
Taxi union appeals to CM to address drivers' woes
Nagpur: The
Vidarbha App-Based Taxi Union
(VABTU), representing thousands of
taxi drivers
in Nagpur, submitted a strong appeal to
CM Devendra Fadnavis
during his Janata Darbar held at Hyderabad House on Saturday. The union expressed deep frustration over the govt's failure to address their pressing concerns despite multiple petitions and personal representations.
In a letter addressed to the CM, VABTU president Deepak Sane lamented that their earlier submission on April 20, 2025, along with numerous follow-ups, went unanswered. "If the administration cannot respond to genuine grievances, what is the purpose of Janata Darbar?" he questioned.
The union criticised the govt for prioritising its own interests and issuing government resolutions (GRs) without resolving core issues faced by taxi drivers, many of whom invested heavily in their vehicles through loans.
They also condemned the recent approval to bike taxis, stating it does not address the livelihood concerns of traditional taxi drivers.
Further, VABTU demanded that cab aggregators like Ola, Uber, and Rapido be directed to comply with state regulations on taxi fares and ensure driver safety as per govt guidelines. Sane urged the CM to either take immediate corrective action or allow him to set own taxi ablaze outside the CM's residence as a form of protest.
The union's appeal highlights the growing unrest among taxi drivers struggling to sustain their livelihood amid competition from app-based bike taxis and the lack of govt support. Autorickshaw drivers too condemned the state govt for allowing app-based bike taxis, stating if started they would die of starvation.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


News18
43 minutes ago
- News18
After Samruddhi Highway, Maharashtra CM Aims For Shaktipeeth Expressway To Link 12 Pilgrimage Sites
Last Updated: CM Devendra Fadnavis is now looking to complete the Shaktipeeth Expressway, an 805-kilometre, six-lane greenfield corridor that will span from Wardha in Vidarbha to Banda in Konkan With the final stretch of the Mumbai-Nagpur Samruddhi Mahamarg inaugurated, Maharashtra is now preparing for another infrastructure project — the Shaktipeeth Expressway. Chief Minister Devendra Fadnavis has announced that the state will focus on completion of the expressway, which will connect key religious and economic regions of the state, significantly boosting the long-neglected Marathwada region. CM Fadnavis has turned his focus toward the Shaktipeeth Expressway, an 805-kilometre, six-lane greenfield corridor that will span from Wardha in Vidarbha to Banda in Konkan. The proposed route will traverse 12 districts: Wardha, Yavatmal, Hingoli, Nanded, Parbhani, Beed, Latur, Dharashiv, Solapur, Sangli, Kolhapur, and Sindhudurg. This expressway aims to connect three major Shaktipeeths—Kolhapur's Mahalakshmi temple, Tuljapur's Tulja Bhavani temple, and Mahur's Renuka Devi temple—as well as other important religious destinations, including Parli Vaijnath, Aundha Nagnath, Pandharpur, Akkalkot, Ganagapur, and Karanja Lad. In total, 12 major pilgrimage and cultural sites will be connected. The project is estimated to cost Rs 86,000 crore and will include 48 major bridges, 30 tunnels, eight railway crossings, and 26 interchanges. It is envisioned as both a spiritual and industrial corridor, intended to reshape Marathwada's economy and improve connectivity across south-central Maharashtra. The Shaktipeeth Expressway, like the Samruddhi corridor, is planned with sustainability and industrial growth in mind. Gas pipelines are being laid alongside the road, enabling gas supply to industries situated along the route. Smart infrastructure features, including solar energy usage and roadside logistics hubs, are also planned. CM Fadnavis emphasised that the expressway is not merely a road project but a vision to economically integrate regions left out of the state's growth narrative. The Marathwada region, in particular, is expected to benefit through enhanced industrialisation and tourism. He reaffirmed that, just as the Samruddhi Highway was completed despite doubts and opposition, the Shaktipeeth Expressway will also be delivered with the same resolve. A truly historic and emotional moment – the dream of a 'Samruddha' Maharashtra has come true!'Hinduhrudaysamrat Balasaheb Thackeray Maharashtra Samruddhi Mahamarg' is now complete —it's not just a road, but a strong step towards a brighter was only possible because… — Devendra Fadnavis (@Dev_Fadnavis) June 6, 2025 MUMBAI-NAGPUR SAMRUDDHI MAHAMARG The final leg of the Samruddhi Expressway, from Igatpuri to Amne, was inaugurated recently, marking the completion of the 701-km super expressway that connects Nagpur to Mumbai. This now allows uninterrupted travel between these two major cities in just eight hours. The project, lauded for its record-speed execution, incorporates 73 bridges, eco-sensitive underpasses and overpasses for wildlife, five twin tunnels, and 22 facility centres along the route. It also includes India's largest highway tunnel system equipped with automatic cooling mechanisms and provisions for 200 MW of solar power generation. The expressway, positioned as Maharashtra's economic corridor, now connects 24 districts directly to JNPT (Jawaharlal Nehru Port Trust), enhancing logistics, industrial connectivity, and interstate trade. First Published: June 06, 2025, 11:44 IST


India Today
2 hours ago
- India Today
Devendra Fadnavis inaugurates final stretch of Mumbai-Nagpur Samruddhi highway
The remaining 76-kilometre stretch of the Hindu Hriday Samrat Balasaheb Thackeray Maharashtra Samruddhi Mahamarg, from Igatpuri to Amane, was innaugarated by Maharashtra Chief Minister Devendra Fadnavis on Thursday, June 5. This milestone marks the completion of a transformative infrastructure project that spans 701 kilometres, connecting 24 districts across Vidarbha, Marathwada and North journey began with the inauguration of the first 520-kilometer segment from Nagpur to Shirdi by Prime Minister Narendra Modi on December 11, 2022. This was followed by the opening of the second phase, an 80-kilometer stretch from Shirdi (Kokanmathan) in Ahmednagar district to Bharvir Dhantore in Nashik district, by Chief Minister Eknath Shinde on May 26, 2023. The third phase, covering 25 kilometers from Bharvir Dhantore to Hutatma Point, was launched by Public Works Minister Dada Bhuse on May 4, A standout feature of the final 76-kilometre section, which cuts through the rugged Sahyadri mountain range across Nashik and Thane districts, is the inclusion of five double tunnels totalling 10.73 kilometres (21.46 kilometres with both carriageways). The tunnel at Panke (Igatpuri), stretching 8 kilometres, stands as Maharashtra's longest and widest at 17.61 meters, with a height of 9.12 meters. This final leg will enable the Igatpuri to Kasara stretch to be traversed in just eight minutes. This offers a vital alternative to the congested Kasara ghat on National Highway 3, promising smoother traffic completion of this stretch will revolutionise travel, cutting the journey from Thane (Amane) to Nagpur to approximately eight hours. It will also enhance accessibility for commuters from Thane and Mumbai to Shirdi as well as benefit farmers in Shirdi, Ahmednagar, and the Sinnar and Igatpuri areas of Nashik by expediting the transport of agricultural goods to the Mumbai Metropolitan 392 villages across 26 talukas in 10 revenue divisions, the six-lane highway directly links Nagpur, Wardha, Amravati, Washim, Buldhana, Jalna, Chhatrapati Sambhajinagar, Ahmednagar, Nashik, and Thane, while indirectly connecting 14 other districts. With speed limits set at 100 kilometres per hour on inclines and 120 kilometres per hour on flat terrain, the route slashes the traditional 17-18-hour Nagpur-to-Mumbai journey to just eight hours via the new Greenfield it will link Jawaharlal Nehru Port Trust (JNPT) in Mumbai to Mihan in Nagpur, facilitating rapid goods transportation across India and beyond.


Hindustan Times
3 hours ago
- Hindustan Times
903 irrigation projects junked, most in western Maharashtra
MUMBAI: The BJP-led Mahayuti government has scrapped 903 minor irrigation projects in the state, a move likely to become a political flashpoint with opposition parties ahead of local body elections later this year. Chief minister Devendra Fadnavis on Thursday cancelled approvals for micro and small irrigation projects worth ₹19,721 crore as none of them had taken off. Approved between 2020 and 2023, some of them had been sanctioned by the previous Maha Vikas Aghadi (MVA) government, even as 1,000 more minor irrigation projects with an allocation of ₹1,000 crore are likely to be struck off the list. Most of these projects are in Western Maharashtra and Vidarbha, largely in constituencies held by leaders from opposition parties. Almost half of them, 416 projects, are in Ahilynagar (previously Ahmednagar) district. These were approved by the previous MVA government. The project cost of each ranges between ₹2.25 crore and ₹58 crore. They consist of watershed development schemes, percolation tanks, reservoirs or storage tanks and Kolhapur-type weirs. 'The projects could not take off for reasons such as failure to acquire land, opposition by villagers and contractors' failure to begin the work. This has led to a swollen list of incomplete projects. They also constitute budgetary funds that are unutilised. Due to this, the department cannot allocate funds for new projects. Pruning the list of projects under utilisation has been undertaken on the directives of the CM,' said the government resolution issued by the soil and water conservation department. According to officials from the department, some of these projects were technically flawed. In some cases, approval had been given without conducting a feasibility and technical survey of the sites, while in other cases they had been allotted to ineligible contractors. Social activist and Aam Aadmi Party (AAP) leader Vijay Kumbhar has raised some concerns. 'While it's okay to scrap projects that failed to take off, the government should take action against the people responsible for this failure. The government should also make sure that villages meant to benefit from these projects are assigned substitute projects so that farmers are not deprived of irrigation,' he said.