Enthusiasts enjoy Cars and Coffee on Memorial Day Weekend
CLARKSBURG, W.Va. (WBOY) — Cars and Coffee was held in front of the Hobby Lobby on Emily Drive Sunday afternoon, allowing car enthusiasts to show off some of their best rides including convertibles, antique cars, sports cars and more.
Organizer of Cars and Coffee Joseph Vaughn said of the event, 'Seeing all my friends that I've met through the hobby of cars and just hanging out really is the big thing I like about it. It's a great way to spend a Sunday afternoon.'
High school senior wins $1,000 scholarship from Genealogical Society
As many as 200 cars have come to a single event. If you want to see some sweet rides, you can follow when the next Cars and Coffee is happening on their Facebook page 'Cars and Coffee Bridgeport'. They typically do 'Cars and Coffee' once a month on Sunday in front of the Hobby Lobby from 12 p.m. to 2p.m.
Along with the Sunday 'Cars and Coffee', there's also sometimes the Saturday evening 'Cars and Cold Treats'.
Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles
Yahoo
an hour ago
- Yahoo
New closures to begin for $237 million ‘I-70 Kansas City' project
KANSAS CITY, Mo. — As a part of the Improve I-70 Kansas City project, roads around the Benton Curve will be closed. Beginning around 6:30 a.m. on Friday, there will be a long-term closure of Benton Boulevard beneath Interstate 70 between Truman Road and 13th Street. The I-70 westbound on-ramp will remain open to southbound traffic on Benton Blvd. during the closure. Truman Road, Indiana Avenue, and 13th Street will be the routes of the designated detour. Download WDAF+ for Roku, Fire TV, Apple TV The planned closure period is through the summer of 2027. The Improve I-70 KC project focuses on the five-mile stretch of Interstate 70 in Kansas City between The Paseo Blvd. and US 40/31 St. This section of I-70, according to Missouri Department of Transportation. The $237 million project will upgrade connectivity in areas with high traffic congestion during rush hours and traffic incidents by replacing aging infrastructure. Twenty-six bridges and twelve interchanges will be replaced or refurbished as part of this project. MoDOT said the project will improve the safety and reliability of this section of I-70. Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.
Yahoo
3 hours ago
- Yahoo
Power tool company recalls chainsaws over fire hazard
(WHTM) — Ahead of Father's Day weekend, check to make sure the perfect power tool isn't on a recall list. The consumer product safety commission recalled more than 7,000 battery-powered chainsaws. The motor in the DR Power Equipment lithium-ion chainsaws can overheat during operation, posing fire and burn hazards. Close Thanks for signing up! Watch for us in your inbox. Subscribe Now So far, consumers reported 20 incidents of fire, smoke and sparks. No injuries have been reported. The chainsaws have a black handle and orange buttons with the label DR Pulse 62V. The recall affects models sold from June 2018 to July 2024 with the following model numbers: 414170, 414181, 41418 and 414170R. Consumers can contact DR Power Equipment with proof of destruction for a pro-rated refund based on the product's age. They should only dispose of the lithium-ion battery at a municipal household hazardous waste collection center. Got a scam DMV text? How they got your number There were 7,180 units sold in the United States, as well as an additional 21 units in Canada. Contact DR Power Equipment here. Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.
Yahoo
3 hours ago
- Yahoo
Blue Bridge expected to close for 90 days this summer
HENDERSON, Ky. (WEHT)- Repairs to safeguard the iconic Blue Bridge in downtown Owensboro are scheduled to begin this summer. Owensboro Davco residents displaced by fire welcomed in Bowling Green The repairs will happen on both sides of the Ohio River and will include a new concrete driving surface. The repairs will require a 90-day closure, which is expected to begin after the Fourth of July holiday. Prep work is scheduled to begin on Monday, June 9, with single lane closures across the bridge lasting through June 11. The full closure will begin after the July 4 weekend to replace the bridge deck, make concrete repairs, and repair bridge joints. While the entire project is slated to last through November, the Kentucky Transportation Cabinet is limiting the actual bridge closure to 90 days or less and plans to conduct any work that does not require a full closure outside of that time period to reduce impacts on traffic. Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.