or per pound amounts)
Las Chispas
Palmarejo
Rochester
Kensington
Wharf
Silvertip
Total
Costs applicable to sales, including amortization (U.S. GAAP)
$
80,122
$
58,109
$
64,676
$
56,304
$
30,542
$
928
$
290,681
Amortization
(22,375
)
(9,406
)
(16,748
)
(10,221
)
(1,549
)
(928
)
(61,227
)
Costs applicable to sales
$
57,747
$
48,703
$
47,928
$
46,083
$
28,993
$
—
$
229,454
Inventory Adjustments
(523
)
(147
)
(489
)
(222
)
(191
)
—
(1,572
)
Acquired inventory purchase price allocation
(29,681
)
—
—
—
—
—
(29,681
)
By-product credit
—
—
—
(41
)
(1,188
)
—
(1,229
)
Adjusted costs applicable to sales
$
27,543
$
48,556
$
47,439
$
45,820
$
27,614
$
—
$
196,972
Metal Sales
Gold ounces
16,025
26,782
13,881
26,751
23,509
—
106,948
Silver ounces
1,479,410
1,720,383
1,437,811
—
34,916
—
4,672,520
Zinc pounds
—
—
Lead pounds
—
—
Revenue Split
Gold
52
%
49
%
49
%
100
%
100
%
Silver
48
%
51
%
51
%
—
%
Zinc
—
%
Lead
—
%
Adjusted costs applicable to sales
Gold ($/oz)
$
894
$
888
$
1,675
$
1,713
$
1,175
$
1,260
Silver ($/oz)
$
8.94
$
14.39
$
16.83
$
—
$
13.41
Zinc ($/lb)
$
—
$
—
Lead ($/lb)
$
—
$
—
Article content
Article content
This Post contains more content. For the full press release please view source version on Businesswire.com:
https://www.businesswire.com/news/home/20250806132770/en/
Article content
Article content
Article content
Contacts
Article content
For Additional Information
Article content
Article content
Coeur Mining, Inc.
Article content
Article content
200 S. Wacker Drive, Suite 2100
Article content
Article content
Chicago, IL 60606
Article content
Article content
Attention: Jeff Wilhoit, Senior Director, Investor Relations
Article content
Article content
Phone: (312) 489-5800
Article content
Article content
www.coeur.com
Article content
Article content
Article content
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Globe and Mail
7 minutes ago
- Globe and Mail
Corebridge Financial Announces Pricing of Secondary Offering of Common Stock by AIG
Corebridge Financial, Inc. (NYSE: CRBG) today announced that the previously announced secondary offering by American International Group, Inc. (NYSE: AIG) of common stock of Corebridge Financial has priced at $33.65 per share. The offering is expected to close on August 8, 2025, subject to customary closing conditions. AIG, as the selling stockholder, has offered 30 million existing shares of common stock (out of approximately 538 million total shares of common stock outstanding) of Corebridge Financial, corresponding to approximately $1.0 billion of gross proceeds. AIG has also granted a 30-day option to the underwriter to purchase up to an additional 4.5 million shares. All of the net proceeds from the offering will go to AIG. Morgan Stanley & Co. LLC is acting as the underwriter for the offering. The offering of common stock is being made only by means of a prospectus and an accompanying prospectus supplement. Copies of the prospectus and accompanying prospectus supplement relating to the offering may be obtained from: Morgan Stanley & Co. LLC via mail at 180 Varick Street, 2nd Floor, New York, NY 10014. A registration statement relating to these securities was filed with the U.S. Securities and Exchange Commission ('SEC') on November 6, 2023, and became effective automatically. The registration statement may be obtained free of charge at the SEC's website at (EDGAR/Company Filings) under 'Corebridge Financial, Inc.' This press release does not constitute an offer to sell or the solicitation of an offer to buy these securities, and shall not constitute an offer, solicitation or sale in any state or jurisdiction in which such offer, solicitation or sale would be unlawful prior to registration or qualification under the securities laws of that state or jurisdiction. Any offers, solicitations or offers to buy, or any sales of securities will be made in accordance with the registration requirements of the Securities Act of 1933, as amended. About Corebridge Financial Corebridge Financial, Inc. makes it possible for more people to take action in their financial lives. With more than $415 billion in assets under management and administration as of June 30, 2025, Corebridge Financial is one of the largest providers of retirement solutions and insurance products in the United States. We proudly partner with financial professionals and institutions to help individuals plan, save for and achieve secure financial futures.


CTV News
7 minutes ago
- CTV News
NDP raises concerns after U.S. company buys Sask. grain elevator, rail assets
The Saskatchewan NDP is raising its concerns about a U.S. company buying a Western Canadian agricultural firm. (Damian Smith/CTV News) The Saskatchewan NDP is criticizing the province for not intervening after a U.S. based company purchased an agricultural logistics business that operates in east Saskatchewan. Ceres Global Ag Corp is an agriculture, energy, and industrial product supply chain company which operates 13 locations across North America – including in Saskatchewan and Manitoba. Two of the locations include a grain elevator near Melfort and a logistics hub in southeast Saskatchewan. Ceres Global Ag has now been bought out by Bartlett – a U.S. ag firm based in Kansas City – leaving the two locations in Saskatchewan under American ownership. 'This is a time when we should be doing everything we can, especially with strategic economic infrastructures, power, rail, energy assets,' expressed NDP MLA Aleana Young. 'We should be ensuring Canadian ownership, if not Saskatchewan ownership, not continually allowing big multinational corporations or American corporations to come in and scoop up Saskatchewan assets.' With the deal closing in July, Barlett said in a news release acquiring Ceres will 'expand its operational footprint and grain merchandising capabilities' which will add approximately $45 million of total grain and oilseed storage capacity. 'This acquisition represents another step forward in our strategy to strengthen our agriculture business and broaden the value we deliver to customers across North America,' President and CEO of Bartlett's parent company Jeff Roberts said in a news release on July 2. 'The Ceres team and its leadership have an outstanding track record, and we're looking forward to building on that within the Savage portfolio.' In a statement to CTV News, the Government of Saskatchewan said its aware of the purchase and is watching the deal closely to support producers. 'We will continue to monitor the situation to help ensure producers have access to competitive and local options to sell their grains. During the first six months of 2025, the volume of Saskatchewan agri-food exports to the U.S. increased by almost 6.5 per cent,' the statement read. 'It is reckless for the NDP to suggest that we should be blocking and opposing investment in Saskatchewan that provides jobs and significant tax revenue to the residents of Saskatchewan,' the province added.


Globe and Mail
7 minutes ago
- Globe and Mail
Choice Properties Real Estate Investment Trust Announces Issuance of $350 million of Series W Senior Unsecured Debentures and $150 million of Series X Senior Unsecured Debentures, and Redemption of $200 million of Series F Senior Unsecured Debentures
Choice Properties Real Estate Investment Trust ('Choice Properties', the 'Trust' or 'we') (TSX: announced today that it has agreed to issue, on a private placement basis in certain provinces of Canada (the 'Offering'), (i) $350 million aggregate principal amount of series W senior unsecured debentures of the Trust that will bear interest at a rate of 4.628% per annum and will mature on August 8, 2035 (the 'Series W Debentures') and (ii) $150 million aggregate principal amount of series X senior unsecured debentures of the Trust that will bear interest at a rate of 5.369% per annum and will mature on August 8, 2055 (the 'Series X Debentures' and, together with the Series W Debentures, the 'Debentures'). Offering of Debentures The Debentures will be sold at par and are being offered on an agency basis by a syndicate of agents co-led by TD Securities, CIBC Capital Markets, RBC Capital Markets, BMO Capital Markets, and Scotiabank. Subject to customary closing conditions, the Offering is expected to close on August 8, 2025. The Trust intends to use the net proceeds of the Offering to repay existing indebtedness, including the redemption in full of the Trust's $200 million aggregate principal amount of 4.055% series F senior unsecured debentures due November 24, 2025 (the 'Series F Debentures') on September 5, 2025, and for general business purposes. It is a condition of closing of the Offering that the Debentures be rated at least 'BBB' (high) with a 'positive' trend by Morningstar DBRS and at least 'BBB+' by Standard and Poor's Ratings Services. The Debentures will rank equally with all other unsecured indebtedness of the Trust that has not been subordinated. The Debentures being offered have not been registered under the U.S. Securities Act of 1933, as amended, and may not be offered or sold in the United States absent registration or an applicable exemption from the registration requirements. This press release shall not constitute an offer to sell or the solicitation of an offer to buy nor shall there be any sale of the Debentures in any jurisdiction in which such offer, solicitation or sale would be unlawful. Redemption of Series F Debentures The Trust announced today that it has provided holders of its Series F Debentures a notice of redemption pursuant to which the Trust will redeem the entire outstanding principal amount of the Series F Debentures on September 5, 2025 and has fixed September 4, 2025 as the record date for this redemption. As of the date hereof, there is $200 million aggregate principal amount of the Series F Debentures outstanding. On the redemption date, the Series F Debentures will be redeemed in accordance with their terms at a redemption price per $1,000 principal amount of the Series F Debentures equal to $1,000 plus accrued and unpaid interest to but excluding the redemption date of $11.554, and will thereafter cease to be outstanding. About Choice Properties Real Estate Investment Trust Choice Properties is a leading Real Estate Investment Trust that creates enduring value through places where people thrive. We are more than a national owner, operator and developer of high-quality commercial and residential real estate. We believe in creating spaces that enhance how our tenants and communities come together to live, work, and connect. This includes our industry leadership in integrating environmental, social and economic sustainability practices into all aspects of our business. In everything we do, we are guided by a shared set of values grounded in Care, Ownership, Respect and Excellence. For more information, visit Choice Properties' website at and Choice Properties' issuer profile at Forward-Looking Statements This press release may contain forward-looking information within the meaning of applicable securities legislation, which reflects Choice Properties' current expectations regarding future events, including the expected closing of the Offering, the intended use of proceeds of the Offering and the redemption of the Series F Debentures. Forward-looking information is based on a number of assumptions and is subject to a number of risks and uncertainties, many of which are beyond Choice Properties' control that could cause actual results and events to differ materially from those that are disclosed in or implied by such forward-looking information. Such risks and uncertainties include, but are not limited to, the factors discussed in Choice Properties' 2025 Second Quarter Report and current Annual Information Form. Choice Properties does not undertake any obligation to update such forward-looking information, whether as a result of new information, future events or otherwise, except as expressly required by applicable law. All forward-looking statements contained in this press release are made as of the date hereof and are qualified by these cautionary statements.