
NCSCM confirms only 50m Coastal Regulation Zone buffer applies to Palk Bay coastline
's National Centre for Sustainable Coastal Management (NCSCM) confirmed that only a 50-metre Coastal Regulation Zone (CRZ) buffer applies to the Palk Bay coastline—not 500 metres as claimed by a petitioner.
Tired of too many ads? go ad free now
This means that development controls along the coastline could ease significantly.
Petitioner Arul Raj, a Ramanathapuram resident, sought directions to quash draft CZMP map numbers TN 44 to 60, arguing that Palk Bay was part of the sea and should therefore be subjected to a 500-metre CRZ as per the 2019 Notification.
Filed before the National Green Tribunal (NGT), NCSCM's submission draws on the CRZ Notification, 2019, and official hydrographic charts to classify Palk Bay as a tidal-influenced water body.
Under the notification, such water bodies attract only a 50m buffer from the High Tide Line (HTL), not the broader 500m applicable to open sea stretches.
This interpretation reaffirms that only a smaller stretch of coastal land is subject to regulation, potentially opening up more area in Ramanathapuram and Pudukkottai districts for fishing infrastructure, tourism, and livelihood-based development. "While it could unlock economic opportunities along the southern coast, it also raises the possibility of increased ecological pressure in the absence of proper safeguards," said B Raja, an environmental activist.
Following the Tribunal's direction, NCSCM conducted ground-truthing on March 15, 2025, across 20 coastal sites from Rameswaram to Manamelkudi. Scientists used handheld GPS devices to verify the presence of mangroves, salt marshes, and fisheries-related structures depicted in the draft CZMP maps.
The petitioner based his claim on light blue shading in the draft maps, interpreting it as a 500-metre CRZ zone. NCSCM clarified that the colour was a draft-level visual error—not a legal demarcation. It added that the maps would be corrected if such errors were pointed out during public consultations.
The Tribunal is scheduled to hear the matter on July 17.
Email your feedback with name and address to southpole.toi@timesofindia.com. MSID:: 121937674 413 |
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
14 hours ago
- Time of India
22 sea-facing buildings on ECR face demolition after CRZ violations flagged
Chennai: As many as 22 beach-facing residential buildings in Muttukadu on East Coast Road (ECR) face the threat of demolition, with the Chengalpattu district administration identifying them as violators of Coastal Regulation Zone (CRZ) rules. The identified buildings—some completed, others still under construction—are located within the No Development Zone (NDZ) of CRZ III, where permanent structures are banned within 200 metres of the High Tide Line. At least six of these were found to be under construction even during the inspection, indicating ongoing activity despite regulatory restrictions. Others are upscale, completed buildings, with some even having two floors, built along the fragile coastal stretch at Muttukadu. These findings were part of an Action Taken Report submitted by Chengalpattu Collector S Arunraj to the National Green Tribunal (NGT), which took suo motu cognisance of the matter. The collector's team, comprising revenue and environmental officials, carried out GPS-tagged inspections and submitted photographs and ownership details to the Tamil Nadu State Coastal Zone Management Authority (TNSCZMA) to initiate action. The case, heard on Thursday, saw the tribunal's expert member Satyagopal Korlapati ask pointed questions on why no demolition was initiated so far, given that violations were already acknowledged by the administration. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Trade Bitcoin & Ethereum – No Wallet Needed! IC Markets Start Now Undo The NGT also noted that the District Collector, as chairman of the district coastal zone management authority (DCZMA), was expected to act decisively against such illegal developments. In response, the state coastal zone management authority (SCZMA) informed the bench that it forwarded the list of violators to the Union Ministry of Environment, Forest and Climate Change, seeking clarification on whether it had the authority to directly carry out demolitions. The NGT is now expected to decide on whether demolition can proceed without waiting for further directions from the Centre. The matter is likely to be taken up in the coming weeks.


Time of India
17 hours ago
- Time of India
UT races against time to clear Dadumajra dump before NGT hearing
Chandigarh: With the clock ticking and monsoon clouds looming, the Chandigarh municipal corporation has pledged to clear the third garbage dump at the Dadumajra dumping site by the end of July — a task that has already missed multiple deadlines and now carries the weight of a looming National Green Tribunal (NGT) hearing in September. At the heart of the issue lies a mountain of waste — 1.25 lakh metric tonnes, to be precise — sprawled across the Dadumajra site. The cleanup, estimated to cost Rs 10 crore, has been repeatedly delayed, with the rains proving to be the biggest spoiler. "Once it rains, the waste becomes waterlogged and heavy, making it nearly impossible to move. It takes days just to resume operations," said an MC official on the condition of anonymity. The urgency was palpable during a high-level review meeting chaired by the UT chief secretary. Senior officials from the MC and Chandigarh Pollution Control Committee (CPCC) gathered to assess progress on NGT-related issues, with Dadumajra dump dominating the discussion. "This isn't just about garbage—it's about accountability," said a senior official. "The NGT is watching, and we have no choice but to deliver." But the dump isn't the only concern. The meeting also reviewed the status of other critical environmental projects, including new sewage treatment plant (STP) in Faida village, laying of tertiary treated (TT) water pipelines, functioning of newly upgraded STPs, restoration of the city's choes (seasonal rivulets). The chief secretary has issued a clear directive: all pending and planned works must be completed before the NGT hearing in September.


Time of India
a day ago
- Time of India
NCSCM confirms only 50m Coastal Regulation Zone buffer applies to Palk Bay coastline
's National Centre for Sustainable Coastal Management (NCSCM) confirmed that only a 50-metre Coastal Regulation Zone (CRZ) buffer applies to the Palk Bay coastline—not 500 metres as claimed by a petitioner. Tired of too many ads? go ad free now This means that development controls along the coastline could ease significantly. Petitioner Arul Raj, a Ramanathapuram resident, sought directions to quash draft CZMP map numbers TN 44 to 60, arguing that Palk Bay was part of the sea and should therefore be subjected to a 500-metre CRZ as per the 2019 Notification. Filed before the National Green Tribunal (NGT), NCSCM's submission draws on the CRZ Notification, 2019, and official hydrographic charts to classify Palk Bay as a tidal-influenced water body. Under the notification, such water bodies attract only a 50m buffer from the High Tide Line (HTL), not the broader 500m applicable to open sea stretches. This interpretation reaffirms that only a smaller stretch of coastal land is subject to regulation, potentially opening up more area in Ramanathapuram and Pudukkottai districts for fishing infrastructure, tourism, and livelihood-based development. "While it could unlock economic opportunities along the southern coast, it also raises the possibility of increased ecological pressure in the absence of proper safeguards," said B Raja, an environmental activist. Following the Tribunal's direction, NCSCM conducted ground-truthing on March 15, 2025, across 20 coastal sites from Rameswaram to Manamelkudi. Scientists used handheld GPS devices to verify the presence of mangroves, salt marshes, and fisheries-related structures depicted in the draft CZMP maps. The petitioner based his claim on light blue shading in the draft maps, interpreting it as a 500-metre CRZ zone. NCSCM clarified that the colour was a draft-level visual error—not a legal demarcation. It added that the maps would be corrected if such errors were pointed out during public consultations. The Tribunal is scheduled to hear the matter on July 17. Email your feedback with name and address to MSID:: 121937674 413 |