
Can Swiggy ride the sentiment wave after Eternal's blowout quarter?
shares saw renewed interest after
Eternal
, the parent of
Zomato
and Blinkit, posted strong operational metrics in Q1FY26, despite a sharp drop in profit. With investors bullish on the quick commerce theme, attention is now turning to Swiggy ahead of its results.
Sector sentiment lifts Swiggy
Eternal's Q1 report showed a 70% year-on-year jump in revenue, driven by strong performances in Blinkit and food delivery. Notably, quick commerce Net Order Value (NOV) surpassed food delivery for the first time in a full quarter, reflecting a significant shift in consumer demand.
Explore courses from Top Institutes in
Please select course:
Select a Course Category
Project Management
Design Thinking
Public Policy
MCA
Management
MBA
Others
Healthcare
Data Analytics
Artificial Intelligence
Operations Management
Technology
Degree
Data Science
Cybersecurity
Data Science
others
Product Management
Finance
healthcare
PGDM
Leadership
CXO
Digital Marketing
Skills you'll gain:
Portfolio Management
Project Planning & Risk Analysis
Strategic Project/Portfolio Selection
Adaptive & Agile Project Management
Duration:
6 Months
IIT Delhi
Certificate Programme in Project Management
Starts on
May 30, 2024
Get Details
This growth sparked optimism among investors, with brokerages like Jefferies upgrading Eternal to a Buy, calling Blinkit's momentum 'underestimated.' The upbeat sentiment quickly spilled over to Swiggy, which also operates in the high-growth quick commerce space.
Swiggy up 21% in 3 months, but still below peak
Swiggy stock, currently trading at Rs 417, has gained 21% over the last three months. However, it remains 32% below its 52-week high of Rs 617 and is down 23% year-to-date. Analysts believe this recent upward momentum could continue if technical indicators hold.
Technical setup supports a bullish outlook
According to Kunal V Parar, VP – Technical Research & Algo at Choice Broking, the stock has formed a Cup and Handle pattern and is trading above both its 50-day and 100-day moving averages.
'A bullish crossover and RSI above 70 indicate strong momentum. A breakout above the neckline could push the stock towards Rs 453 and potentially Rs 525,' said Parar.
Drumil Vithlani, Technical Analyst at Bonanza, added that Swiggy has been forming higher highs and higher lows since June, suggesting a continued positive undertone.
'As long as the stock holds above Rs 400, we expect a gradual move towards Rs 440 in the near term,' Vithlani noted.
Q1 results could be the next catalyst
Swiggy is yet to announce its Q1FY26 results, but given Eternal's strong revenue growth and sector-wide momentum, investors may position early in anticipation of similar trends.
If Swiggy's numbers confirm rising traction in food delivery and quick commerce, analysts believe the stock could reclaim higher levels last seen earlier this year.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


India.com
19 minutes ago
- India.com
Patna Metro will not start from 15th August? New date is..., Full list of metro stations include...
Patna metro- File image Patna metro update: In a matter of good news for residents of Bihar, the first metro project of Bihar, the Patna Metro is now likely to be launched on August 23. Originally planned to be inaugurated on August 15, the operation of the Patna metro will begin only after mandatory safety checks are completed. Here are all the details you need to know about the Patna metro and which stations are expected to be operational in the first phase. As per media reports, Urban Development Minister Jiwesh Mishra confirmed that the preparations were initially aimed at the Independence Day launch, but August 23 is now being considered as an alternative. In the first phase of the metro, five stations are expected to be implemented: Patna metro: Which 5 Metro stations will be opened? New Patliputra Bus Terminal Zero Mile Bhootnath Khemnichak Malahi Pakadi However, readers should also note that during the initial phase, the metro will run only between New Patliputra Bus Terminal, Zero Mile and Bhootnath. Nitish Kumar asks officials to complete Metro project within deadline Patna Bihar Chief Minister Nitish Kumar recently conducted an on-site inspection of the Patna Metro Rail Project, reviewing progress at key stations including Malahi Pakadi and Bhootnath Metro Station. The Chief Minister issued necessary directions to officials and emphasised the timely completion of the project. Details on Patna Metro Project Using a site map, Singh informed the Chief Minister about the facilities planned at Malahi Pakadi Metro Station, including escalators, ticket counters, passenger amenities, public and paid areas, lifts, and access paths to the platform. He added that a total 6.20 km stretch—covering Malahi Pakadi, Khemnichak, Bhootnath Road, Zero Mile, and Pataliputra Bus Terminal—is being given top priority for early completion. What's the total investment on Patna Metro Rail Project? The Bihar government has allocated Rs 115.10 crore for the execution of this section, with a target to operationalise it by August 15, 2025. (With inputs from agencies)


India Today
19 minutes ago
- India Today
Indian Navy gets firepower boost with Brahmos fitted guided-missile frigate
In a big boost to the Indian Navy's firepower, the Garden Reach Shipbuilders and Engineers (GRSE) Ltd delivered 'Himgiri', the first of three Advanced Guided-Missile Frigates being built under the Indian Navy's Project 17A, on Thursday. The ship marks the 801st vessel and the 112th warship built and delivered by the GRSE to the Indian Navy. The 149-metre-long ship, with a displacement of 6,670 tonnes, is one of the largest and most technologically advanced warships constructed by GRSE in its 65-year journey as a Defence Public Sector total project is being undertaken at a whopping cost of Rs 21,833.36 crore and will significantly benefit India's Micro, Small and Medium Enterprises (MSMEs), start-ups and Original Equipment Manufacturers (OEMs). The Himgiri is armed with BrahMos supersonic cruise missiles for anti-ship and land-attack roles, as well as Barak 8 surface-to-air missiles for aerial frigate is powered by a combined diesel and gas turbine propulsion system and features an Active Electronically Scanned Array (AESA) radar, advanced combat systems, and full-spectrum warfare capabilities—spanning anti-air, anti-surface, and anti-submarine operations. The ship also focusses on crew comfort and operational flexibility, accommodating 225 personnel and aviation support for helicopter operations and stands as a key symbol of the 'Atmanirbhar Bharat Abhiyan' by the Indian government. Currently, GRSE is working on 15 warships across four classes for the Indian Navy. Of these, Androth (the second Anti-Submarine Warfare Shallow Water Craft) and Ikshak (the third Survey Vessel Large) have completed sea trials and are preparing for delivery. The remaining 13 vessels are in various stages of construction. - EndsMust Watch


Indian Express
19 minutes ago
- Indian Express
Karnataka launches Rs 1,000 crore Quantum Mission, to set up Q-city near Bengaluru
The Karnataka government Thursday unveiled a Rs 1,000-crore Quantum Mission with a vision to transform the state into a $20 billion quantum economy by 2035 and establish it as the 'quantum capital of Asia'. As part of this mission, it announced the establishment of Q-City (Quantum City) near Bengaluru – a futuristic integrated hub for quantum technology innovation, manufacturing, research, and talent development. The announcement was made during the inauguration of the Quantum India Summit 2025 held in Bengaluru, co-organised by the Department of Science & Technology (DST) and the Indian Institute of Science (IISc). Chief Minister Siddaramaiah and Minister for Science & Technology N S Boseraju laid out the government's roadmap to foster quantum innovation and infrastructure across the state. 'By 2035, we aim to create 10,000 high-skilled jobs and establish Karnataka as the quantum capital of Asia,' Chief Minister Siddaramaiah said. He added that a Quantum Technology Task Force will be constituted to guide policy frameworks, while the government will also launch a Quantum Venture Capital Fund to back more than 100 startups and generate at least 100 patents in the sector. The overall initiative is expected to create over 2 lakh direct jobs. Minister Boseraju said, 'As part of this effort, our government will establish Q-City where world-class facilities will be provided. This city will integrate academic institutions, innovation centres, manufacturing clusters for quantum hardware, processors, ancillary units, and R&D hubs supported by quantum high-performance computing (HPC) data centres.' The minister said the state is already home to India's first commercially deployable quantum computer, built locally in Bengaluru by a team of Kannadigas. 'This computer is not just a proof of concept but a testimony to determination. Developed indigenously, it is already delivering commercial services,' he added. The state has already set up a Quantum Research Park at IISc Bengaluru, which has supported over 55 research and development (R&D) projects and 13 startups, while training more than 1,000 quantum professionals annually. To boost its activities, the state has sanctioned an additional Rs 48 crore in funding. Karnataka Thursday also announced plans to establish India's first Quantum Hardware Park, along with four innovation zones and a dedicated quantum chip fabrication facility, expected to be operational by the end of this year. 'Quantum chip fabrication capability will be operational by the year-end. This will enable domestic production of advanced quantum components and devices,' Boseraju said. The minister also emphasised the need for policy flexibility from the Centre to enable state-level innovation. 'The Government of India has launched the National Quantum Mission with an outlay of Rs 6,000 crore. For its successful implementation, the Centre must allow Karnataka to lead with innovative and decentralised approaches,' he said, addressing DST Secretary Abhay Karandikar. To develop talent across the state, the science and technology minister said, Karnataka will roll out a quantum curriculum at the higher secondary level in both English and Kannada under its Stream Labs initiative. The state will also introduce quantum skilling programmes in 20 colleges, expand DST-funded PhD fellowships to 150 students, and take these programmes to tier-2 and tier-3 cities and over 20 universities. The roadmap is structured around five strategic pillars: talent development, R&D pilots, infrastructure, industry support, and global partnerships. Karnataka also aims to develop 1,000-qubit quantum processors and pilot real-world applications in healthcare, cybersecurity, governance, agriculture, and early disease detection.