
MLA Ashok Rai urges quick tendering to fast-track Puttur medical college construction
MANGALURU:
MLA
Ashok
Rai
has urged Karnataka's
finance
department to expedite the tender process for the proposed Government Medical College in Puttur, calling for completion within 45 days to avoid delays in launching the project.
During a meeting in Bengaluru on Wednesday, Rai discussed the project's progress with Finance Secretary Dr PC
Jaffer
and other officials, including Dr Ritesh Singh and
Dr Vishal
. He informed them that the land survey for the project has already been completed and that the construction of a 250-bed hospital was the next step.
The MLA emphasised the importance of adhering to a strict timeline for the tendering process, warning that any delay could hamper momentum. He said the matter was also highlighted by Chief Minister Siddaramaiah during the recent inauguration of the new
Dakshina Kannada
Deputy Commissioner's Office in Mangaluru.
Rai confirmed that the proposed medical college would be built on the identified site in Bannur and that all procedural steps would begin shortly. He appealed to the finance department to extend full cooperation to facilitate the timely launch of construction.
Seeks funds for retaining walls
Separately, the MLA submitted a request for ?2.5 crore to construct two retaining walls in his constituency. Of this, Rs 50 lakh is earmarked for work in Nellettimaru, Panaje village, and ?2 crore has been sought from the Minor Irrigation Department for a wall near the Kumbra Markazul Huda Women's College in Olmogeru village.
The proposal was submitted to Minor Irrigation Minister
N S Boseraju
.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Scroll.in
34 minutes ago
- Scroll.in
‘Shows apathy': Allahabad HC raps UP government for delay in disbursing Kumbh stampede compensation
The Allahabad High Court on Friday said that the delay in disbursing compensation to the families of those who died during a stampede at the Maha Kumbh Mela pilgrimage site in Prayagraj showed the Uttar Pradesh government's 'apathy to the plight of the citizens', Live Law reported. A bench of Justices Saumitra Dayal Singh and Sandeep Jain also directed the state government to furnish details of the deaths and medical handling of those who died or were injured between January 28 and the end of the pilgrimage. The Bharatiya Janata Party government in the state was also told to submit details of the number of compensation claims it had received and settled, and those that are pending. The stampede had broken out at the Maha Kumbh on January 29 as a large number of pilgrims arrived to take a holy bath on the occasion of Mauni Amavasya, a spiritually significant day in the Hindu calendar. The state government has said that at least 30 persons were killed and 60 others were injured, although several media reports have suggested that the actual toll could be significantly higher. Uttar Pradesh Chief Minister Adityanath had announced financial assistance of Rs 25 lakh for those who died in the stampede. The court was hearing a plea filed by the husband of one of the persons who died. It expressed concern that the woman's body had been handed over to her family without a postmortem being conducted. The judges took note of the serious injuries reported on the woman, including a crushed rib cage, and questioned the lack of official documentation or communication with the family regarding the cause and circumstances of the death, Live Law reported. The bench directed that medical institutions and authorities in Prayagraj be made parties to the petitions and directed them to file affidavits disclosing details of all patients and dead bodies that may have been brought to the facilities and those dispatched by them between the incident and the end of the Mela. The bench was alarmed that the woman's body was handed over to the family in February but compensation was yet to be provided, according to Live Law.


Mint
an hour ago
- Mint
Bajaj Finance board fixes record date for 1:2 stock split, 4:1 bonus share issue. Check details here
Bajaj Finance, on June 6, announced the record date for for 1:2 stock split and 4:1 bonus share issue. The NBFC stock closed 5 per cent higher on Friday at ₹ 9,372 apiece. According to the exchange filing, Bajaj Finance has set Monday, June 16 as the record date to determine eligible shareholders for both stock split and bonus share issue. 'We wish to inform you that the Company has fixed Monday, 16 June 2025 as the 'Record Date' for the purpose of determining the members, eligible for the sub-division of existing equity shares and issue of bonus equity shares of the Company,' the company said in the filing. In an another exchange filing dated April 29, the company announced that the board has approved the stock split in the ratio 2:1, which means each existing share with a face value of ₹ 2 will be divided into two fully paid-up equity shares with a face value of ₹ 1 each. 'Sub-division of 1 (one) equity share of face value of Rs. 2 each fully paid-up into 2 (two) equity shares of face value of Re. 1 each fully paid-up,' the company said in the filing. The Bajaj Group company also announced a bonus share issue in a 4:1 ratio. This means eligible shareholders will get 4 bonus equity shares of face value Re 1 each for every 1 fully paid-up equity share they hold, also of face value Re 1. ' Issue of bonus equity shares in the ratio of 4:1 i.e., 4 (Four) bonus equity shares of face value Re. 1 (Rupee One) each for every 1 (one) equity share of face value Re. 1 (Rupee One) each fully paid up,' it added. The company had also announced a final dividend of ₹ 44 per share (2200 per cent) of face value of ₹ 2 each for the financial year 2024-25, with May 30 set as the record date. For the March quarter, the company reported a 19 per cent year-on-year (YoY) surge in its consolidated net profit to ₹ 4,545.6 crore. Net interest income (NII) was slightly below projections, coming in at ₹ 9,807.1 crore compared to the expected ₹ 9,880.9 crore. The company's Assets Under Management (AUM) grew by 26 per cent YoY, reaching ₹ 4.17 lakh crore as of 31 March 2025. An addition of ₹ 18,700 crore during the quarter highlights consistent credit demand. Disclaimer: This story is for educational purposes only. The views and recommendations above are those of individual analysts or broking companies, not Mint. We advise investors to check with certified experts before making any investment decisions.


NDTV
an hour ago
- NDTV
Tata Harrier.ev Acceleration Test- Can It Pull Off the Tablecloth Challenge? Watch
Tata has been launched in the Indian market, and the brand has already revealed all the specifications of the electric SUV. But it seems like the automaker is not done. They are now going ahead to demonstrate the real-world application of the numbers. Before the launch of the SUV, the automaker had revealed a clip of the vehicle climbing the elephant rock to demonstrate the AWD system. Now, it's the demonstration of its acceleration. Tata Motors has released a new video putting the through an acceleration test. The demonstration is done by the tablecloth challenge. The video begins by showing the electric SUV. Later on, it shows a table with various dishes on it, placed on a tablecloth. The EV then gets a launch from a dead stop, with one end of a rope tied to the vehicle and the other end to the tablecloth. With its fast acceleration, the vehicle manages to pull the tablecloth without disturbing the utensils. The feat became possible because of a dual motor setup consisting of a 155 hp front motor and a 234 hp rear motor. The max torque output stands at 504 Nm. Using this power, the SUV can accelerate from 0-100 kmph in 6.3 seconds. It is to be noted that at the time of performing the task, the electric vehicle was in Boost Mode. Apart from that, it also has Sport, City, and Eco modes. Tata is available with two battery pack options: 65 kWh and 75 kWh battery packs. The bigger battery pack gives 627 km of claimed range. The brand claims that using a 120 kW DC fast charger, the EV can offer a range of up to 250 km within 15 minutes of plugging in. It can also go from 20 to 80 per cent in 25 minutes. All of this comes at a starting price of Rs 21.49 lakh (ex-showroom).